Loading...
HomeMy WebLinkAbout042 A501.pdfAP VJ Keynote Legend N Key Lower Tr —70 EL uss Bearina A--, Value Keynote Text 5 �-' -\� 10'- 1 1/2" A405 F3-8] 1 " W , all-Mourit-Sink 6" 4'- 0" 2 Wall -mounted ADA-compliant mirror 1'- 4" 3 Toilet 12 2 V N­ -411­1-1.111 'Microwave -Shelf 39 5 Solid Surface Countertops w/ 4" integral backsplash - refer to finish T 6" C14 [47 -19 �­, t schedule fffl fffl '41 1 4', -In Pet Tub 6 Walk 0 7 Plastic Laminate -Faced Wall Cabinets 0 M 8 St ai n I e s s S t ee I F a ced Ba se Cabi nets 4/1, (D `43 NJ (0 C W d L42] [T21 43 Plastic Laminate -Faced Base Cabinets 1%J ore . . . .. .... �,P of Slab-, Top of Slab Top of'Slab. 9 1 -011 o,-o,, 01-0 01 10 Solid Surface Transaction Ledge E T 6k�%ZQO-Aft ,5,."At 0 11 Stud -framed GW13 Soffit CE < 12 Aluminum Storefront Framing & Glazing > 02 Lobby - South 05 Men - South 05 Men - West Z 13 Acoustical C ailing Tile in Suspended Grid - refer to finish schedule W (3) U014L 5 -04N - Similar Reversed 114" 1 1-01' -04N - Similar Reversed 1 - 4 Hol - I , ow -- M eta - I ­ Doo - r I F I ra - me -J 0Z 1/4" 11-01, Note: At all 3 etched glass panels, etching 114"z 1%0" -36E - Similar 05mW -36E - Similar 0 shall include "animal silhouette" cut-outs -37W - Similar Reversed -37W - Similar Reversed 15 i New Refrigerator W > CC) (one @ ea. panel). Final Mhouettes to be -0-0 provided by the architect during construction. -51 W - Similar C:) Q -50W - Similar Reversed 16 New Microwave I W CC) (Y) Upp.erl'Trulss Bearing &--,, POT% co 0 ----------- - --- 14' - Oil D-i-shwalsher (0 0 18 Alu minum Windows 0 _J 0) C\J 19 Stainless Steel Faced Countertops w/ matching stainless steel 0 CC 4 C� Ir- IZI- backsplash panel up to underside of wall cabinets < (Y) CY) "0111011"No 0 = 20 Metal Lockers 0 r-4-1 ­­ 11 1 11 - ­ I - - I - I I - - I - I ... I- I'll 1 11-1 U — C) LL 21 Suspended Acoustic Tile Ceiling,11,111--­- 22 Grab Bar Ass e mbly F121-, F4 7 4-1-41 23 131111-ox"1111" 1171-Glass-Tile 24 Solid Surface Transaction Ledge Support 7 5 N 25 Aluminum Sliding Assembly by storefront manufacturer - Single 24 4� A404 9 r21--1 Glazed, w/ locks 7L 16 T �D 71 26 Ceramic Tiling 27 Cat Condo ............. 128 6" Resilient Flat Base N. 8 C) S---t--e--e-i--F""'a--"c-e'd''-C-ountertops w/ 4" backsplash c A _,Tqp,q' Slab Top o ITop of Slab A---� �Tpp o 29 Stainless _71 F -7 L f Slab A-, f Slab 30 Plastic Laminate Faced Utility Cabinets w/ Adj. Shelves 01-011 Of '70 01 oil 8 31 Wall-moun''t""e"'d-''F'r"a--"'m'-'-'e-l-ess Mirror 32 Plastic Laminate -Faced Countertops w/ 4" Backsplash 1 A**& Awk AIN& 02 Lobby - West S 06 Meeting/Training - South S 10 Laundry/Grooming - South 14 Food Prep Kitchen - South 33 Side Transfer Shower Stall 11-011 T-0 I� T.011 6-"­Vi.nYl .