HomeMy WebLinkAboutCBPR-6-11-11356 ARCHITECT COMMETS & BUILDING DESIGN PARAMETERS.tif 2 SUBM
general contractors
" CAROLINA CONSTRUCTION L COMPANY
www.carolinaconstructiongc.com
07/05/11 E C E O v E
D
Catawba County Building Services, JUL — 8 2011
Plan Review Dept. 3� Li
76 North Center St.
Hickory, NC 28601
i Re: Fresh Air Galaxy (Bldc -6 -11- 19096)
Dear Sir:
We are in receipt of your review notes, of 6/30/11. Please find the responses as requested
and in the order requested.
1) We shall provide a written response to each of the comments and where revised on the
drawing, the change shall be clouded, per instructed.
2) All sheets have been sealed and signed by a registered professional engineer, with the
appropriate address.
3) The seal of the project designer shall comply with 21 NCAC 56.1102.
4) Product shall be stored on floor and on racks. The rack height shall be =< 12 ft. above
floor level.
5) We are only increasing the area of the Food Market for storage. The food market has a
total of 5 fixtures. Three water closets for the females and two for the men. We will be
increasing the storage area by 3414 sf. At 500 sf per person we would be adding 7
people. The owner has informed me that the most he would be adding is 2 people. The
Mercantile area is approximately 16,500 sf with existing storage of 3,900 sf. With the
3,414 sf of storage we will be adding and at 60sf per person for the mercantile area, we
will have a total of 14 people in storage areas and 24 in the mercantile area. 1 men's toilet
and 1 women's, in the mercantile area and the same in the storage area. We should be in
compliance with the existing accommodations.
6) The drawing from the Metal Building manufacturer, Kirby Building Systems, will be
forth coming and shall be delivered to the Building Services Office upon receipt.
7) All wood framing and sheathing shall be fire treated.
8)' The header for the 8ft rollup door shall be a W8x10 w/a 3/8" plate on the bottom. The
wall is not a load bearing structure.
9) The header for the six ft. opening shall be a W8x10 w/ 3/8" plate on the bottom also.
The wall is bearing, however the existing footing is sufficient to carry the point loads of
the header.
10) The thickened slab is sufficient to carry the load of the corridor wall and share of the
roof. With a soil bearing capacity of 2000 psf, the beam is carrying less than 600 lb.
11) As mentioned in item seven. , the plywood and all wood shall be fire treated material.
p.o. box 1058 - hickory, nc 28603 - 828.256.4343 tel - 828.256.4346 fax
I
12) Dimensions have been added to detail as requested. See Sht. S -1.
13) Note corrected to say " See Footing Schedule on Sht. S -1 ".
14) Mechanical Corrections on C -2, Appendix B have been made.
15) Each unit capacity is 75,000 BTU. See `M' Sheet and revised Appendix B, C -2.
16) The total load on the 1" gas line feeding the existing and the new addition will be
450,000 BTU's.
17) The design pressure of the system shall be 2 lb.'s. The distance to the futhest device is
approximately 220 lft.
18) The occupancy of the building addition is for storage and the NCECC 505.2.2.1 and .2
should not apply.
Respectfully submitted,
•S ��S�t y _
C. Conway Wilson, E
C)
i
general contractors
C AROLINA C ONSTRUCTION C OMPANY
www.carolinaconstructiongc.com
07/07/11
Catawba County Plan Review
76 North Center St.
Hickory, NC 28601
RE: Fresh Air Galaxy, Longview (Fire -6 -11- 11355)
Dear Sir:
1) We are in receipt of your review notes and acknowledge that the notes are pertaining to
the fire code only and that other trades may make review and make comments as well.
2) With this document, we are in compliance to respond to each of the review comments, in
the order of the review notes.
3) We understand and acknowledge that this portion of the review does not cover all code
issues and that other code officials may make additions and /or corrections to the notes.
4) We understand that this review in no way relieves the design professional from his duty
to design in compliance to all state and local codes and ordinances.
5) We agree that all emergency lights and exit signs, in the areas of discharge, shall be
tested in the field.
6) We acknowledge that all tactile EXIT signs shall comply with the ICC Al 17.1
requirements.
7) The existing Galaxy market and storage are fire sprinkled. The three tenant areas are not.
8) The walls separating the market from the tenant areas, as well as the tenant areas from
tenant areas are constructed of two wythes of brick, yielding a 2- hour protected wall,
which should be adequate to meet the code separation requirements.
9) We are aware of the need to relocate the FDC. We have made note of this on Slit. 1.0,
basically routing the FDC and the Blow off piping around the C -1 Column and through
the South wall. The piping will be protected by a steel bollard.
