Loading...
HomeMy WebLinkAboutELEC-9-11-21256 Contractor Change.tif -7 � Ccn-�r S+ 4-b c KN N c �L 8�o o �� a e e + Ch er s td @ aC a faiAJbcr CO "* N C . 9 ° ✓ - 5 c0i 1l/�vLJ CEw7 C 4� �- ; s Carat /d /.rr $ C' CATAWBA COUNTY PERMIT ! ELECTRICAL (C) Alteration P. O. Box 389 Phone: 828 -465 -8399 PERMIT NO: ELEC -9 -11 -21256 100A Southwest Blvd Newton FAX: 828 -465 -8962 APPLIED: 09/06 /2011 18 L� 4 SM Newton, North Carolina 28658 Hickory FAX: 828 - 322 -6814 ISSUED: 09/06 /2011 EXPIRES: 03/04/2012 xmw.catawbacountync.gov Catawba County Internet Citizen Access Portal: energov.catawbacountyna.gov /cap/ /L,, Pe4u+ APPLICANT OWNER CONTRACTOR Z 2J 2 OUTBACK STEAKHOUSE SOUTHEAST COMMERICAL Grace Electric Inc of GA 143513TH AV DR SE 2202 N WEST SHORE BLVD 657 Red Oak RD HICKORY NC 28602 TAMPA FL 33607 Stockbridge GA 30251 - P. (678)289 -9429 's I PROPERTY iD #: 371218410954 STREET ADDRESS: 1435 13TH AV DR SE, Hickory, NC LOT# B PROJECT DESCRIPTION: Change out existing light fixtures DIRECTIONS: 13TH AV DR SE ACROSS FROM HOLIDAY INN COMMENTS: WORK CLASS: Alteration TOTAL SQ FT TYPE OF USE: Business FEE DESCRIPTION DATE FEE AMOUNT Tenant Spa Electrical Wiring Fee 09/06 /2011 $50.00 TOTAL FEES $50.00 Calawba County has an agreement with Garbage Disposal Service, Inc. granting them an exclusive license to transport and dispose of all solid waste, including construction and demolition debris in the unincorporated areas of the County. The approval of your application for a construction/building permit is made specifically contingent upon your agreement not to utilize any other business or company to transport and/or dispose of solid waste from construction site(s). Failure to comply with this provision may result in assessment of fines up to $500 per day. This permit is issued on the express condition that the above work shall conform in all respects to the statements certified to in the application for such permit, and that all work shall be done in accordance with all applicable zoning, building, electrical, plumbing and mechanical ordinances of the County of Catawba and the State of North Carolina. A permit issued for work under this Code shall expire by limitations six months after the date of issuance if the work authorized (FOOTINGS ARE CONSIDERED 1st INSPECTION ON NEW CONSTRUCTION) has not been conmrenced. If after commencement the work is discontunued for a period of 12 months, the permit therefore $hall expire. If a project expires, a minimum fee per the current fee schedule will be charged for each building and trade permit to reactivate the project. * * *AN ADDITIONAL CHARGE PER THE CURRENT FEE SCHEDULE MAY BE ASSESSED FOR EACH UNWARRANTED INSPECTION SCHEDULED. * ** If there are any questions, please contact the office between 8:00a.m. and 5:00p.m.