Loading...
HomeMy WebLinkAboutPLN2009-00345 Architect Comments.tif Lo .7.0dol- Do - 345 - I S I E S T E June 10, 2011 �Ai�(-rlil I ECTS Conover Multimodal Center C-5130 119 E. Franklin St, Suite 300 Chapel Hill, NC 27514 To: Joel Herman 1 OOA South West Boulevard Newton, NC 28658 From: Ed Conlon Dear Mr. Herman: I apologize for the confusion in the field regarding the mechanical system. TKa has a record of transmitting revised drawings to Brandon Lewis on September 30, 201 but it was only brought to my attention yesterday that the set of drawings the field inspectors are using are the original permit set dated October 23, 2009. Since the project is nearly complete, I will summarize the changes to the drawings that were delivered to your office yesterday afternoon. Please note that although there were a lot of sheets delivered yesterday, most of these revised sheets are related to the change from a geothermal system to a more conventional mechanical system. The only Other changes involve eliminating Vestibule 209, and the elimination of the finished electrical and mechanical fixtures at the Main Level Tenant spaces. Here is a summary of the changes by sheet: CS1: Cover sheet changed to reflect revised date(s) and addition of CS2.2 — Chapter 34 Evaluation Spreadsheet. CS2.11: Note added to refer to sheet CS2.2 for NCBC Chapter 34 Evaluation Spreadsheet for compliance alternative for the existing building. CS2.2: Sheet added to show how the existing structure complies with NCBC Chapter 34. Note that this alternate means of compliance was applied only because 1 building element was unable to comply with the 2009 NCBC: Separation distance between exits at the Main Level. See revised sheet CS4. CS4: Main Level Life Safety Plan revised to show the distance between exits is 50'-7" where 56'-7" would be required to comply with 2009 NCBC (1/3 the overall diagonal distance). For this reason, the Chapter 34 Evaluation Spreadsheet (Sheet CS2.2) was used to provide the required compliance alternative. telephone 919-967-0158 CS1 Cover sheet changed to reflect revised date(s) and addition of fax/data 919-967-0159 CS2.2 — Chapter 34 Evaluation Spreadsheet. www.tisekiester.com AIA: Lower Level Floor Plan was revised to indicate the mechanical well for the revised mechanical system. s June 10, 2011 Conover Multimodal Center I_ C -5130 119 E. Franklin St, Suite 300 Chapel Hill, NC 27514 A1.2: Main Level Floor Plan was revised to indicate the mechanical well for the revised mechanical system. Also, Vestibule 209 was removed per the Owner's request. Once this Vestibule was removed, the Chapter 34 Evaluation Spreadsheet (Sheet CS2.2) was used to provide the required compliance alternative for separation distance between exits. See sheet CS2.2. A2.1: Lower Level and Main Level Partial Plans were added to show the mechanical well for the revised mechanical system. A8.1: Main Level Reflected Ceiling Plan was revised to show no light fixtures at the future tenant upfit spaces. Note that the required temporary lighting is shown on the electrical drawings. P1.1A: Lower Level Plumbing Plan was revised to indicate plumbing changes as it relates to the revised mechanical system. M1.1A: Replace M1.1 with this revised sheet which shows the revised mechanical system. Note that the ductwork at the Main Level Future Tenant spaces will now be part of the future upfit. M1.2: Upper Level Mechanical plan has been revised to reflect the changes to the mechanical system. M1.3: This sheet has been revised to show the equipment at the new Mechanical well. M2.1: Mechanical Piping Plans have been revised to reflect the changes to the mechanical system. M2.2: Mechanical Piping Plans have been revised to reflect the changes to the mechanical system. M3.1: Mechanical Notes have been revised to reflect the changes to the mechanical system. M3.2: Mechanical Schedules have been revised to reflect the changes to the mechanical system. M4.2: Mechanical Details have been revised to reflect the changes to the telephone 919.967.0158 mechanical system. fax /data 919967.0159 www.tisekiester.com M4.3: Mechanical Details have been revised to reflect the changes to the mechanical system. i i June 10, 2011 • • I 7LIA, Conover Multimodal Center C -5130 119 E. Franklin St, Suite 300 Chapel Hill, NC 27514 M5.1: Mechanical Schematic Controls have been revised to reflect the changes to the mechanical system. M5.2: Sheet added. Mechanical Schematic Controls have been revised to reflect the changes to the mechanical system. E1.1: Main Level Lighting Plan was revised to indicate temporary lighting only at the Future Tenant Spaces. E2.1: Lower Level Power Plan has been revised to reflect the changes to the mechanical system. Main Level Power Plan has been revised to show the power for the Future Tenant Spaces to be performed as part of the future upfit. E2.2: Upper Level Power Plan has been revised to reflect the changes to the mechanical system. E2.3: Panel Schedules have been revised to reflect the changes to the mechanical system. A Power Plan has been added to show power to the new equipment at the Mechanical Well. Thank you for your attention to this project. Please contact this office if you need additional information to complete your review. Sincerely, Tise- Kiester Architects, PA +7 Edward W. Conlon Project Architect cc: Lance Hight, City of Conover Attachments: Revised Drawings (under separate cover) telephone 919.967 -0158 fax /data 919967.0159 www.tisekiester.com