HomeMy WebLinkAbout028 A101b.pdf4-a
40 *&
Al
W
4-a
a �
CZ
0)
?MTN
0
0
Lu
0
CD
E
+
Li
<
>
0
0
z
Ui
Cn
Cn
:=J
0
Cn
0)
't
0
UJ
CO
cq
F—
0
0)
CM
0
<
Nt
U_
T,
S
Quarantine I
X/
f n v
.Entry,
A
Vestibule
0 10
P",
A602
T'
2' -EQ EQ
I I s 0
(D
077!7 Q I cz
Cn
OL
SF05\ <3 cr,
'11, A40 Cp C)
<D CD
< 0
C-
\-
U LL_
Cz t- C3 E
Partial Floor Plan #3
1 T-00
1/4"
Plan North
C_
Keynote Legend
Keynote Legend Keynote Legend
Z5 � C)
Key Key
Key 7Z I Ui
Value Keynote Text Value Keynote Text Value Keynote Text
PROJECT PHASE:
[1 -Metal Lockers �10 Desigf iated Recycling Area 118 New Clothes Washer
2, --Plastic- Laminate- Faced --U-,-ti"l-it-y--Cabinets -�-w-/--A---d--j-.-Shelves - I'll ANSI -Compliant Grab Bars !,New Clothes Dryer Permit Drawings
�3 Recessed Walk -Off Foot Grilie 12 Existing crematory unit to be relocated, delivered and installed by others - roof �20 Existing Dishwasher to be. delivered by owner - contractor shall be responsible for 1
penetration details (as shown in detail 5/.A402) and al! ulility connections for
PROJECT* r-
13" O.D. perforated irrigation piping @ -15" O.C. typ. @ front porch overhangs - instal!ation and utility connections required for proper operation
;2 [P_la,s_t_ic,_ Lamina -,be- Co-unterf'o ps''-
complete functionality are the responsibility of the contractor
connect to adjacent downspouts (refer to site plan)
115 Prefinished metal support brackets - equal spacing �13 Aluminum corner guard typ, @ outside corners, end, walls, cased openings, etc. 09 evie e 12. Z7"
22 Plastic Laminate -Faced Waill Cabi tcc� t s
6 Plastic-lamir,tsfaced plywood single -acting gate. w/ '2) spring -loaded hinges at i 114 i 8" CM U wall nce
SIHI ET NUM SLD
hinge side; painted wood stop & stainless steel slide latch @ latch side 15 i Full -height 3/4" plywood IT/Phone backer board, along esitire length of wazalii
7 Solid surface countertops above 1 116 In -slab floor safe to be flush -installed in floor, slab - coordinate final. location wiv,! "JAN 4 20 13
8 CT-1 - 12" Ceramic tile (border) in patterns as shown; refer to finish sch&dule o,,ne,
a
9 T-2 - 12" Ceramic tile (field) in patterns as shown; refer to finish schedule -17 Hatching denotes 6" Metal studs @ 16" O.C. U
Al 111- 1 1 -1 1 1 1 - --I-- i
LL7