Loading...
HomeMy WebLinkAboutCBPR-12-10-8604 TAILORED CHEMICAL & FOAM 3RD SUBMITTAL.tif I GLEN WALKER P. E. 323 25' AVENUE NW HICKORY N C 28601 CIVIL ENGINEERING STRUCTURAL ENGINEERING PHONE 828 381 4486 SITE PLANNING FAX 828 327 3188 CONSTRUCTION CONSULTANT gew1024 @embargmaii.com 7/07/11 CATAWBA COUNTY PLAN REVIEW 76 NORTH CENTER STREET HICKORY, N C 28601 �FESS/� SEA v RE: PLAN RESUBMITTAL FOR 03 TAILORED CHEMICAL REPAIRS DUE TO FIRE �� 1 F N C '.,i/ A �` PIN #278286004 A CASE # CBPR -12 -10 -8604 ENCLOSED ARE REVISED PLANS WITH COMMENTS CORRESPONDING WITH THE NUMBER ON YOUR 5/16/11 REVIEW. 2- THE DISTANCE IS LESS THE FIVE FEET AND THE WALL IS RATED AT TWO HOURS. 3- A PORTION OF THE WALL IS CLOSER THEN 30' AND THIS PORTION IS RATED AT ONE HOUR. 4- RATED WALLS ARE SO MARKED. 5= SLOPE IS NOTED. 6- FOOTNOTE d ALLOWS PROTECTION IF SPRINKLER SYSTEM IS FURNISHED BUT NOT REQUIRED. 7- THE NEW OF THE BUILDING IS ALL OVER 20' TO THE BOTTOM OF THE JOIST. THE EXISTING PART IS 16' TO THE BOTTOM OF THE JOIST. SO WHAT WE ARE BUILDING IS IN COMPLIANCE. 8- PARAPET WALL TO EXTEND 30'.' ABOVE HIGHEST ROOF.. 9- WALLS AROUND H BUILDING ARE TWO HOURS. 10- DETAIL PROVIDED. 11- THIS WILL BE PROVIDED AS A SHOP DRAWING DURING CONSTRUCTION. 12- THE HIGH AND LOW BEAMS AT W -W ARE SUPPORTED BY THE SAME COLUMN AND CONNECTION DETAILS WILL BE SHOWN ON SHOP DRAWINGS FURNISHED BY STEEL FABRICATOR AND APPROVED BY THE ENGINEER OF RECORD. 13- DRAWINGS HAVE BEEN REVISED. 14- DRAWINGS HAVE BEEN REVISED. 15- PLAN LABELED. 16- NO HAZARDOUS MATERIAL IN THE BUILDING. 17- NO HAZARDOUS MATERIAL IN THE BUILDING. ALSO SEE MR. BROWN'S LETTERYOR MECHANICAL 16 AND 17. i 7/07/11 PAGE #2 18- 22- SEE ROMINGER'S RESPONSE ENCLOSED. FIRE REVIEW. F -8- PLANS WILL BE SUBMITTED. F -9- FIRE ALARM WILL BE PROVIDED. F -10- 22' HAS BEEN CHANGED TO 24'. F -11- BUILDINGS TO HAVE SPRINKLER SYSTEMS WITH 2 HOUR FIRE WALL SEPARATION. F -12- A KNOX BOX IS TO BE LOCATED OUTSIDE THE FENCE AS INSTRUCTED DURING FINAL INSPECTIONS. F -13- ALUMINUM CLORIDE 10,000 POUNDS PER BUILDING. F -14- FINAL LAYOUT WILL NOT EFFECT EXITS. F -15- THERE WILL BE SOME SPACES WITH TANKS AT THE BEGINNING OF OPERATIONS. F -16- ALL HAZARDOUS MATERIALS WILL BE STORED AND USED OUTSIDE AND CONTAINMENT AND CALCULATIONS ARE SHOWN. F -17- A SPRINKLER RISER LOCATION IS SHOWN ON PLANS. F -19 AND F -20- NO SMOKING SIGNS AND PLACARDS WILL BE AFFIXED TO THE BUILDING. F -20- NOTED ON PLANS. THANK YOU AND IF THERE IS QUESTIONS PLEASE GIVE ME, DAVID LOOPER CONTRACTOR, OR JACK TEMPLE III A CALL AND WE CAN GET THE ANSWER. THANK YOU, �N C AL = GLEN WALKER, P. E. 00-003