Loading...
HomeMy WebLinkAboutABEE0001.PDF.,~..02S~P L-N 7-£:J C?cr -0IA1:>e e A Abee Jr AlA,NCARB~rehi teet,P..DaIJa~;""';'@;""""'1Leem September 14,2009 Catawba County Building Inspection Department Attn:James Lamb P.O.Box 389 Newton,NC 28658. RE:Sweetwater Presbyterian Church Reference#PLN2009-00253 Dear James, This letter is in response to the Catawba County Building Inspection Review for the above referenced project.Please see the following comments. Hickory Zonin2 Review 1.See sheet A-2 and A-3 for details for new gate details for dumpster. 2.See sheet A-3 for Mechanical Fence Detail. 3.See sheet A-l.1 for landscape requirements. 4.All new utilities must be placed underground. CCPRReview 1.See sheet C-l for the correct structural wind speed. 2.See sheet C-l for revisions to this section. 3.See sheet C-I for revisions to this section. 4.See sheet C-l for revisions to this section. 5.This statement is no longer required. 6.See sheet C-l for occupant load calculations. 7.The folding wall shall have doors in it when it is installed in the future. 8.The range and the hood in the new kitchen will be residential equipment only. 9.See sheet A-7 for changes to text concerning wood posts. Hickory Fire Approved with notes. Hickory Public Utilities 1.See plumbing sheet P-l for revisions. 2.This issue has already been taken care of by The City of Hickory. Please feel free to contact me regarding any other issues. Sincerely, ~~Cathenne Bumgarner Abee Architect,PA 168 First AYe.,NW -P.O.Bel(1108,Riekol)',NC 18683 -818-311-1174,.-818-311-7356 f.-E-MIIII:ehItUJlllllll'ller@e ••••••.•...u_.