-B-ase-1 U'2-W114 Ub 1/4" 10 1/4" 14 %il/4 1 1-0 11 35 M - icro , wa I ve per Allowance 36 Refrigerator - per Allowance 37 1/4" Tempered Etched Glass 38 1/4" Clear Tempered Float Glass 39 Solid Surface Transaction Ledge (42"h) 40 Plastic -laminate -faced plywood single -acting gate w/ (2) spring -loaded hinges at hinge side; painted wood stop & stainless steel slide latch @ 404 latch side Lower Truss Bearigg... Lower Truss Beanng_ A--� 41 Storefront Framing - attach directly to countertop and front of reception < 2� 10' - 1 /2" 21 10' - 1 1/2" ''desk wall; break countertop overhang @ storefront framing 21 -H-2-1 42 Aluminum spandrel panels ---F2-7� �46 FE] 7 43 Solid Surface Work Surface (30"h) T 1, 7 44 New Clothes Dryer 45 New Clothes Washer 46 Cat Condo Litter Box Unit, typ. L 8 7 ANSI 117.1 -Compliant Grab Bars 4 8 48 Pipe -wrap insulation at all exposed undercounter plumbing piping, typ T� F �6- Top of Slab Top of,S!pb OL Jop of Slab of oil 01 oil 01 -011 14 Food Prep Kitchen - West 24 Feline Adoption Corridor - South 24-North Sim. Reversed 33 Medical Procedure - South 1/4" 14" - 8 Condos ea, side (16 total) 4�W 20%4mb 11411 336114" 1%0" - 4 Lifter Box Units ea. side (8 total) 2 2 Lower Truss Bearing'' OU, Lower Truss Bearing Lower Truss Bearing Af-� Lower Truss Bearing Lower Truss Bearing Lower Truss Bear'!qg, A-\ 10' - 1 1/2" 10'- 1 1/2" 10'- 1 1/2" J 10. 1 1 /2" /-021 10' - 1 1/2" I-F2 11 10'- 1'1/2" 7 7 31 20 21 7 1, 6" L T 22 JL— t IILI — - A- 18 L A 34 _771 QD i f� 1, � ­­ I CD I Open Below L Top of Slab �f Top, of Slab dr, Top of Slab -40 1 1 :L.:m - - I Top of Slab --L �1TIqip of Slab Of "I'll -- I I � ir (D 01-0 011 01 Oil 01-011 #5� 01-01, 48- U) 35 Staff/ACO Corridor - East (Lockers)— 44 Storage/Corridor - North 46 Animal Receiving - East 46 Animal Receiving - South 48 Food Prep/Storage - East 51 Men's Staff Toilet/Lockers - South %Aoj*&5b�E114" 11-01T 44-N114 IT 1 1.0 IT 4b-E1/4 11 1 1-0 11 40 6114" 1%0" 48mE 114" 11.011 51 6114" 1'-0" E (D M C) CX3 C) a) C) cz 0 W --- Lower Truss Bearing.".All, Lower Truss Bearing, Lower Truss Bearing, Lower Truss Bearing C13 :> -------- Lower Truss Bearing, C.) 1�­_-,­­­ - C) C- G) 21 10'- 1 1/2" 10, - 1 1/2, 121'' 10 1 1/2" 0 1 (D 21 10'- 1 1/2" 10'- 1 1/2' 44 CZ E —01 UJ 7 7 , T J 7 4 4-351 5— CD L 7 L�� -T CIO J 19 /-Jg29� 29 C 'i 8 -F321 01 F4-41 PROJECT PHASE: F an I Z- Top Top of Slab Permit Drawings bp ol F 45 Top of Slab Tor) of Slab Top of Slab of S!ab', Top of Slab —b, 01-001 01 -Off �,Ar 0. PRO JECT #: DATE - left K Is mW 52 Lau nd ry - West 53 Cleaning - East W58 Cat Tray Cleaning -West ' 62 Quarantine/Euthanasia Corridor - South 64 Euthanasia - East West W 70 Staff Break 0906 2012.12.27 SHE Tl� L I %-IJUC I T.01 11-011 11,011 I -of R;- liance - SLD 52 114" 53-El/411 1/4" U2 0114" 64-Ei 14l' 1 1-011 7u 1/4 1 1.0 Il r r (6 2 4N JJ