Re: Written Response to City /County for Building Review
p y
is
y
Dear Mr. Deitz:
Comment 1: A written response to the comments in the order they appear in
this correspondence as well as appropriate clouded revisions to the plans
tZ shall be provided.
Response 1: Please see below.
' X
Comment 2: Special Inspections are required for this project per section
1704.1.2 of the NC Building Code, NC Building Code Council amendments
to the section and Table 1604.5 NCBC. A .pdf document entitled Special
Inspections for Catawba County (SICC) can be downloaded at
www. catawbacountync. ciov/ depts /u &e /Specialinspections.asp
t A Statement of Special Inspections (SSI) is required for this project
instructions for preparing the SSI are provided in Chapter 3 of the SICC. The
SSI shall be submitted to the CCBSD for review on 8.5 X 11 sheets along with
-` the construction documents but unattached. (see SICC -301.1 and NCSBC-
- 1704.1.1). Blank copies of the 3 -page SSI are located in Appendix A (Blank
Forms). The forms are to be prepared by the Registered Design Professional
in Responsible Charge, and the Engineers of Record for the project.
Page two of the form, identifies the types of work needing special
inspection services as well as the Special Inspections Engineer of Record and
Testing Labs responsible for the services. A review of this project has
b3 identified special inspections for the following areas: Soils (due to fill) and
Earth Retention Systems.
Page three of the form is the Quality Assurance plan and provides the
seismic and wind systems and components requiring special inspections
prepared by the Structural Engineer of Record. Page three also provides a list
of contractors responsible for the construction or fabrication of systems and
components identified in the Quality Assurance Plan.
Upon approval of the SSI by CCBSD a preconstruction meeting shall
3 be scheduled prior to permit issuance. The meeting shall be attended by the j
a Owner or Designated Agent, Architect of Record, Structural Engineer of
Record, General Contractor and Special Inspector of Record as identified on
the SSI.
Response 2: See the attached Special Inspections form and S1.1
Comment 3: Sheet C -1.0: Provide design drawings for modular block j
s retaining wall, sealed, signed and dated by a design professional licensed in
North - Carolina. It appears that the retaining wall would meet the
requirements of 2009 NCBC section 1806.2. If this is not the case provide
E
documentation that the wall does not meet the requirements of this code
section. P 1 P
O'119IEN
Response 3: The modular block retaining wall will be under a separate H f R R
permit. See attached revised drawings. + r c
Comment 4: Sheet A7.0: All wood used in construction of the auction
platform shall be fire - retardant treated in accordance with 2009 NCBC 410.4
fi and 603.1(9).
Response 4: See attached.
Comment 5: All "S" (structural) sheets shall be sealed, signed and dated by a
M design professional licensed in North Carolina.
t Response 5: See attached.
t Comment 6: Sheet S1.1: Special inspection shall be required for soils (due to
fill), and modular retaining walls.
4 Response 6: The modular block retaining wall will be under a separate
x permit. See attached revised drawings.
Comment 7: Sheet P1.0: Provide roof drain drawings (see note on roof plan
sheet A2.3) including pipe size and slope.
Response 7: See attached — building will be equipped with scuppers,
a conductor boxes and downspouts.
s` Comment 8: All "E:" (electrical) sheets shall be sealed, signed and dated by
a design professional licensed in North Carolina.
Response 8: See attached.
Comment 9: Sheet E6.0: The secondary side overcurrent protection of Panel
"R" (main breaker) appears to exceed the amount allowed by 2008 NEC
Table 450.3(B) for primary and secondary protection. Revise as required or
provide calculation showing how overcurrent protection was determined.
u. Response 9: Calculations and loads have been updated on the panel
schedules. Load summary for the service has been completed. See attached.
Please do not hesitate to contact me for any questions.
Sincerely,
PIEPER O'BRIEN HERR ARCHITECTS
_ S4
�g
x Sara Pourciau
Associate Architect