HomeMy WebLinkAbout018 C303.pdfWAV too 0
I
2-
WIN
Mill =011IRWAild
DIRECTIONS FOR MAINTENANCE CONSTRUQTIQN STEP 4: TEST THE SUBQ_RADE SOIL INFILIR_A I TI _SY31EMS QNLY) CON5IRQQ QN 5TEP 11: AS -BUILT INSPECTION
TLON ATE (INALTRA ON, D
1. IF THE SOIL TEST SHOWS AN INFILTRATION RATE(S) THAT ARE LOWER THAN THE RATE(S) USED IN THE ANAL DESIGN, 1. AFTER INSTALLATION, AN APPROPRIATELY LICENSED NC PROFESSIONAL MUST PERFORM A FINAL AS -BUILT INSPECTION
IT WILL BE CRUCIAL TO COMMUNICATE WITH CONSTRUCTION AND MAINTENANCE STAFF THEN THE DESIGNER MUST CHECK THE CALCULATIONS AND MAY NEED TO ADJUST THE DESIGN. AND CERTIFICATION THAT INCLUDES:
ABOUT THE LOCATIONS OF PERMEABLE PAVEMENT AND THE REQUIRED MANAGEMENT A. ENSURING THAT THE INSTALLATION REMAINS IN GOOD CONDITION AND THE SURFACE IS FREE OF FINES.
PRACTICES FOR KEEPING PAVEMENT UNCLOGGED. CONTRACTOR AND MAINTENANCE
STAFF MUST. CONS RUCTION STEP 5: PLACE GEOTEXTILES ANQ QEOMEMBRANE (IF,,-APPLICABLU B. CHECKING THAT ALL PERVIOUS SURFACES ARE DRAINING AWAY FROM THE PAVEMENT AND THAT THE OVERALL SITE IS
1. FREQUENTLY HAND -BLOW THE SURFACE OF THE PERMEABLE PAVEMENT, ESPECIALLY STABILIZED.
DURING THE FALL AND SPRING TO REMOVE LEAVES AND POLLEN BEFORE THEY 1. IF USING GEOTEXTILES OR GEOMEMBRANES, THEN FOLLOW THE MANUFACTURER'S RECOMMENDATIONS SO FOR THE C. VERIFYING THAT THE PAVEMENT WAS INSTALLED PER THE DESIGN.
CAUSE IRREVERSIBLE DAMAGE TO THE PAVEMENT'S PERMEABILITY. APPROPRIATE OVERLAP BETWEEN ROLLS OF MATERIAL. D. PREPARING THE AS -BUILT PLANS THAT INCLUD':' ANY CHANGES THE UNDERDRAINS, OBSERVATION WELL LOCATIONS,
l-
2. DO NOT STOCKPILE SOIL, SAND, MULCH OR OTHER MATERIALS ON THE PERMEABLE 2. SECURE GEOTEX11LE OR GEOMEMBRANE SO THAT IT WILL NOT MOVE OR WRINKLE AS AGGREGATE IS PLACED. TERRACE LAYOUTS, AGGREGATE DEPTH OR STORAGE STRUCTURES, ANY REMSED CALCULATIONS, ETC.
PAVEMENT. F. TESTING THE PERMEABILITY OF THE PAVEMENT SURFACE USING THE NCSU SHALLOW HEAD INFILTRATION TEST (SEE
3. LAY DOWN TARPS TO MINIMIZE SPILLAGE ONTO THE PERMEABLE PAVEMENT WHENEVER CQNSTRUCTION STEP I CH BASINS, OD _ERVATIQN WELL(S) AND UNDERDRAIN SYSTEM MAINTENANCE SECTION 18.5.5) OR OTHER APPROPRIATE TEST SUCH AS ASTM C1701 STANDARD TEST METHOD FOR
SOIL, SAND, MULCH OR OTHER MATERIALS WILL BE TRANSPORTED OVER PAVEMENT. -.2LAM Q��! INFILTRATION RATE OF IN -PLACE PERVIOUS CONCRETE.