10) We acknowledge that when the sprinkler system is disabled in any way, it is the
responsibility of the GC and/or the Fire Sprinkler contractor to notify the Fire Marshall's
office and the local fire department.
11) Sprinkler plans shall be developed and submitted before any modifications of the existing
system is made.
12) At present, the Galaxy Market is the only area with a fire alarm system. Plans shall be
prepared and approved before any modifications to stem are made.
13) Per direction, we have added the 2 ea. 10 lb. ABC See sht. 1.0.
Respectfully Submi
Con�W
PE .Z
�Nls/av
s
i
p.o. box 1058 - hickory, nc 28603 - 828.256.4N'94d - `" - 828.256.4346 fax
JUL -11 -2011 12:50 From: To:8283226814 P.2/2
�, "... Kirby Date: June 7, 2011
B uilding Project Name: FRESH AIR GALAXY
Project Location: HICKORY, NC
� Sysl ems Ruilding:
A) RF: 60-02" x 51'00" EH: 15' -08" ,4997:12 Slope
A Ir1>w..iclorQ Company
CAROLINA CONSTRUCTION CO.
3882 SPRINGS RD.
HICKORY, NC 28601
Attn.: PHIL BUNTON
KB$ PrOeCt 0 K11MO285 MBMA Building Fnd Usc: 4 2 COMMERCIAL WAREHOUSINGISTORAGE
This Letter of Design Certification ensures that the materials supplied by Kirby Building Systems are designed in accordance with the information
specified to Kirby on the order documents and summarized by the loading information listed below. The Project Engineer of Record (not Kirby
Building Systems' Design Engineer) is responsible for verifying that the building code and design 100ds meet any and all applicable local
requirements.
Kirby Building S stems is a member of MBMA Kirby Sulldinq Systems is IAS AC -472 Accredited MB -159
DESIGN CODE CRITERIA:
Structural Loads Applied iii General Conformance with' 2009 NORTH CAROLINA BUILDING CODE
Occupancy Im ortance Classification: II
PROJECT -WIDE LOADING INFORMATION:
Ground Snow Load 15.0 PSF Snow Exposure Factor, Ce: 1.0 Snow Imp. Factor, Is: 1.0
Roof Live Load: 20.0 PSF WITH TRIBUTARY REDUCTION, MINIMUM 12 0 PSF
Wind Velocity: 90 MPH Wind Exposure' B She is Not Lac;,led Within The Wind -Bome Debris Region.
Wind Imp. Factor, Iw 1.0
Ss: 0 297 51: 0.090 Sa. 0.305 sdl: 0.157 Seismic Imp. Factor, le: 1.0
Seismic Design Category: C Site Class 0 TL. S
Analysis Procedure: EQUIVALENT LATERAL FORCE PROCEDURE
BUILDING - SPECIFIC ADlNG INFORMATION
Bldg Roof Dead Collateral Snow Wind Seismic (Lateral) Seismic (Lon itudinal)
(psf)• Pri sf) Sec (psf) Ct Cs PA (oaf) Enclosure GCpi R Cs V (kips) R Cs V (kips)
A 2.5 4.0 4.0 1.0 1.0 15.0 ENCLOSED 018 3.0 0.103 4,14 E 3. 0 0.103 2.99 E
"Primary Structural Not Included A: Ordinary Steel Moment Frames, OSMF
' Seismic Force Resisting System 8: Intermadiare Steel Moment Frames, 1SMF
C: Ordinary Steel Concentrically 11-aced Frances, OSCBF
D: Cantllavered Column System to COnlorm to the Requirements of OSMF. CCS
E. Steel Systems Not Specifirally Detailed for Scismic Resistance, Except CGS
AUXILIARY LOADIN INFORMATION: F' Other (Steel Panel Uia nragrn / Shear Wall / Other
The design of structural members supporting roof gravity loads is controlled by the more critical effect of roof live or roof snow load applied In
accordance with the governing budding code.
All A325IA490 bops greater than 112" diameter are usiyi in wnnections defined as SNUG TIGHT.
DES IGN STANDARDS REFERENCED:
AISC Specification for Structural Steel Buildings - Allowable Stress Design, Thirteenth Edition, 2005
AISI North American Speciffc2tion for the Design of Cold - Formed Steel Structural Members, 2007
• MBMA Low Rise Building Systems Manual, 2006 Ed.
• AWS D1,1 -04 and D1.3 -98 Structural Welding Codes �� Q` • • • • •.
Design Enginccr. MEHDI KARIMAN �d • 0� S $/ �. ��
Sealing Engineer: FORREST RUS SFI -I-, PEQ
A
el
•,,, Ir
j
I,