HomeMy WebLinkAboutREHA-7-10-8902 TPI Report Wall Reinforcement Room 101A.tif g gn z
�L pC- 6- t0 —7 2 �
P
Appendix A Blank Forms
s
Daily Field Report
�6A /[?, County, North Carolina
Date TPI Permit # 4
General Inspection Type: ❑ Steel E] Concrete [Masonry ❑ Wood ❑ Soils ❑ Pile ❑ Pier
F] Earth Retention Systems E] Sprayed Fire Resistance ❑ EFS
❑ Smoke Control ❑ Architectural Components ❑ Mechanical Components
❑
❑
Electrical Components Structural Observations E] Special Cases
Seismic Inspection Type: ❑ Steel ❑ Concrete ❑ Masonry ❑ Wood ❑Architectural Components
❑ Mechanical Components ❑ Electrical Components
Fabrication Inspection Type: ❑ Steel ❑ Concrete ❑ Masonry ❑ Wood
( ) Continuous ( ) Periodic Inspection Tlmee:: Beginning: Ending:
Describe inspections made, including locations: cAa
Ltgn L-l4 v4- 10 A Pyzo4 �
List tests made:
Discrepancy, list items requiring correction, corrections of previous listed items and previously listed
uncorrected items:
E
E
r
i
List changes to approved plans authorize by architect or engineer:
v
Comments:
i
To the best of my knowledge, work inspected was in accordance with the building services division
approved design drawing, specifications and applicable workmanship rovisions of the NC State Building
Code except as noted above.
Printed Name Signature: Date.
i a
(This report to be submitted with the Weekly Engineers Summary Report f ish d to the code enforcement official at the time of TPI
3 scheduled site visit.)
i