Loading...
HomeMy WebLinkAbouta_21 6" DIA. PIPE FILLED W/ CONIC. ROUNDED UP ON TOP AS SHOWN, SEE PLAN FOR OCCURANCE F SEE PLAN FOR SLAB THICKNESS POUR CONIC, 4" ALL AROUND PIPE IN GROUND AS SHOWN - B 1 TYP_ BOL SCALE: I/2 ". I' -0" E 0 0 DETAIL D C )TYP_ TRENCH DRAIN A2.0 SCALE: NTS 8 „ 6" 8,1 W Q r TOP ASPHALT 1 PAVING I PRE -CAST CHANNEL MIN. GRATE O • .N. •. • •• N •• DRAIN- SEE PLAN FOR W F- SIZE m WW Z — • tl • J 3 BARS CONT_ w/ TIES T _ I I O S E C T I O N f D C )TYP_ TRENCH DRAIN A2.0 SCALE: NTS 0 5 I 6 E RETAINING W,4LL SECTION A2.o SCALE- 3/4 "• V -0" 12" 20" 12" W Q " D- N O _j U ��I�IIIIIIIIIII�IIIII ���� ��° ��������w:�� FINISH 3N F- GRADE m WW Z Q — U D_ 0_ O U f G.G. FUR ISH AND INSTALL A PRE- FINISHED ALUMINUM GUTTER AND 3" G,I, PIPE DOWN SPOLRAB SHOWN, DOWN SPOUT TO TIE INTO NEW SET CAST IRON AT THIS END OF BLDG. D STEPS a 15 "O /C TF n 24" CATCH BASIN IS OVER 5' -0" DEEP CEMENT PIK O WASH SEE PLAN FOR PIPE .., °.. .. .; SIZE CONC FOOT'G W/ 6x600 -10 NOTE WWM PRECAST CATCH BASIN MAY BE USED IN LIEU of BUILT IN PLACE w/ APPROVAL BY ARCHITECT -SECT ION rl CATCH BASIN A2_0 SCALE: NT5 0 5 I 6 E RETAINING W,4LL SECTION A2.o SCALE- 3/4 "• V -0" 7 CBSA Architects i Architecture•Planning • ln[erior Design www, cbea- architects. com Post office box 1239 F 226 second street nw hickory, north Carolina 28601 phone ( 322 -3403 fax (828) 322 -1802 email cbsa @cbsa- architects.com CONSULTANTS 0 E LL w MENNEN W Q " D- N O _j U ��I�IIIIIIIIIII�IIIII ���� ��° ��������w:�� —•• • 7 CBSA Architects i Architecture•Planning • ln[erior Design www, cbea- architects. com Post office box 1239 F 226 second street nw hickory, north Carolina 28601 phone ( 322 -3403 fax (828) 322 -1802 email cbsa @cbsa- architects.com CONSULTANTS 0 E LL SLOPE ALL EXTERIOR Al AM$ A-11AY FROM 2" THICK X 24" WIDE BUIL DING PERIME INSULATI . - PERIMETER OCONCR SLABS. BUIL F DETAIL B A2.0 SCALE: 3/4 "• 1' -0" FREEZER/COOLER WEST ELEVATION N M / - 3x3x.3125 ANGLE W/ %" EXPANSION BOLT v32 "O -C. EN EXISTING/NE. -W yld1d .. >= O O aaal H z � Q V Z W O Z =UO yQ0 y 0 W i LL U W .d C ED V m W a W a L 6 3 W g Z MARK I DATE DESCRIPTION SCH 05 01 07 SCHEMATIC PHASE I DD 1 DESIGN DEVELOPMENT CO 1 05 11 07 1 BID SET PROJECT NO: 2007.017 CAD DWG FILE: DRAWN BY: WH CHK'D BY: RLS COPYRIGHT: TIE 3" C.I. D A S INTO CBSA ARCHITECTS, INC. 2006 NEW CB SHEET TITLE SECTION /DETAILS ELEVATIONS 5 w 7 W Q " D- N O _j U a W 3N F- J W m WW Z Q — U D_ 0_ O U f G.G. FUR ISH AND INSTALL A PRE- FINISHED ALUMINUM GUTTER AND 3" G,I, PIPE DOWN SPOLRAB SHOWN, DOWN SPOUT TO TIE INTO NEW CATCH BASIN AT THIS END OF BLDG. D SLOPE ALL EXTERIOR Al AM$ A-11AY FROM 2" THICK X 24" WIDE BUIL DING PERIME INSULATI . - PERIMETER OCONCR SLABS. BUIL F DETAIL B A2.0 SCALE: 3/4 "• 1' -0" FREEZER/COOLER WEST ELEVATION N M / - 3x3x.3125 ANGLE W/ %" EXPANSION BOLT v32 "O -C. EN EXISTING/NE. -W yld1d .. >= O O aaal H z � Q V Z W O Z =UO yQ0 y 0 W i LL U W .d C ED V m W a W a L 6 3 W g Z MARK I DATE DESCRIPTION SCH 05 01 07 SCHEMATIC PHASE I DD 1 DESIGN DEVELOPMENT CO 1 05 11 07 1 BID SET PROJECT NO: 2007.017 CAD DWG FILE: DRAWN BY: WH CHK'D BY: RLS