Loading...
HomeMy WebLinkAboutREHA-7-10-8902TPI Soils Report for the canopy footings.tif 06/21/2011 15:58 8286954491 ECS CON PAGE 02 REHA - 7 - (o- ggo1.. Appendix At Blank Forms Daily Field Report Catawba County, North Carolina Rep # TPI Permit # Date �`' I Re p General Inspection Type: ❑ Steel ❑ Concrete ❑ Masonry ❑ Wood oil ❑ Pile ❑ Pier (Check one box only.) ❑ Earth Retention Systems 0 Sprayed /Coated Fire ResistAnce ❑ ElFS []Smoke Control [] Architectural Components ❑ Mechem_ - al Components ❑Electrical Components ❑Structural Observations ❑ SpOcial Cases Seismic Inspection Type: ❑ Steel ❑ Concrete [j Masonry [] Wood ❑ Architectur "l Components (Check one box only.) ❑ Mechanical Components []Electrical Components Fabrication Inspection Type: (Check one box only.) ❑ Steel ❑ Concrete Masonry? ❑ Wood ( ) Continuous () Periodic Inspection Time: Beginning: _ _ Ending: Describe Inspections made, including locations: ���° r _ .' List tests made: �- -- Discrepancy, list items requiring correction, corrections of previous listed items and preYriously listed uncorrected items: List changes to approved plans authorize by architect or engineer Comments: To the best of my knowledge, work inspected was in accordance with the building Services division approved design drawing, specifications and applicable workmanship provisions of the NC StatetBuilding Code except as noted above. Printed Name: �i9nature pate: . _ G I ( This report to be submitted with the Monthly Engineers summary Report or 4umished to the code enforcFment official at time of TPI scheduled site visit,) fast S