Loading...
HomeMy WebLinkAboutCBPR-6-11-11448 Engineer's Letter.tif i "t T �r LOR AND VIOLA S UCTURAL ENGINEERS J. KIRK VIOLA P.E. JAMES S. TAIL, P.E. JASON M REEF, P.E. June 6, 2011 Mr. George O. Brown, P.E. George O. Brown & Associa*) ?LLC P.O. Box 3423 Hickory, NC 28603 PI. p5 RE: HVAC Upfit for It's My Party Rentals 1230 9 Avenue NE Hickory, North Carolina. Dear George: At your request, we have visited the above referenced building and reviewed the new mechanical drawing, Sheet M -1, to determine if the existing roof structure is adequate to support (3) new roof top units shown on the new meabmical drawings. The proposed units appear to be about 4' x 6' and weigh about 800 pounds The existing steel roof joists ark 22" deep, spaced at about 4' -8" on center and spanning about 40'-0". The joists support a meW roof decking. According to our analysis, the . bar joists will support the weight of these units at the locations shown on drawing M - We recommend that the weight of each unit be spread out over a minimum of two joists. W. If you have any questions or n further assistance, please call us. Sincerely, TAYLOR & VIOLA STRUC " ENGINEERS, P.C. J. Kirk Viola, P.E. CAJ? S i t P.O. BOX 2616 • 36 15 STREET SE • HICKORY, NORTH CAROLINA 28603 TELEPH : (828) 328 -6331 - FAX: (828) 322 -1801