Loading...
HomeMy WebLinkAbout007 T101.pdfr 4 i General Project Notes 1, Contractor shall become fully acquainted with the conditions of the contract, local conditions relating to location, accessibility and general character of the construction site and local labor conditions so that the contractor understands the nature, extent, and any difficulties and restrictions related to the execution of the work. 2. Conti -actor shall perform work in accordance with applicable federal, state and local governing ordinances, codes and regulations. 3. Contractor shall ensure ft-,lat all materials are in compliance with the plans and specifications. 4. Where a detail is shown for one condition, it shall apply for all like or similar conditions even though not specifically marked on the contract documents. 5. Interior dimensions for drywall partitions shown on floor plans are from face of stud to face of stud or to center line of column. 6. interior dimensions for CIVIL) walls shown on floor plans are from face of CIVIL) to face of CMU or to center line of column. 7. Contractor to coordinate location of and provide access panels as required for mechanical and electrical systems, 8. All work shown on the architectural section of these contract documents shall be coordinated with all other trades. 9. This drawing set copyright @2012 by Daggett + Grigg Architects, PC, The Architect retains all common law, statutory and other reserved rights, in addition to the copyright on this drawing. Unauthorized reproduction or use of this drawing is prohibited, including derivative works. 10. DO NOT SCALE DRAWINGS, The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known, to the Contractor with the Contract Documents before commencing activities; Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by, the Owner and shall at once report to the Architect errors, inconsistencies or omissions discovered. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Architect, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the ;3ftflbutable cost, 11. The intent ol the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the-Contiactor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results. In case of conflicting requirements, the more stringent requirements shall apply, without change to Contract Sum or Time. 12. Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. 13. All fire-resistant construction shall be constructed in accordance with applicable UL designs or, where no design is indicated, in accordance with applicable provisions of the NC13C, including openings, penetrations and supports. 0 '1 10 Stat"or: v o% o En � A10 IT E 2, �t ,,4fe iXV't'-- �M=1n- A Catawba County, North Caroiina Purchasing Division PO Box 389 Newton., NC V - 828.465.8227 F - 828.465.8477 www.catawbacountync.gov Arch itectural Daggett + Grigg Architects 100 10th Street NE Suite 200 Charlottesville, VA 22902 V - 434.989.51197 F - 434.296-3040 www.daggettgrigg.com 2rw Consultants, Inc. 100 10th Street NE Suite 202 Charlottesville, VA 22902 V - 434.296.2"1 16 F - 434.977.1862 www.2rw.com Civil Engineering 10 Harold J. Marvin, P.E. 4 .124 Wandering Ln. NE Hickory, NC 28601 V - 828.320.3367 2012 North Carolina Building Code (NCBC) 2012 International Building Code (IBC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) 2009 National Electrical Code (NEC) 2012 NFPA 1, Uniform Fire Code 2012 International Energy Conservation Code (JECC) Sheet List Sheet Number I Sheet Name T'l 0 1 FT'itleSheet. T102 Life Safety Plan T103 Life Safety Site Plan / Appendix B [I C1 01 Erosion & Sedime nt Control Flan C102 Erosion & Sediment Control Details - I C103 Erosion & Sediment Control Details - 2 C201 Site Plan C202 Site Details - 1 0203 Site Details - 2 C301 Paving Plan C302 Paving Details - 1 C401 Grading & Storm Drainage Plan C402 Storm Drainage Details C403 Biolretention Plan L101 Landscape Plan L102 Landscape Plan Details A001 I Foundation Plan A! 00 -Slab / in I g I Plan lFloor A101 Plan - -- A1(}1, a- Enlarged Floor Plans -- A,101.b ared Floor Plns _E ga I , - , " A101.c Eri ar g ed F loor'Pians Al 02 1 Reflected Gelling Plan A103 Framing Plan A104 Roof Plan A201 Building Elevations A301 166ilding,,-Section s A401 *all Sections + Details A402 Well Sections + Details A40-- -3 W-all-Sections­+­ Details A404 Wall Sections + Details A405 Wall Sections + Details A406 'Typical Framing Details A407 Typical GMU Details A501 i Interior Elevations A601 Door Schedule + Types A602 Wind-o-w Sckedule''-i-b-o-or & W I i I In , d o I w Details '11' 1,6701 Onterior Finishes A— 80 1 JSid Alternates 2X \1 (12.13) M- Sheet 1 Number Sheet Name M10100 11, Legends', Schedules,, Details M001 iAirflow Schematics, Details M002 1 Details M003 Details, Site Plan M100 Mechanical - Ductwork J­­ M101 Mechanical - Piping M200 1 Controls M201 Controls POOO lagend, Schedules, Details P100 �Floor Plan - Waste& Vent P101 1 Floor Plan - Water/Gas Supply EOOO I Legend, Schedules, Details E001 Site Plan E002 Panel Schedules... E101 Floor Plan - Lighting E102 IF loor Plan -Power E103 Roof Plan - Lighting & Power F 0 0 0 C\j W C\1 0 E U5 0 Z W 0 Cn W > CO Mt 4-0 (D W 00 co ICY) 01 C)) 0 0 C,Z < (Y) Cl) U- C— le ^ W 10 1 CZ ski (D C) ca =3 0 U5 10 co CO E ja < CD war ca CZ (5 C) co 00 4% PROJECT PHASE: Permit Drawins 'POPQT #: DATE: 2012, SHEOBEk-'sit