COPYRIGHT: TIE 3" C.I. D A S INTO CBSA ARCHITECTS, INC. 2006 NEW CB SHEET TITLE SECTION /DETAILS ELEVATIONS 5 SCALE: 1/4 ". P -0" 6 7 A2.0 SHEET OF " O 2 -3 PRE -FIN. JUM. GUTTER ALL WOOD BLOCKING TO BE PRE5URE TREATED MEMBRANE ROOFING OVER 4" RIGID INSULATION 4 „ OVER 111 7" GYP_ SHEATHING AND 1 1 111" 'B' DECKINC I 4X4X3/8" L BRG. PL. 1 117 "XiI `� - CONTINU W/2 117" D, STUDS - 1N I 111 ST, STS, 6 16" o /c. I" HAT CHANNELS 3 518" ST. STS. a 16" o /c_ - PRE - FIN. ALUM DR . \IP 4' �< = :UR IN-- PERF. ALUMINUM SOFFIT ATTACHED TO HAT / \� CHANNELS AND 3 5 /8" J / \ STEEL STUDS AS SHOWN_ 1 0 . P 1 6" THICK SLAB W/ 2" TURNDOWNS. SLOPE AWAY FROM BUILDING. 111 x" LOWER 6 DOOR THAN INSIDE SLAB- SEE EXTERIOR PLAN - 0 a as LINE OF FOOTING BEYOND L 0 WSXI3 BEAMS SPACED AS SHOWN ON STRUCT, DLUG_ EXTEND CMU WALL TIGHT UP W14X22 AGAINST BOTTOM OF DECKING AND CLOSE FLUTES IN DECKING ABOVE WALL. COVER STUDS W/ 5/8" WR GYP. BD, L a _ W O 4'"I THICK CONCRETE SLAB W/ 6X6 10/10 WWM OVER V POR BARRIER AND 4" WASHED STONE AS SHOWN, A BLDG_ CR055ECTI0N PRE FINISHED. EDGE TRIM. PRE - FINISHED METAL PANEL CLOSURE PANEL ATTACHED TO HAT CHANNELS OVER 3 5/8" STEEL STUDS SPACED m W' o/c MAX. COLOR TO MATCH EXISTING METAL PANEL ABOVE. ATTACH 5/8" EXT_ GRADE PLYWOOD UP STEEL STUD5 TO TURN ROOF MEMBRANE UP TO AS SHOWN. COOLER / FREEZER MANUFACTURER TO INSTALL MEMBRANE ROOF, TAPERED INSULATION, P_T, WOOD BLK'G., AND FLASH TO EXISTING BRICK WALL AND FLASH TO MET FASCIA- LEFT END. 020 FLASHING ON BRICK WALL BEYOND COORDINATE DEPRESSION IN SLAB TO ALLOW TOP OF CERAMIC TILE FLOORING IN CORRIDOR 100 TO ALIGN JJI TOP OF FLOOR SLAB OF COOLER / FREEZER.G.0 PROVIDE HRESHOLD UNDER DOORS a _aa 4" THICK CONCRETE SLAB W/ 6 6 10/10 WWM OVER VAPOR BARRIER AND 4" WASH D STONE AS SHOWN, 1' -0" CMU L L 4" CAP BLOCK "3a16"O.C. 0 VERT. REINF, 16" O.C. "4 BAR AV O .C. SLOPE CONC. AWAY FROM WALL FILL W/ GROUT 03 o IS "O,C, 2 - "3 2 03 CONC_ FOOTING I'- 0 "4' -0" SOUTH ELEVATION SCALE= 1/4 "• V -0" 3 4 SCALE: 114 ". P -0" 1 1 2 In ? " O F- @ m Q U LL U (_ d) 0) L a _ W O 4'"I THICK CONCRETE SLAB W/ 6X6 10/10 WWM OVER V POR BARRIER AND 4" WASHED STONE AS SHOWN, A BLDG_ CR055ECTI0N PRE FINISHED. EDGE TRIM. PRE - FINISHED METAL PANEL CLOSURE PANEL ATTACHED TO HAT CHANNELS OVER 3 5/8" STEEL STUDS SPACED m W' o/c MAX. COLOR TO MATCH EXISTING METAL PANEL ABOVE. ATTACH 5/8" EXT_ GRADE PLYWOOD UP STEEL STUD5 TO TURN ROOF MEMBRANE UP TO AS SHOWN. COOLER / FREEZER MANUFACTURER TO INSTALL MEMBRANE ROOF, TAPERED INSULATION, P_T, WOOD BLK'G., AND FLASH TO EXISTING BRICK WALL AND FLASH TO MET FASCIA- LEFT END. 020 FLASHING ON BRICK WALL BEYOND COORDINATE DEPRESSION IN SLAB TO ALLOW TOP OF CERAMIC TILE FLOORING IN CORRIDOR 100 TO ALIGN JJI TOP OF FLOOR SLAB OF COOLER / FREEZER.G.0 PROVIDE HRESHOLD UNDER DOORS a _aa 4" THICK CONCRETE SLAB W/ 6 6 10/10 WWM OVER VAPOR BARRIER AND 4" WASH D STONE AS SHOWN, 1' -0" CMU L L 4" CAP BLOCK "3a16"O.C. 0 VERT. REINF, 16" O.C. "4 BAR AV O .C. SLOPE CONC. AWAY FROM WALL FILL W/ GROUT 03 o IS "O,C, 2 - "3 2 03 CONC_ FOOTING I'- 0 "4' -0" SOUTH ELEVATION SCALE= 1/4 "• V -0" 3 4 SCALE: 114 ". P -0" 1 1 2