Loading...
HomeMy WebLinkAboutCBPR-5-11-11066 WILLIAM SONOMA BATHROOM UPFIT 2ND SUBMITTAL.tif s ' BB +M A R C H I T E C T U R E P L L C J1o�� June 14, 2011 3 Catawba County Plan Review ` Re: 2973 Kelly Blvd- Williams- Sonoma upfit #BLDC -5 -11 -18451 BUILDING REVIEW (1). A written response to the comments in the order they appear in this correspondence as well as appropriate clouded revisions to the plans shall be provided. Reply: See below (2). Sheet A2.01: Dimension stall to verify compliance with handicap accessibility requirements Reply: See added dimensions on sheet A2.01 (3). Sheet A2.01: Verify that the wheelchair accessible stall door is self - closing per ICC/ ANSI A117.1 -2003 604.8.3 Reply: See added notes on sheet A2.01 (4). Sheet M1: Verify if RTU 1, 2, 3, 6 and 8 are existing or new. Reply: RTU units are existing. They were permitted under a previous permit. See attached letter from Mechanical engineer (5). Sheet M1: The thermal zone for Catawba County is incorrect. Revise Reply: Drawing has been revised. Thermal Zone corrected from 8 to 4 (6). Sheet M1: Verify if RTU 1 thru 9 are new or replacing existing units. If new, provide letter from structural engineer verifying that roof will support units and no additional support is needed for the roff at the units. Reply: RTU units are existing. They were permitted under a previous permit. See attached letter from Mechanical engineer (7). Provide the latest revision of the electrical drawings. Per telephone conversation with the electrical design professional the copy submitted for review has been revised. Reply: See attached current drawings E1, E2 and E3, updated to include Fire Review comments as well. CATAWBA COUNTY FIRE APPROVAL (1) thru (6). These are general statements from the reviewer and do not require a response. General contractor will confirm these in the field. (7). Emergency Lighting shall be provided in each restroom Reply: See sheets E2 and E3 for revisions to plans showing emergency lighting in each restroom (8). Fire alarm notification devices shall be provided and installed in each restroom. Alarm Plans /permitting required prior to installation of any component of the system. Reply: Plans will be submitted and approved prior to installation 1 435 tivr.,?si mo "pro v c ,14 ' 3 <" X 04 3 4 ,, ,, a BB+M A R C R I T E C T U R E P L L C S Williams- Sonoma Bathroom Upfit i (9). Plans indicate extension of the exiting sprinkler system into the new restrooms. Sprinkler i Plans /Permitting required prior to installation of any component of the system. Reply: Plans will be submitted and approved prior to installation Sincerely, BeachamBunce +Manley Architecture, PLLC Ann Erickson, IIDA Director of Interiors Attachments: Revised sheets - A2.01, M1, E1, E2, E3 i i i j 1 s ENGINEER S P.A. PLUMBING • MECHANICAL • ELECTRICAL DESIGN June 13, 2011 Mr. Steve Deitz Catawba County Plan Review 76 North Center Street Hickory, NC 28601 Re: Plan Review Comments Dated 6 -10 -11 William Sonoma Bathroom Upfit PIN #375112955597 Mr. Deitz, The following is in response to the mechanical review comments. Comments #4 & #6 - All nine rooftop units RTU -1 thru RTU -9 on the Manufacturing Area and RTU -10 on the office were permitted under a previous permit. Comment #5 - Thermal Zone corrected from 8 to 4. i 3 Sincerely, W. Clinton Canaday, PE, FPENC MCL Engineers } cc: Hickory Sheet Metal Co. E 346 THIRD AVENUE N.W. - P.O. BOX 2648 - HICKORY, NORTH CAROLINA 28603 PHONE: 828-328-5246 FAX: 828-328-9457