PLACE THE CATCH BASINS AND OBSERVATION WELLS ACCORDING TO THE DESIGN PLANS AND VERIFY THAT THE ELEVATIONS
4. COVER STOCKPILES NEAR THE PERMEABLE PAVEMENT. ARE CORRECT. IF AN UPTURNED ELBOW DESIGN IS BEING USED, THEN THE UNDERDRAINS WILL BE PLACED FIRST. VERIFY 2. ANY DEFICIENCIES FOUND DURING THE AS -BUILT INSPECTION SHALL BE PROMPTLY ADDRESSED.
5. BAG CRASS CLIPPINGS OR DIRECT THEM AWAY FROM THE PERMEABLE PAVEMENT. KEY POINTS OF THE DESIGN, SUCH AS: -
6. NOT BLOW MATERIALS ONTO THE PERMEABLE PAVEMENT FROM ADJACENT AREAS. 1. ELEVATIONS OF THE UNDERDRAINS AND UPTURNED ELBOWS ARE CORRECT. CURB CUT/ DISCHARGE WIER FOR 18" VERTICAL CURB
7. NOT APPLY SAND DURING WINTER STORMS. 2. DEAD ENDS OF PIPE UNDERDRAINS ARE CLOSED WITH A SUITABLE CAP PLACED OVER THE END AND HELD FfRMLY IN FLUME, SEE PLAN FOR LOCATION. EMBEDDED RING
8. IMMEDIATELY REMOVE ANY MATERIAL THAT IS DEPOSITED ONTO THE PERMEABLE PLACE. INFILTROMETER KIT
PAVEMENT DURING CONSTRUCTION OR MAINTENANCE ACTIVITIES. REMOVE LARGE 3. PORTIONS OF THE UNDERDRAIN SYSTEM WITHIN ONE FOOT OF THE OUTLET STRUCTURE ARE SOLID AND NOT PERFORATED. RECESSED LANDSCAPE (ERIK)
MATERIALS BY HAND. REMOVE SMALLER ORGANIC MATERIAL VIA HAND BLOWING. AREA AT FLUME (TYP.)
12" MIN.
OPERATION AND MAINTENANCE
INSPECTING OBSERVATION WELLS
/x,
X
AFTER PERMEABLE PAVEMENT IS CONSTRUCTED, IT MUST BE INSPECTED ONCE A
24 HOURS AFTER EVERY STORM EVENT EXCEEDING 1.0 INCH OF 'X" i8% VOIDS MIN._'.
x\\�
QUARTER AND WITHIN
RAINFALL. ANY DEFICIENT BMP ELEMENTS NOTED IN THE INSPECTION MUST BE THE OBSERVATION WELL ALLOWS THE OWNER TO DETERMINE HOW WELL THE AGGREGATE BASE AND UNDERDRAINS PAVEMENT
X
AN AFFECT ARE FUNCTIONING. T
CORRECTED, REPAIRED OR REPLACED IMMEDIATELY. THESE DEFICIENCIES C FOLLOW IHESE STEPS TO INSPECT THE OBSERVATION WELLS: COURSE
x",
THE INTEGRITY OF THE STRUCTURE, THE SAFETY OF THE PUBLIC AND THE x
1 . WAIT UNTIL FIVE DAYS AFTER A RAINFALL EXCEEDING 1.0 INCH (OR 1.5 INCHES IF lN A COASTAL COUNTY). IF
EFFECTIVENESS OF THE PERMEABLE PAVEMENT. NO ADDITIONAL RAIN OCCURS IN THE FIVE DAYS, OPEN EACH OBSERVATION WELL. 25% VOIDS
IMPORTANT MAINTENANCE PROCEDURES IN ADDITION TO THE TABLE BELOW: -'--,,STONE
2. VISUALLY ASSESS WHETHER WATER IS PRESENT, OR IF VISUAL ASSESSMENT ISN'T POSSIBLE, USE A WEIGHTED RESERVOIR
PARENT
1 . THE PAVEMENT MUST BE KEPT FREE OF DEBRIS AND PARTICULATE MATTER AT ALL STRING OR OTHER WATER -LEVEL MEASUREMENT METHOD.
