Loading...
HomeMy WebLinkAbout021 C403.pdf-IN 4 �7 77% -7 '77., 7777 LEED S.S. CREDIT 1 SITE SELECTION: ALL BUILT -UPON AREAS SHALL MAINTAIN A MIN. 50' CLEAR BUFFER FROM ALL PERENNIAL AND ITERMITTENT SURFACE WATERS. 50-1/ FOREBAY PRETREATMENT AREA CLASS A EROSION CONTROL STONE 011 11' DEEP LINED W/ FILTER FABRIC 69 PLAN11_bl1G SCHEDULE:- 0 A, A, A, SURFACE OF BIORETENTION CELL GRASS BUFFER STRIP. INSTALL SHALL BE PLANTED WITH SOD WHERE CD/ 4P OTHER GRASSES ARE NOT INDICATED. SOD BETWEEN BIORETETION AND CURB LINE (TYP.). TOP OF SOD -VEGETATED BERM (TYP.) TOP ELEV.=862.5 MIN. TOP WIDTH 5' MIN. 3:1 MAX SIDE SLOPES SCH. 40,PVC CLEAN -OUT MIN. FOR UNDERDRAIN W/SCREW OFF CAP. IN� L, MIN. 12" ABOVE GRADE (TYP.). (7) CLEAN -OUTS SHOWN A S PERFORATED 4" SCH 40 PVC UNDERDRAII� J 18" ADS N-12--,\,,, (TYP.) HDPE OUTLET PIPE INV. OUT=856.1 STANDARD PRECAST YAR INLET: MEETING NCDOT SPEC 6" CONCRETE TOP W/2' X GRATE MIN. (NEENAH R-3339- OR APPROVED EQUA TOP EDGE GRATE-_860.7 INV. IN=856 71 INV. OUT=856. 8' WIDE OVERFLOW SPILLWAY ELV.=861.5 CLASS B EROSION CONTROL STONE W/FILTER FABRIC ow lox 07- 4 NOTES: 1 . ALL BIORETENTION FACILITIES SHALL HAVE A MINIMUM 20 FOOT ACCESS EASEMENT CONNECTING TO A DEDICATED PUBLIC RIGHT OF WAY. ACCESS ROAD SHALL HAVE MIN. 12' STABILIZED WIDTH, MAX. LONG. GRADE OF 15%, MAX. CROSS -SLOPE 5X 2. ALL DRAINAGE AREAS TO A BIORETENTION FACILITY ARE TO BE STABILIZED PRIOR TO INSTALLA11ON OF AMENDED SOILS, MULCH OR PLANTINGS. 3. BIORETENTION CELLS ARE NOT LOAD -BEARING STRUCTURES, DO NOT COMPACT THE BOTTOM SOIL LAYER. WHEN EXCAVATING THE BOTTOM 12" LAYER OF SOIL, RAKE THE TEETH OF BACKHOE BUCKET TO SCARIFY AND TILL SURFACE INSTEAD OF USING THE BUCKET TO SCOOP AND MAKE THE SURFACE SMOOTH. 4. AVOID EXCAVATING IN WET CONDITIONS OR WHEN STORM WILL HIT BEFORE CELLS FILL MEDIA CAN BE PLACED. EXCAVATION BEST AFTER SEVERAL CONSECUTIVE WARM IND DRY DAYS. 5. AMENDED SOIL WILL ONLY BE PERMITTED WITH A VALID SOIL ANALYSIS REPORT. NO AMENDED SOIL SHALL BE ALLOWED ON THE SIDE SLOPES. 6. INSTALL STRUCTURAL PLASTIC RACK (STORMRAX), OR GALVANIZED RACK AROUND ALL OUTLET OPENINGS TO PREVENT LOSS OF MULCH. 7. PVC UNDERDRAIN PIPE SHOULD HAVE 3/8" PERFORATIONS SPACED AT 6" CENTERS, MIN. 4 HOLES PER ROW. MAX SPACING OF UNDERDRAIN PIPE IS 10 FEET ON CENTER. HDPE SHALL ADHERE TO AASHTO M252 SPECS. 