Loading...
HomeMy WebLinkAboutSAFE-6-11-19276 Partial Certificate of Compliance Letter from Turbocoating.tif ®\ UNITEDCOATINGS GROUP ur ocoa �r� f The brand built on a history of long term success. SAFE- b -<<- (R , 7 6 August 5, 2011 To Whom It May Concern: f This letter is to request a Partial Certificate of Compliance be granted for the Office Area ONLY for the Turbocoating Corp portion of the Catawba Industrial Commons building located at 1928 Main Ave SE, Hickory, NC 28602. This is to facilitate the continuation of the start up of Turbocoating Corp operations. It is understood that a final full Certificate of Occupancy will be granted upon completion and successful inspection of the permit- required work currently underway, as well as any other required safety and building inspections. It is also understood that the granting of the Partial Certificate of Compliance does not allow for occupancy of the Manufacturing or Warehouse areas by Turbocoating Corp employees. Certain Turbocoating Corp. employees, however, do have specific job functions and responsibilities, especially during the start -up phase, that requires their presence in the aforementioned areas and, as such, will be present in those areas at times in order to ensure the company becomes operational in a safe, timely and fiscally - prudent manner. Additionally, Turbocoating Corp intends to install a non - required fire alarm system. At the time that inspection of this system is required, and if deemed necessary by the inspector, Turbocoating Corp will provide all labor to move any furniture and /or equipment at the request and direction of the inspector in order to adequately inspect the fire alarm system and components. Thank you. Shawn W Callahan Facility Manager 828 - 455 -0023 'i I Turbocoating Corp. • 1928 Main Avenue SE • Hickory, NC 28602 • P 828 32 TURBO (88726) • F 828 327 7834 www.turbocoating.com