SOIL
TIMES THROUGH FREQUENT BLOWING, PARTICULARLY DURING THE FALL AND SPRING. 3. IF WATER IS PRESENT, THE SUBSURFACE IS CLOGGED OR UNDERDRAINS ARE NOT FUNCTIONING. NOTE THE j
2. PARTICULATES SUCH AS SOIL, SAND AND MULCH SHALL NOT BE PILED ON THE LOCATIONS OF THE OBSERVATION WELLS WITH WATER PRESENT. 4 OZ MIN. NON -WOVEN FILTER FABRIC -1
PAVEMENT. 4. THE OWNER (OR SITE MANAGER) SHOULD CONSULT THE DESIGNER OR OTHER APPROPRIATE PROFESSIONAL. SUBGRADE
3. ONCE A YEAR, PERFORM A SIMPLE INFILTRATION TEST (EXPLAINED IN SEC11ON 18.6.4
AND 18.6.5) ON THE SURFACE OF THE PAVEMENT. SEE "TYPICAI. SECTION -PERVIOUS CONCRETE PAVING" FOR DESIGN DEPTHS
4. SWEEP THE PAVEMENT WITH A VACUUM OR REGENERATIVE AIR SWEEPER WHENEVER
THE SIMPLE INFILTRATION TEST INDICATES POOR INFILTRATION RATES. PERVIOUS CONCRETE WiVERTiCAL CURB (TYR)
5. SNOW AND ICE MUST BE REMOVED BY PLOWING, NOT SAND, SALT OR CHEMICAL N,T.S.
DEICERS. SET THE BLADE ON THE PLOW ONE INCH HIGHER THAN USUAL. SNOW CAP FLUSH OR RELOW TOP OF PAVEMENT. r-STANDAP0 V-6"
SHALL NOT BE PILED ON THE PAVEMENT SURFACE. I I CURB ANP 137UITER
BMP Element:
Potential Problem:
How to Remediate the Problem:
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to remove
permeable pavement
erosive gullies have formed.
the gully, then plant a ground cover and
water until it is established.-, -
A vegetated area drains
Regrade the area so that it drains away
toward the pavement.
from the pavement, then plan aground
cover and water until it is established.
The surface of the permeable
Trash/debris is present.
Remove the trash/debris.
pavement
Weeds are growing on the
Do not pull the weeds (may pull out
surface of the permeable
media as well). Spray them with a
pavement.
systemic herbicide such as glyphosate
and then return within the week to pull
them by hand. (Another option is to
pour boiling water on them or steam
them.)
Sediment is present on the
Vacuum sweep the pavement.
surface.
The structure is deteriorating
Consult an appropriate professional.
or damaged.
The pavement is rutting,
Consult an appropriate professional.
cracking or slumping.
Observation Well
Water is present more than
Clean out clogged underdrain pipes.
five days after a storm event.
Consult an apropriate professional for
clogged soil subgrade.
Educational Sign
The educational sign is
Replace the sign.
missiniz or has been damaged.
I PERVIOUS
kPAVEMENT
PERVIOUS CONCRETE PAVEMENT
I V I., . . 01>' '. 6 1 -1
PERVIOUS PAVEMENT
t-11 MIN Z3UNtVV UM I-LA14Ur- I Trr- III.,VVIC-M.
X\VTEMPORARY PERIMETER RING
(REMOVABLE)
PVC COUPLING �SCH 40)
TEMPORARY PERIMETER RING
(REMOVABLE)
moffilm
1 1 12" M I N.
18% VOIDS WN.
, _,,�25% VOIDS
121'
PERVIOUS
CONCRETE
00 F
III of
WATER DRAINS TO SOIL
SAND`Nc�, �h�sr-Ao - ING,
NOTES:
1. SIGN SHALL BE 0.080 GAUGE ALUMINUM.
3/8-
(WHITE
PANTONE 359 FOR GREEN BACKGROUND
.25"
LETTEN
AND PANTONE 300 FOR BLUE ARROWS.