8. UNDERDRAIN CLEANOUTS SHOULD EXTEND A MIN. OF 12" ABOVE TOP SURFACE OF MULCH OR GRASS LAYER. (1) CLEANOUT IN LOW SPOT SHALL BE FLUSH WITH TOP OF SURFACE TO ALLOW DRAWDOWN (MUST HAVE MARKER) 7. ONLY SMALL MATURING TREES ARE ALLOWED TO BE PLANTED IN THE AMENDED SOILS. BIORETENTIC"M AREA P LAN_ 0 20 40 60 GRAPHIC SCALE 1"=20' PAVEMENT OR OTHER STRUCTURAL 15" PONDING MAXIMUM COMPONENTS FOR ALL STORMS. SEE PLAN FOR ELEVATIONS. OPTIONAL 2"-3" STONE WITH FILTER FABRIC AROUND BOTTOM AND SIDES (RECOMMENDED ADJACENT TO PAVEMENT NTH OUT CURBS. 1' MIN WIDTH, 1' MIN DEPTH) OVERFLOW OUTLET COVERED WHEN MULCH LAYER IS NTH WIRE MESH OR HEAVY REQUIRED USE 3" PLAS11C RACK. SEE PLAN DOUBLE -SHREDDED FOR TYPE AND ELEVATIONS HARDWOOD MULCH MIN. 27. MAX SOD ON SIDE -SLOPES \& M M a. S7 r n Vol Y: � ZN� MEDIA 10' MiN. SURFACE AREA 4P MIN. IN, OUTLET PIPE .5% MIN SLOPE-' 4" DIAMETER PERFORATED UNDERDRAIN PIPE. PVC OR UNDERDRAIN GRAVEL BED HDPE (PER AASHTO M252). SECTION A -A (#57 WASHED STONE) WITH HEADER PIPE SHOULD BE 6" WT.S. 2" CHOCKING STONE ON TOP BOWL WIDTH ON THE BOTTOM W/PERMEABLE FILTER FABRIC SHOULD BE CLOSE TO THE ON SIDES AND BOTTOM (TYP.) WIDTH ON THE SURFACE BIORETENTION CROSS-SECTION (TYP.) 100- AFOR GENERAL BIORETENTION PLAN NOTES: OPERATION AND MAINTENANCE PROVISIONS: 1. BIORETENTION, PLAN CONTRIBUTES TO LEED S.S. CREDITS 6.1 STORMWATER DESIGN -QUANTITY CONTROL AND 6.2 STORMWATER DESIGN -QUALITY CONTROL. IMPORTANT OPERATION AND MAINTENANCE PROCEDURES: 2. BIORETENTION CELLS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NCDENR STORMWATER BMP MANUAL CHAPTER 12 AND THESE PLANS. ALL ITEMS TO BE 1. IMMEDIATELY AFTER THE BIORETENTION CELL IS ESTABLISHED, THE PLANTS USED IN CONSTRUCTION SHALL BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. WILL BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME 3. THE GEOMETRY OF THE CELL SHALL BE SUCH THAT NO DIMENSION IS LESS THAN 10 FEET (WIDTH, LENGTH OR RADIUS). ESTABLISHED (COMMONLY SIX WEEKS - NO MORE THAN 6 MONTHS). 4. CLEAN -OUT PIPES MUST BE PROVIDED NTH UNDERDIRAINS AND EXTEND A MINIMUM OF 12" ABOVE GRADE. CLEAN -OUT SHALL BE 4" MIN. SCH. 40 PVC NTH A 2. SNOW, MULCH OR ANY OTHER MATERIAL SHALL NEVER BE PILED ON THE SURFACE OF THE BIORETEN11ON CELL. SCREW OFF CAP. 5. PONDING DEPTH SHALL BE 12 INCHES OR LESS, SEE PLAN. 3. HEAVY EQUIPMENT SHALL NEVER BE DRIVEN OVER THE BIORETENTION CELL. 4. NO SEDIMENT SHALL ENTER THE BIORETENTION CELL DURING CONSTRUCTION. CONSTRUCTIQN 6. SEQUENQINQ: THE BIORETENTION CELL WILL TAKE THE PLACE OF THE ONSITE SEDIMENT BASIN AFTER ALL DISTURBED AREAS ARE COMPLETELY STABILIZED. SEDIMENT ACCUMULATION CAUSES CELL FAILURE AND MUST BE REMOVED. SEDIMENT FROM ENTERING THE SPECIAL CARE SHALL BE TAKEN TO PREVENT 7. THE DRAINAGE AREA TO THE CELL SHALL BE STABILIZED BEFORE CELL CONSTRUCTION BEGINS IN ORDER TO PREVENT CLOGGING. BIORETENTION CELL AFTER CONSTRUCTION. 