SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 IN VIOLATION YES IN COMPLIANCE Project
Logging Project Number Case-4-11-2747 Person Financially Responsible Phillip Barringer Address PO Box 2525, Hickory, NC 28603-2525 1. Project Location 3350 Eller Dr, Newton, NC 28658
Pictures: Prints Slides Digital Video 2. Weather and Soil Conditions Warm, dry 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer
to Catawba County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and
fills too steep 31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain
erosion control measures 31-13 e. Insufficient measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4
(d) l. Other (describe): Construction entrances needed to be installed at all accesses to property. 6. Phase of Grading a. rough grading complete b. final grading complete Description:
7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural
watercourse off the tract Other property Road/walkway Description: Degree of damage: Slight Moderate Severe 9. Contact made with (name)n/a Title Inspection report in case file due to
no activity given or sent to Person Financially Responsible. Date given/sent: 10. Corrective actions needed: Submit an adequate sedimentation and erosion control plan for approval, covering
all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation and erosion control measures
as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated diversions as shown on the
approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract: Construction entrances at
all access points and install erosion measures along Muddy Creek and all tributaries. Install adequate drop inlet protection as shown on the approved plan, including but not limited
to the following locations: Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the
following areas: Provide adequate permanent ground cover on all areas where development has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60
calendar days, whichever is shorter, in High Quality Waters): Maintain all sedimentation and erosion control measures as as specified in the approved plan and as required to prevent
sedimentation damage including the following locations: 11. Comments: No activity since last inspection: Report by: Kim Sue Others present:
Date of inspection: 4-28-11 Time arriving at site: 9:50 Time leaving site: 10:20 cc: , ,