.4"
LETTERS
2. THIS SIGN SHALL BE POS I W AT
LETTERS
PRE -DETERMINED LOCATIONS PER THE
.8"
APPROVED SITE PLAN.
.5"
LETTERS
3. SIGN TO BE MOUNTED ON POST WITH
5/16- S.S. NUTS AND BOLTS.
.4"
LETTERS
PLACE ONE SIGN (MIN.) AT EACH PERVIOUS
CONCRETE PAVED PARKING AREA. EIGHT (8)
AREAS THIS PROJECT.
H=11
USE 5/16" S.S. BOLTS ' LOCK WASHER &
NUTS TO FASTEN 1/8" THICK HOT DIPPED
GALVANIZED STEEL STABILIZER PLATE
8*-051 X 21;
HOT DIPPED GALV.
SQUARE -CHANNEL POST
TOP MEW
10"
0111I.-
0
0
FOR SIGN POST ANCHORING SEE
DETAIL RIGHT (OTHER ANCHORING
DETAI PERM D
APPROVAL BY CITY ENGINEERING)
FRONT VIEW
TYPICAL PERVIOUS CONCRETE PAVEMENT SIGN
N�T�&
z-- CONCRETE PAVEMENT
4
4
1z �vy,
N.T.S.
PERVIOUS CONCRETE PAVEMENT
-= D - 6p*
4
4 4
A4 4 4
10" MIN.
I 1EE 11 716
Ds 360#
CLEAN DOUBLE WASHED #57 COARSE AGGREGATESUBBASE, STONE
RESERVOIR (2% OR LESS PASSING ASTM NO. 200 SIEVE). WHEN
DEPTH EXCEEDS 10" DUE TO SLOPE REQUIREMENTS, THE BOTTOM 6"
SUBBASE SHAIJ - BECOME #30R#4 WASHED COARSE AGGREGATE
SCARIFIED, RIPPED, OR TRENCHED SUBGRADE
(IN -SITU SOIL MIN. 0.5"/HOUR PERMEABILITY W/ 0% SLOPE - 0.5% SLOPE MAX.)
(IMPORTED SOIL. MIN� 0.5" /HOUR PERMEABILJTY W/ 0% SLOPE - 0.5% SLOPE MAX.)
TYPICAL SECTION - PERVIOUS CONCRETE PAVING
N,T,S.
/-CONVENTIONAL CONCRETE
TURN DOWN SIDEWALK/CURB
12" MIN.
D
4
7
Vol MIN.:�
PAVEMENT
AI
COURSE
>
X
2
X
25% VOIDS
C TC)KIF
//1, z,
CURB CUT " DISCHARGE WIER FOR-,/
X PAR
RESERVOIR
SEE PLAN FOR LOCATION. kx _7
-PERMANENT PERIMETER RING FLUME. ENT _j
SOIL
24" MIN.-- 12
PARENT
- 6" PV%rd' COUPLING (SCH 40) SOIL 4 OZ MIN. NON --WOVEN FILTER FABRIC
6" PERFORATED PVC PIPE (SCH 40) 4 OZ MIN. NON -WOVEN FILTER FAS P! C SUBGR DE
SUBGRADE S E E "TYPICAL SECTION -PERVIOUS CONCRETE PAVING" FOR DESIGN DEPTHS
C-M-P "TYPirAt l,PrT1r)N_PPP\/1r)"Cz rnmrpr-Tr- PAvimnll P-rip nrl-,inNii nirPTNq PF=PVlnHq rnNjr.PF=TF= \A/! THRKj nnvA/NqnFVVAl K/rHRR (C)PTION�
� I � I I I � 4" MIN. EMBEDMENT
PARENT EARTH I I
t I'Lu U kz!