8. FOR ROADWAYS DRAINING TO THE CELL, THE SUBBASE COURSE (CRUSHER RUN) AND THE BASE COURSE LAYER OF PAVEMENT NEED TO BE IN PLACE PRIOR TO 5. ONCE A YEAR, A SOIL TEST OF THE SOIL MEDIA SHOULD BE CONDUCTED. CELL CONSTRUCTION. 6. ANNUAL FLUSHING THROUGH PIPE CLEANOUTS IS RECOMMENDED TO 9. IF FINES GET WASHED INTO THE EXCAVATED CELL, THEY MUST BE REMOVED BEFORE BUILDING THE CELL IN ORDER TO RESTORE THE IN -SITU SOILS FACILITATE UNCLOGGING OF THE PIPES WITHOUT DISTURBING THE BIORETENTION AREA& PERMEABILITY. 10. PROTECT AND COVER THE CELL MEDIA NTH IMPERMEABLE PLASTIC DURING CONSTRUCTION. 7. AFTER THE BIORETENTION CELL IS ESTABLISHED, IT SHOULD BE INSPECTED ONCE A MONTH AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.0 INCHES. RECORDS OF OPERATION AND MAINTENANCE WILL BE SOIL 11. MEDIA: SOIL MIX TO BE UNIFORM AND FREE OF STONES, STUMPS, ROOTS OR OTHER SIMILAR MATERIAL GREATER THAN 2 INCHES. THE HOMOGENOUS SOIL MIX OF CT KEPT IN A KNOWN SET LOCATION AND WILL BE A VAILABLE UPON REQUESI. 85-88% WASHED SAND BY VOLUME (USDA SOIL TEXTURAL CLASSIFICATION), 8 TO 12 PERCENT FINES (SILT AND CLAY), AND 3 TO 5% ORGANIC MATTER (PEAT MOSS AND PINE BARK FINES) SHALL BE USED. 12. THE PHOSPHORUS INDEX (P-INDEX) FOR THE SOIL MUST BE LOW, BETWEEN 10 AND 30. THIS IS ENOUGH PHOSPHORUS TO SUPPORT PLANT GROWTH WITHOUT INSPECTION ACTIVITIES SHALL BE PERFORMED AS FOLLOWS. ANY PROBLEMS f%cj THAT ARE FOUND SHALL BE REPAIRED IMMEDIATELY. LAVUK"NU tmuz:arjumu,� MUM mr- 1- 13. SOIL MEDIA SHOULD BE SENT TO NC DEPARTMENT OF AGRICULTURE (NCDA) LABS TO BE ANALYZED. CONTRACTOR IS TO SUBMIT THE REPORT TO THE ENGINEER FOR APPROVAL. Operation and Maintenance Provisions for Bioretention Areas 14. SOIL MEDIA SHALL BE ANALYZED VERIFYING CONTENT. CHOCKING STONE AND UNDERDRAIN STONE SIEVE ANALYSIS WITH D15 AND D50 PARTICLE SIZES SHALL BE SUBMITTED TO THE ENGINEER FOR PRIOR APPROVAL. SOURCE AND SUPPLIER CONTACT INFORMATION SHALL BE PROVIDED TO ENGINEER PRIOR TO INSTALLATION. IBMP Element: Potential Problem: How to Remediate the Problem: 15. MEDIA PERMEABILITY OF 1-6 IN/HR IS REQUIRED, 1-2 IN/HR IS PREFERRED. PERMEABILITY RATE TO BE TESTED AND REPORT SUBMITTED TO ENGINEER FOR The entire BMP Trash/debris is present. Remove the trash/debris. APPROVAL. The perimeter of the �Ar as of bare soil