i General Project Notes
1, Contractor shall become fully acquainted with the conditions of the contract, local
conditions relating to location, accessibility and general character of the construction
site and local labor conditions so that the contractor understands the nature, extent,
and any difficulties and restrictions related to the execution of the work.
2. Conti -actor shall perform work in accordance with applicable federal, state and
local governing ordinances, codes and regulations.
3. Contractor shall ensure ft-,lat all materials are in compliance with the plans and
specifications.
4. Where a detail is shown for one condition, it shall apply for all like or similar
conditions even though not specifically marked on the contract documents.
5. Interior dimensions for drywall partitions shown on floor plans are from face of
stud to face of stud or to center line of column.
6. interior dimensions for CIVIL) walls shown on floor plans are from face of CIVIL) to
face of CMU or to center line of column.
7. Contractor to coordinate location of and provide access panels as required for
mechanical and electrical systems,
8. All work shown on the architectural section of these contract documents shall be
coordinated with all other trades.
9. This drawing set copyright @2012 by Daggett + Grigg Architects, PC, The
Architect retains all common law, statutory and other reserved rights, in addition to
the copyright on this drawing. Unauthorized reproduction or use of this drawing is
prohibited, including derivative works.
10. DO NOT SCALE DRAWINGS, The Contractor shall take field measurements
and verify field conditions and shall carefully compare such field measurements and
conditions and other information known, to the Contractor with the Contract
Documents before commencing activities; Contractor shall carefully study and
compare the Contract Documents with each other and with information furnished by,
the Owner and shall at once report to the Architect errors, inconsistencies or
omissions discovered. If the Contractor performs any construction activity knowing it
involves a recognized error, inconsistency or omission in the Contract Documents
without such notice to the Architect, the Contractor shall assume appropriate
responsibility for such performance and shall bear an appropriate amount of the
;3ftflbutable cost,
11. The intent ol the Contract Documents is to include all items necessary for the
proper execution and completion of the Work by the Contractor. The Contract
Documents are complementary, and what is required by one shall be as binding as
if required by all; performance by the-Contiactor shall be required only to the extent
consistent with the Contract Documents and reasonably inferable from them as
being necessary to produce the intended results. In case of conflicting requirements,
the more stringent requirements shall apply, without change to Contract Sum or
Time.
12. Organization of the Specifications into divisions, sections and articles, and
arrangement of Drawings shall not control the Contractor in dividing the Work
among Subcontractors or in establishing the extent of Work to be performed by any
trade.
13. All fire-resistant construction shall be constructed in accordance with applicable
UL designs or, where no design is indicated, in accordance with applicable
provisions of the NC13C, including openings, penetrations and supports.
0
'1 10 Stat"or: v
o%
o
En
�
A10
IT E
2,
�t
,,4fe
iXV't'--
�M=1n- A
Catawba County, North Caroiina
Purchasing Division
PO Box 389
Newton., NC
V - 828.465.8227
F - 828.465.8477
www.catawbacountync.gov
Arch itectural
Daggett + Grigg Architects
100 10th Street NE Suite 200
Charlottesville, VA 22902
V - 434.989.51197
F - 434.296-3040
www.daggettgrigg.com
2rw Consultants, Inc.
100 10th Street NE Suite 202
Charlottesville, VA 22902
V - 434.296.2"1 16
F - 434.977.1862
www.2rw.com
Civil Engineering
10
Harold J. Marvin, P.E.
4 .124 Wandering Ln. NE
Hickory, NC 28601
V - 828.320.3367
2012 North Carolina Building Code (NCBC)
2012 International Building Code (IBC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC)
2009 National Electrical Code (NEC)
2012 NFPA 1, Uniform Fire Code
2012 International Energy Conservation Code (JECC)
Sheet List
Sheet
Number
I Sheet Name
T'l 0 1
FT'itleSheet.
T102
Life Safety Plan
T103
Life Safety Site Plan / Appendix B
[I C1 01
Erosion & Sedime nt Control Flan
C102
Erosion & Sediment Control Details - I
C103
Erosion & Sediment Control Details - 2
C201
Site Plan
C202
Site Details - 1
0203
Site Details - 2
C301
Paving Plan
C302
Paving Details - 1
C401
Grading & Storm Drainage Plan
C402
Storm Drainage Details
C403
Biolretention Plan
L101
Landscape Plan
L102
Landscape Plan Details
A001
I Foundation Plan
A! 00
-Slab / in I g I Plan
lFloor
A101
Plan
- --
A1(}1, a-
Enlarged Floor Plans
-- A,101.b
ared Floor Plns
_E ga
I , - ,
"
A101.c
Eri ar g ed F loor'Pians
Al 02
1 Reflected Gelling Plan
A103
Framing Plan
A104
Roof Plan
A201
Building Elevations
A301
166ilding,,-Section s
A401
*all Sections + Details
A402
Well Sections + Details
A40-- -3
W-all-Sections+ Details
A404
Wall Sections + Details
A405
Wall Sections + Details
A406
'Typical Framing Details
A407
Typical GMU Details
A501
i Interior Elevations
A601
Door Schedule + Types
A602
Wind-o-w Sckedule''-i-b-o-or & W I i I In , d o I w Details
'11' 1,6701
Onterior Finishes
A— 80 1 JSid Alternates
2X \1
(12.13)
M-
Sheet
1
Number
Sheet Name
M10100
11, Legends', Schedules,, Details
M001
iAirflow Schematics, Details
M002
1 Details
M003
Details, Site Plan
M100
Mechanical - Ductwork
J
M101
Mechanical - Piping
M200
1 Controls
M201
Controls
POOO
lagend, Schedules, Details
P100
�Floor Plan - Waste& Vent
P101
1 Floor Plan - Water/Gas Supply
EOOO
I Legend, Schedules, Details
E001
Site Plan
E002
Panel Schedules...
E101
Floor Plan - Lighting
E102
IF loor Plan -Power
E103
Roof Plan - Lighting & Power
F
0
0
0
C\j
W
C\1
0
E
U5
0
Z
W
0
Cn
W
>
CO
Mt
4-0
(D
W
00
co
ICY)
01
C))
0
0
C,Z
<
(Y)
Cl)
U-
C—
le ^
W 10 1
CZ
ski
(D
C) ca
=3
0 U5
10 co
CO E
ja
<
CD
war
ca
CZ
(5 C)
co
00 4%
PROJECT PHASE:
Permit Drawins
'POPQT #: DATE:
2012,
SHEOBEk-'sit