Loading...
HomeMy WebLinkAboutcover_7Reviewer: James Lamb CCPR -Plans Completed 8/23/2007 APN JML Fire Status: Complete - Approved with Notes Comments: HKY FIR - Plans Received RECD ML HKY FIR - 1st Review 8/16/2007 APN KD 08/16/2007 1st REVIEW APPROVED WITH NOTES: 1. As submitted this modular building is spaced at a distance from the existing buildings that the Modular Classroom would be considered a separate building and therefore with an occupancy less than 50 a fire alarm system would not be required. A means to notify occupants in this modular classroom in the event of an emergency or fire as required per Chapter 4, Emergency Planning & Preparedness of the 2006 North Carolina Fire Code, would be required. A fire evacuation / fire safety plan is also required. 2. In Groups Educational occupancies, curtains, draperies, hangings & other decorative materials suspended from walls or ceilings shall meet the flame propagation performance criteria of NFPA 701 in accordance with Section 806.2 or be noncombustible. 3. Portable fire extinguishers shall be selected, installed and maintained in accordance with Section 906 of the 2006 North Carolina Fire Prevention Code and NFPA 10. 4. The building or structure shall not be occupied prior to the code official issuing a permit that indicates that applicable provisions of the North Carolina Fire Prevention Code has been met. HKY FIR - Plans Completed HKY FIR - Plans Received HKY FIR - 2nd Review 8/23/2007 DONE KD RECD ML 8/23/2007 APN KD 08/23/2007 2nd REVIEW 1. Revisions to address Catawba County Building Services comments. 2. See Hickory Fire Prevention Bureau plan review comments dated 08/16/2007. END OF SECOND REVIEW Utility status: Complete - Approved with Notes Comments: HKY PU - Plans Received 8/20/2007 RECD RM HKY PU - 1 st Review 8/20/2007 APN RM Approved with notes 1. Any existing water and or sewer services shall not be disturbed during construction. Thursday, August 23, 2007 Page 3 of 4 Notice: All revisions to plans must be submitted as one package. Multipage plans should not be submitted seperately. All sheets should be stapled or otherwise attached for each set submitted!