and/or Regrade the soil if necessary to remove ELANT AREANTY NOTE bioretention cell erosive gullies have formed. the gully, then plant a ground cover and 16. THE PLANT AND MULCH INSTALLATION FOR BIORETENTION SHALL BE PERFORMED BY A PROFESSIONAL LANDSCAPE CONTRACTOR. water until it is established. Provide 17. THE CONTRACTOR SHALL MAINTAIN A ONE YEAR 100% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS, GRASS AND MULCH. lime and a one-time fertilizer application. 18. THE PERIOD OF CARE AND REPLACEMENT WARRANTY SHALL BEGIN AFTER FINAL INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the AND SHALL CONTINUE FOR ONE YEAR. stone verge or swale applicable). - sediment off -site. 19. PLANT REPLACEMENTS SHALL BE IN ACCORDANCE NTH THE MAINTENANCE SCHEDULE. The pipe is cracked or Replace the pipe. BIORETENTION PLANTING GUIDELINES: 1 ALL PLANT MATERIAL SHOULD CONFORM TO THE STANDARDS OF THE CURRENT EDITION OF AMERICAN STANDARD FOR NURSERY STOCK AS APPROVED BY THE . AMERICAN STANDARDS INSTITUTE, INC. ALL PLANT GRADES SHALL BE THOSE ESTABLISHED BY THE CURRENT EDITION OF AMERICAN STANDARDS FOR NURSERY STOCK. 2. ALL PLANT MATERIALS SHOULD HAVE NORMAL, WELL -DEVELOPED BRANCHES AND VIGOROUS ROOT SYSTEMS, AND BE FREE FROM PHYSICAL DEFECTS, PLANT DISEASES, AND INSECT PESTS. 3. ALL PLANT MATERIALS SHOULD BE TAGGED FOR IDENTIFICATION WHEN DELIVERED. 4. OPTIMUM PLANTING TIME IS FALL. WINTER PLANTING IS ACCEPTABLE (WILL VARY FOR WESTERN PIEDMONT AND MOUNTAINS OF NC). SPRING IS ACCEPTABLE BUT WILL REQUIRE MORE SUMMER WATERING THAN FALL PLANTING. SUMMER PLANTING IS THE LEAST DESIRABLE AS IT DRASTICALLY INCREASES PLANT MORTALITY The pretreatment area AND REQUIRES REGULAR WATERING IMMEDIATELY FOLLOWING INSTALLATION. 5. PLANT SIZE SHOULD BE NO LESS THAN 2.5"DBH FOR TREES; 3-GALLON FOR SHRUBS; AND 1-QUART FOR HERBACEOUS PLANTS. 6. WOODY VEGETATION SHOULD NOT BE PLANTED AT INFLOW LOCATIONS. 7. FOR BEST SURVIVAL, TREES SHOULD BE PLANTED WITH THE TOP OF THE ROOT BALL PARTIALLY OUT OF THE MEDIA. THEY SHOULD BE PLANTED TO HAVE FROM 1/3 TO 1/2 OF THE ROOT BALL WITHIN THE MEDIA. THIS WOULD LEAVE FROM 2/3 TO 1/2 OF THE ROOT BALL ABOVE THE MEDIA. MULCH 8. SHOULD BE: FREE OF WEED SEEDS, SOIL, ROOTS, AND OTHER MATERIAL THAT IS NOT BOLE OR BRANCHWOOD OR BARK. 9. COMMERCIALLY AVAILABLE DOUBLE OR MPLE-SHREDDED HARDWOOD MULCH SHALL BE USED, THIS MULCH HAS BEEN FOUND TO BE LESS LIKELY TO WASH AWAY THAN OTHER FORMS OF MULCH (SUCH AS PINE). 