North Carolina Department of Health and Human Services
Division of Health Service Regulation
Construction Section
2705 Mail ServiceCenter.Raleigh,North Carolina27699-2705
Beverly Eaves Perdue,Governor
Lanier M.Cansler,Secretary
Jeff Horton,Acting Director
August 10,2009
Mr.Kim Harris,Administrator
Abernethy Laurels
102 Leonard Avenue
Newton,NC 28658-0102
RE:Project Number NH-2179/CBB
FID Number 923287
Abernethy Laurels
Nurse Call System Replacement
Newton (Catawba Co.)
Dear Mr.Harris:
William L.Warren,Chief
Phone:919-855-3893
Fax:919-733-6592
The engineering portion of final working drawings dated June 22,2009 (received June 24,2009 fee paid
July 17,2009)for the referenced project has been reviewed for conformance with licensure's minimum
standards for Nursing Homes (lOA NCAC Chapter 13,Subchapter D).The engineering drawings are
approved provided the following conditions are met:
1.Please verify the location of the nurse's station and nurse's call panel on the lower level of Unit
M.It is not shown on the drawing.
2.Please verify visual nurse call signals in the lower level of Corridor 1068 it is not shown the
drawing.This is required per Licensure rules.
3.Please verify visual nurse call signals located in the upper of Corridor 2150,it is not shown on the
drawing.This is required per Licensure rules.
4.Electric system and upgrades must meet the appropriate requirements of the National Electrical
Code (2008 Edition).
We must receive a written response from your engineer to this review.
Please note that changes or revisions should be submitted to our office for review approval prior to
completion of the work.When construction is not started within one year ofthe date of this letter,our
Location:701 Barbour Drive.Dorothea Dix Hospital Campus.Raleigh,N.C.27603
An Equal Opportunity /Affirmative Action Employer
Project Number NH-2179/CBB
Abernethy Laurels Nurse Call System Replacement
August 10,2009
Page 2 of3
approval of these documents expires and they are subject to re-view for compliance with any changes in
the governing codes and regulations that may occurred.
Please understand that review of these documents in no way relieves the owner,the architect,or the
engineer from the responsibility of violation of governing codes and regulations not found by our office
or other reviewing agencies.When such violations are found they must be corrected.
Prior to our final approval!recommendation for licensure and occupancy or our final inspection,we will
need copies of the following information;
1.A copy of the Certificate of Occupancy issued by the local Code Enforcement Official having
jurisdiction.(NC Administrative Code,2002 edition,Section 307)
2.A letter from the design architect and engineer confirming that their firms have inspected the project,
and have found it to be constructed in conformance with approved plans and specifications;and that
our review conditions of drawing approval have been met in the construction.
3.Confirmation that all electrical materials,devices,appliances,and equipment located in the project
area have been evaluated for safety and suitability for their intended use by an approved testing
agency (such as Underwriters Laboratories).This evaluation must be conducted in conformance with
nationally recognized standards,and must be conducted by a qualified testing laboratory.(N.C.
General Statue 66-25)
The above material may be mailed to our office within two weeks of the final inspection.Hand delivered
during our final inspection,or mailed following our final inspection.Unless otherwise indicated,we will
not recommend occupancy or licensure until all documents that are applicable to the project have been
received and approved by this office.
For the final inspection required prior to occupancy and /or licensure,we ask that you (the owner)notify
our office in writing 10-14 days prior to the anticipated completion date of the construction in order that
we may schedule your inspection more effectively.For purposes of the final inspection,we expect to find
all building systems to have been completed,tested and in operational order.During the final inspection
process,the owner should have present,representatives of the various trades and!or equipment installers
necessary to demonstrate that all systems are functioning.Failure to have knowledgeable personal at the
final inspection may result in an incomplete (not approved)inspection.
You may access the licensure rules for the licensure category referenced above at the following DHSR
website:http://www.ncdhhs.gov/dhsr/testrules.htm.
This project has been reviewed under the 2009 edition of the NC State Building Codes as a one-story
fully-sprinklered building of Type V-A construction under Group 1-2 occupancy.
You may access the current licensure rules for the licensure category referenced above at the following
DHSR website:http://www.ncdhhs.gov/dhsr/tcstrules.htm.
Please use our Project Number NH-2179/CBB on all correspondence related to this project.
Project Number NH-2179/CBB
Abernethy Laurels Nurse Call System Replacement
August 10,2009
Page 3 of3
If you have any questions or if we can be of any further service please let us know.
Sincerely,
Charles Brown
Charles Brown
Building Systems Engineer
DHSR Construction Section
Phone 919-855-4666
Charles.b.Brown@dhhs.nc.gov
cc:Schertz Franklin Crawford Shaffner Inc.(via e-mail only)
City of Newton,Building Inspections Dept.(via e-mail only)
SFCS Architecture
Engineering
Planning
Interiors
SFCS Inc.0 305 South Jefferson Street 0 Roanoke,VA 24011-2003
540-344-6664 0 Fax 540-343-6925 0 www.sfcs.com
Abernethy Laurels Nurse Call System Replacement
Comm.No.5119.07 '
Responses to DHSR Review Comments (dated 08/10/09):
August 18,2009
Review Comment #1:
Please verifY the location of the nurse's station and nurse's call panel on the lower level of Unit
M.It is not shown on the drawing.
SFCS Response:
Refer to General Note 5 on Drawing E1.2.The upper and lower floors on this drawing are
licensed for "Homes For The Aged And Infirm".Per the requirements of lOA NCAC 13F .0311
a nurse's call panel on the lower level is not required.Also note that the CNA's will have a pager
and that calls for assistance will be sent to the caregiver.
Review Comment #2:
Please verify visual nurse call signals in the lower level of Corridor 1068 it is not shown the
drawing.This is required per Licensure rules.
SFCS Response:
Refer to General Note 5 on Drawing E1.2.The upper and lower floors on this drawing are
licensed for "Homes For The Aged And Infirm".Per the requirements of lOA NCAC 13F .0311
nurse call signals are not a required on the upper or lower levels.
Review Comment #3:
Please verifY visual nurse call signals located in the upper of Corridor 2150 it is not shown on the
drawing.This is required per Licensure rules.
SFCS Response:
Refer to General Note 5 on Drawing E1.2.The upper and lower floors on this drawing are
licensed for "Homes For The Aged And Infirm".Per the requirements of lOA NCAC 13F .0311
nurse call signals are not a required on the upper or lower levels.
Review Comment #4:
Electric System and upgrades must meet the appropriate requirements of the NEC Code (2008
Edition).
SFCS Response:
The complete replacement of the existing nurse call system with the specified new nurse call
system shall be installed to meet the 2008 NEC Code.
Reviewed by
Winston Matthews,P.E.
5119.07
Abernethy Laurels Nurse Call System Replacement
08/18/09
WAM