SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 IN VIOLATION IN COMPLIANCE Yes Project
Corinth Reformed Church -Additon Project Number Case-11-11-3204 Person Financially Responsible Corinth Evangelical & Reformed Church Address 150 16th Ave NW, Hickory, NC 28601 1. Project
Location 150 16th Ave NW, Hickory, NC 28601 Pictures: Prints Slides Digital Video 2. Weather and Soil Conditions cool, muddy 3. Is site currently under notice of violation? Yes No If
no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow
approved plan 31-5 (f) h. Graded slopes and fills too steep 31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate
groundcover 31-5 (d) j. Failure to maintain erosion control measures 31-13 e. Insufficient measures measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6
(j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe): 6. Phase of Grading a. rough grading complete b. final grading complete Description: 7. Potential NPDES Permit
violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract
Other property Road/walkway Description: Degree of damage: Slight Moderate Severe 9. Contact made with (name)Randy Title Project Manager Inspection report in case file due to no activity
given or sent to Person Financially Responsible. Date given/sent: 10. Corrective actions needed: Submit an adequate sedimentation and erosion control plan for approval, covering all
areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation and erosion control measures
as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated diversions as shown on the
approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract: Install adequate drop inlet
protection as shown on the approved plan, including but not limited to the following locations: Provide adequate temporary or permanent ground cover on all graded slopes where rough
or fine grading has been completed for 21 calendar days, including the following areas: Provide adequate permanent ground cover on all areas where development has been completed for
15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters): Maintain all sedimentation and erosion control measures
as specified in the approved plan and as required to prevent sedimentation damage including the following locations: 11. Comments: I spoke with Randy and told him the slopes around the
basin in the rear needed to be stabilized. I also asked if the area behind the walls was to grade. He said he would get Neill Grading to finish bringing it to grade so that area can
be stabilized too. As soon as the area dries out enough he will schedule the conc. people to pour the curbs and then the parking lot can be finished in front. No activity since last
inspection: Report by: Kim Sue Others present:
Date of inspection: 2-21-12 Time arriving at site: Time leaving site: cc: , ,