10. MULCH DEPTHS DEPEND ON THE TYPE OF MATERIAL USED AND THE DRAINAGE AND MOISTURE HOLDING -CAPACITY OF THE SOIL. A 2-4 INCH LAYER (AFTER THE SETTLING) IS ADEQUATE FOR MOST APPLICATIONS. EXCESSIVE APPLICATION OF MULCH CAN RESULT IN A SITUATION WHERE THE PLANTS ARE GROWING IN MULCH AND NOT THE SOIL. OVER -MULCHED PLANTS ARE EASILY DAMAGED DURING PERIODS OF DROUGHT STRESS. MULCHING IN AN AREA THAT IS POORLY -DRAINED CAN AGGRAVATE THE CONDITION. The bioretention cell: 11. MULCH CAN BE APPLIED ANY TIME OF YEAR, HOWEVER, THE BEST TIME TO MULCH IS LATE SPRING AFTER THE SOIL HAS WARMED. vegetation 12. AT LEAST 6 MONTHS OLD (12 MONTHS IS IDEAL). 13. UNIFORMLY PLACED ABOUT 3 INCHES DEEP. 14. RENEWED AS NEEDED TO MAINTAIN A 2-4"DEPTH; ON PREVIOUSLY MULCHED AREAS, APPLY A ONE -INCH LAYER OF NEW MATERIAL. ADDED 1-2 TIMES PER YEAR AND COMPLETELY REMOVED /REPLACED ONCE EVERY TWO YEARS. GEASS: 15. GRASS SHOULD NEVER BE SEEDED, USE SOD INSTEAD. WHEN USING SOD, AVOID SOD THAT IS GROWN IN SOIL THAT HAS AN IMPERMEABLE LAYER (SUCH AS CLAY). FESCUE/BLUEGRASS MIX IS RECOMMENDED FOR COLDER CLIMATES. BIORETENTION MAINTENANCE NOTES: BiORETENTION FACILITIES REQUIRE PLANT, SOIL, MULCH, AND UNDER -DRAIN MAINTENANCE TO ENSURE OPTIMAL INFILTRATION, STORAGE, AND POLLUTANT REMOVAL CAPABILITIES. BIORETENTION MAINTENANCE REQUIREMENTS ARE TYPICAL LANDSCAPE CARE PROCEDURES AND INCLUDE: 1. WATERING: PLANTS SHOULD BE SELECTED TO BE TOLERANT OF THE BIORETENTION FACILITY'S PARTICULAR CONDITIONS. WATERING SHOULD NOT BE REQUIRED AFTER ESTABLISHMENT (ABOUT 2 TO 3 YEARS). HOWEVER, WATERING MAY BE REQUIRED DURING PROLONGED DRY PERIODS AFTER PLANTS ARE ESTABLISHED. 2. EROSION CONTROL: INSPECT FLOW ENTRANCES, PONDING AREA, AND SURFACE OVERFLOW AREAS PERIODICALLY� REPLACE SOIL, PLANT MATERIAL, AND/OR MULCH IN AREAS The bioretention cell: WHERE EROSION HAS OCCURRED. EROSION PROBLEMS SHOULD NOT OCCUR WITH PROPER DESIGN EXCEPT DURING EXTREME WEATHER EVENTS. IF EROSION PROBLEMS 00 OcCUR, soilsandmulch THE FOLLOWING ISSUES SHOULD BE RE -ASSESSED: FLOW VOLUMES FROM THE CONTRIBUTING DRAINAGE AREA AND BIORETENTION SIZE; FLOW VELOCITIES AND GRADIENTS WITHIN THE BIORETENTION FACILITY; FLOW DISSIPATION AND EROSION PROTECTION METHODS IN THE PRETREATMENT ANDIN-FLOW AREAS. IF SEDIMENT IS DEPOSITED IN THE BIORETENTION FACILITY, IMMEDIATELY DETERMINE THE SOURCE, REMOVE EXCESS DEPOSITS, AND CORRECT THE PROBLEM. 