HomeMy WebLinkAbout036 A402.pdfAe
Clear from Clear from
1' - 10 1/2"
VA.F.
Detail @Crematory Stack
1 1-on Note: Crematory to be relocated by owner (NIC); Contractor shall be
responsible for roof detail @ crematory stack, including framing, finishes,
rain collar, flashing, etc. - coordinate installation with owner & crematory
manufacturer (all details to be in accordance with crematory manuf.
installation instructions),
Wall Section @Main Building Fire Wall - Exterior
3/4" = l'-O"
s across
iverhang
r Truss Beanrig.."
00 M
em*ml
ff a
J"'h Detail @Garage Door Threshold
1'-0"
M
WITATIMA
•
Sallyport Bearing ,
1 V- 5 1/2"
Lower Truss Bearing
10' - 1 1/2"
ZMMB ==
Sim
5
A401,
C� ! 1
B.C. Soffit
framing
2 121 _/316
eynote Legend K
Keynote Legend
Key
Key
Value
Keynote Text
Value
Keynote Text
i26
4" Conc. slab w/ 6x6 WWM on 15 mil vapor barrier on 6"
52
(2) Simpson 1/4" x 3" SDS screws at 12" O.C. to truss
crushed stone on well PoTpacted soil
3" Thick Perimeter slab/foundation insulation board.),
53
bottom chord, typ.
L6x6x3/8 V-0"
�27
x clip angles @ 4'-0" O.C. fitted between
(R-1 5), 2'-0" eadirection, typ.
truss members, typ. w/ vertically long slotted holes at
28
x x 16 CMU - grout solid
bolts
1 29
Insulated Sectional Garage Door - see schedule
54
------ -
(2) 5/8" Hilti RE 500 epoxy anchors @ U-0" O.C. @ each
130
Continuous Bond Beam w/ 2 #4 bars @ 24" oc. lap bars
clip angle - embed 4" in CMU with no nut installed, typ.
2'@ splices
(framing designed to pull away from CMU in event of fire)
31
1 Treated M
55
W8x21 - bear beam and plate 8" each end
32
13/4" Plywood
56
Infill w/ CMU
33
Return EIFS @ Head & Jamb
57
1/4" bottom plate
34
5/8" M.R. Gypsum Wallboard Ceiling
58
Flashing Collar - match metal roof
35
. ..... -
(3) #5 bars continuous, lap 2'-3" @ splices
59
2x1 0
36
#4 dowels @ 48" O.C. w/ std. hooks in footing - grout
60
DbI 2x8 Header
- - ----
solid @ dowels
61
Fiber cement panel
37
8" x 8" x 16" CMU
62
Fiber cement soffit
38
5/8" Plywood
63
New crematory unit rain collar (include in this contract -
39
5/4 x 6" "Azek" Soffit/Rake trim ll
not by owner), install in accordance with crematory
40
1/2" Anchor Bolt @ 48" O.C. typ.
manuf. details, including all counterflashing
41
11-1-1-11 _11 11111-1-- 11 111 i
Wall/roof flashing & counterflashing - match metal roof
64
Joist hangers, typ.
42 --- ---
Hardie I I 11 Soffit Board 11 w/ I cant. - - - vent 11 I -------
65
1/2" galvanized steel threshold plate wl 112" max lip typ
@ garage doors
43
Joint Sealants
66_
Concrete Apron
44
1/16' x 1.5" GaIv. Steel Straps 16" oc.
6-7
Roadway Paving - refer to site drawings ings for details
45
Through Wall Flashing
46
20 ga. Corrugated Tie - Refer to specifications for
s-pacing-11-
47
EIFS reveal
48 '3/4"
EIFS Projection
49
3/4" Expansion Joint
50
Vented Hardie Soffit Board
151
Continuous (stepped to match roof slope) Bond Beam w/
2 #4 bars @ 24" o.c. lap bars 2'@ splices
TT 1 �16
4 L4
00
/A\
Y
Sall lyport'Bearing
11 5 41 /2
It
t
34
I.
11 Lower Truss Bearing
"op oaf Slab Top of Slab -1 op" of Slab A---� Top of
T oil
Or 01-011
-W _Slab
1IAw 77—
vA
-
14,M-N 7
am ,
2 27
T 1 0 of Foo,+,IN�_ a\ Top, of Footlqg_ Top of Footing Top of Footing,nii"
4-411
4 6
2
cr)
L "
Cl)
22
E
10 112" 553i8" 5 7/8"1
j Qi 111 5/6" EQ, ECG EQ
011
2-
0" Z 0"
X
2 Section @Building to Salliport Firewall
314" = I$_011
0%
Wall Secton @Sal I i port Gairage Door
4 Wall Section �gKennel End Wall
314" = 11.01$
0)
-leea
CZ
)0
c
C\J
W
0
0)
E
+
Q)
Lli
C\1
<
>
0
0
Z
U!
C;
4-a
W
0
Cn
%U
't
CO
,I-
00
0
r-_
Cc
<
Cf)
M
0
-71rz
I
(D
U3
ICU
FE U)
CU
Id
4.—
C-) co
(D
C) v 5
CU
10
M E
C= C)
U) <
:> M
CU Co
C-D
CUqr- ftcu
C:>
Q
PROJECT PHASE:
Permit Drawings
PROJECT#- DATE.-
0 9 0 2.12.27
or- coce
liance - SED
COM
at ri