1-j -11-L, IT-,-il PERVIOUS CONCRETE W1 V-6" CURB & ""UTTER
EMBEDDED RING INFILTROMETER KIT (ERIK) N-T,S, PERMEA-BLE- - 1 CONCRETE PAVEMENT (PICP) I PAVERS -
TOOLED W/ 1/8- RADIUS RIBON CURB - AQUA-BRIC 3 1/4" MIN. THICKNESS NTERLOCKING
N.T.S, CONVENTIONAL CONCRETE EXTEND TO FROST DEPTH MIN. -WASHED #78 STONE FOR 1. PAVERS SHALL SHALL BE AQUA-BRIC TYPE 4 PAVERS
LOPE JOINT FILL PLA'C'ED IN AN INTERLOCKING HERRINGBONE PATTERN.
2. PAVERS SHALL BE NOMINAL 5"X10"X3j"
3. SHALL BE MANUFACTURED IN ACCORDANCE NTH ASTM
77
COMPACTED SOIL- TIONS
2" MIN. WASHED #78
D C936 SPECIFICA
-�18% VOIDS MIN.'�`!*
4
PERMEABLE AT PERIMETER AGGREGATE CHOKING/HE 4. INSTALL PAVERS PER MANUFACTURERS REQUIREMENTS AND
DDING
4 TIONS.
4 PAVEMENT 12" MIN. SPECIFICA
V MIN' STONE
r-p
(O.V_)D COURSE 12" MIN.- 5. TEST Rr_ ORTS FOR SUBGRADE SHALL BE PROVIDED TO THE
TION. ASTM
OR 2" MIN. 4" CLEAN DOUBLE WASHED #57 ENGINEER FOR APPROVAL PRIOR TO INSTALLA
VOIDS-
D2487, D3385
STONE
\xX,x �\\'/XXXII COARSE AGGREGATE COMPACTED
BASE - STONE RESERVOIR 6. INSTALLERS SHALL BE CERTIFIED BY INTERLOCKING
CONCRETE PAVING INSTITUTE WITH PICR CONSTRUCTION,
RESERVOIR
6" CLEAN DOUBLE WASHED #3
_Y MIN�-� INSPEC ION AND DETAILING EXPERIENCE.
PARENT PARENT SOIL
OR #4 COARSE AGGREGATE
SOIL COMPACTED SUBBASE - STONE
12" MIN.
SUBGRADE SCARIFIED, RIPPED, OR TRENCHED SUBGRADE RESERVOIR
''Tfi iT SHALL BE THE CONTRACTOR's RESPON,5181�117_y
3' MIN IMPERMEABLE GEOMEMBRANE BARRIER (MIN.O.5"/HOUR PERMEABILITY W1 0% SLOPE
0.5% SLOPE MAX. FOR IN -SITU OR 4 OZ MIN. NON -WOVEN FILTER FABRIC MEMBRANE TO CONLACT 7HE CIWL ENGIAIL-1--R TO 11V50?E 771A,
ALL PAI?TIE-5 Al?f- 11V POSSE57SION Of- THE MOST
SEE "TYPICAL SECTION -PERVIOUS CONCRETE PAVING" FOR DESIGN DEPTHS IMPROVED SOIL CONDTIONS) CLIRRENT SET 0/-- CONSTRUCTION d0CU1v1f_N7_,5,
CONVENTIONAL CONCRETE PAVEMENT MATCH WITH PERMEABLE SECTION TYPICAL SECTION - AQUA-BIRC PERMEABLE PAVERS (PICP) REFORE CONS7RUCTION C,00W�51VC'ES.
17.11N.
4-1
10 F&
4-1
0
0
C\j
W
C\j
0
C\j
E
+
W
Ui
0
0
F"a
z
W
Ld
=1
W
W
Cr
>
U)
W
co
'1�1-
00
-t
C)
cy)
U)
[:
00
r.;
CF)
%J)
1:
0
I-_
c))
N
0
T-
o
<
f
cy)
�,t
cy)
't
'r-
0
F-
LL
SE
024911
CONSULTING ENGINEER
4f24 WANDERING LN. N.E.
WeKORY, NC 28601
PHONE (828) 320-3367
LM
(D
VIM#
Ar mr-M
00
U-I
co
C
4) 0
cc
c
cc >
0
AM ANI
C*4
PROjECT PHASE:
Permit Drawings
PROJECTM DATE:
1% ft
R==��==�2012.121107