3. PLANT MATERIAL: DEPENDING ON PLANTS SELECTED AND AESTHETIC REQUIREMENTS, OCCASIONAL PRUNING AND REMOVAL OF DEAD PLANT MATERIAL MAY BE NECESSARY. REPLACE ALL DEAD PLANTS. HOWEVER, IF SPECIFIC PLANTS CONSISTENTLY HAVE A HIGH MORTAU-TY RATE, ASSESS THE CAUSE AND REPLACE WITH APPROPRIATE SPECIES. PERIODIC WEEDING IS NECESSARY UNTIL GROUNDCOVER PLANTS ARE ESTABLISHED. WEEDING SHOULD BECOME LESS FREQUENT IF AN APPROPRIATE PLANT DENSITY HAS BEEN USED. 4. NUTRIENTS AND PESTICIDES: THE SOIL MEDIA AND PLANT MATERIAL SHOULD HAVE SLEN SELECTED FOR OPTIMUM FERTILITY, PLANT ESTABLISHMENT, AND GROWTH WITHIN THE PARTICULAR CONDITIONS OF EACH BIORETENTION FACILITY. NUTRIENT AND PESTICIDE INPUTS SHOULD NOT BE REQUIRED AND WILL DEGRADE THE POLLUTANT PROCESSING CAPABILITY OF THE 8IORETEN11ION FACILITY, AS WELL AS CONTRIBUTE TO ADDITIONAL POLLUTANT LOADING TO RECEIVING WATERS. BY DESIGN, BIORETENTION FACILILITIES ARE TYPICALLY SPECIFIED IN WATERSHEDS WHERE PHOSPHOROUS AND NITROGEN LEVELS ARE OFTEN ELEVATED. THEREFORE, THESE SHOULD NOT BE LIMITING NUTRIENTS WITH REGARD TO PLANT HEALTH. IF IN QUESTION, HAVE THE SOIL ANALYZED FOR FERTILITY. 5. MULCH: REPLACE MULCH ANNUALLY IN BIORETENTION FACILFFIES WHERE HEAVY METAL DEPOSITION IS LIKELY (E.G., DRAINAGE AREAS THAT INCLUDE COMMERCIAL/INDUSMAL USES, PARKING LOTS, OR ROADS). IN RESIDENTIAL OR OTHER SETTINGS WHERE METAL DEPOSITION IS NOT A CONCERN, REPLACE OR ADD MULCH AS NEEDED TO MAINTAIN A 2 TO 4 INCH DEPTH AT LEAST ONCE EVERY TWO YEARS. 6. SOIL MEDIA: SOIL MIXES FOR BIORETENTION FACILITIES ARE DESIGN TO MAINTAIN LONf� --T`11�4 FER'7#',WT f AND PC:_LUTANT PROCESSING CAPABILITY. ESTIMATES FROM METAL ATTENUATION RESEARCH INDICATES THAT METAL ACCUMULATION SHOULD NOT PRESENT A TOXICITY CONCERN FOR AT LEAST 20 YEARS IN BIORETENTION FACILITIES (USEPA -r It �A ff un E �x ul g go$ PONDIN MAXIMUM WQV & CPV 2'-4" FILTER MEDIA - HOMOGENOUS SOIL MIX FILL SOIL MEDIA MIX- 85-88% WASHED SAND 8-12% FINES (SILT + CLAY) 3-5% ORGANICS (PEAT MOSS, PINE BARK) P-INDEX FOR SOIL MEDIA SHOULD RANGE BETWEEN 10 AND 30 4" 'WASHED SAND 2" #8 OR #89 (CHOKING STONE) 8" (#57 WASHED STONE) GRAVEL LAYER AROUND UNDERDRAIN - CENTER UNDERDRAIN IN GRAVEL LAYER 2' PLUS DISTANCE TO SEASONAL HIGH WATER TABLE ELEVATION IN SITU SOIL IN -SITU SOIL - TmC TOMLIN LOAM HYDROLOGIC SOIL GROUP B - SOIL SURVEY CLOSEST SOIL BORING PUTS GROUND WATER BELOW 854' 410RETENTION MAINTENCE TASKS TASKS FREQUENCY MAINTENANCE NOTES PRUNING 1-2TIMES/YEAR NUTRIENTS IN RUNOFF OFTEN CAUSE BIORETETION VEGETATION TO FLOURISH MOWING 2-12 TIM ES/YEA R FREQUENCY DEPENDS UPON LOCATION AND DESIRED AESTHETIC APPEAL UNIFORMLY PLACED, DOUBLE ORTRIPPLE-SHREDDED HARDWOOD MULCHING 1-2TIMES/YEAR MULCH ABOUT 3" DEEP MULCH REMOVAL 1 TIME / 2-3 YEARS REMOVAL OF MULCH ALSO INCREASES SURFACE INFILTRATTION RATE OF FILL SOIL. 1 TIME / 2-3 DAYS FOR FIRST 1- WATERING 2 MONTHS. SPORADICALLY IF DROUGHTY, WATERING AFTER THE INMALYEAR MAY BE REQUIRED. AFTER ESTABLISHMENT FERTILIZATION 1 TIME INITIALLY ONE TIME SPOT FERTILIZATION FOR FIRSTYEAR VEGETATION REMOVER AND REPLACE WITHIN THE FIRSTYEAR, 10 PERCENTOF PLANTS k-1AY DIE, SURVIVAL RATES DEAD PLANTS ITIME/YEAR INCREASE WITH TIME. TASKS INCLUDE TRASH COLLECTION, SPOT WEEDING, AND REMOVING MULCH MISCELLANEOUS UPKEEP 12 TIMES / YEAR FROM OVERFLOW DEVICE. The underdrain syste (if app The drop inlet 3��� otherwise damaged (if applicable). Erosion is occurring in the lRegrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or ri prap to avoid future pro lems wit erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated Search for the source of the to a depth gre ate r than three sediment and remedy the problem inches. if possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or rip.rap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. Best professional practices Prune according to best professional show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. If sod was used, check to see that it was not grown on clay or impermeable soils. Replace sod if necessary. Tree stakes/wires are present Remove tree stake/wires (which months after planting. can kill the tree if not removed). -,six PAGW7 �s �reaking down or Spot mulch if there are only has floated away. random void areas. Replace whole mulch layer if necessary, Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Dete rm i ne the exte nt of the clogged with sediment. clogging - remove and replace eitherjust the top layers orthe entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search forthe source of the sediment and remedy the problem if possible. An annual soil test shows Dolomitic lime shall be applied as that pH has dropped or recommended per the soil test and heavy metals have toxic soils shall be removed, accumulated in the soil disposed of properly and replaced media. with new planting media. Clogging has occurred. Wash out the underdrain system. Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at - outlet. 733-1786. IT SHALL Hf- THE ccA,7RAcioR,5 1?EsPoNs,1q1ury TO CONTACT 7W CIOL LNOWEER TO NSU� 77M ALL PAR77f-S ARC /N PO Of - THE MOST Ctfiti��T SET OF CONSIRUCTION OOCUMENT-5, 8f-FORE CONSTRUCTION COMM