Loading...
HomeMy WebLinkAboutTARGET EROSION CONTROL PLAN LTR NCDENR.TIFALT NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Director and State Geologist Land Quality Section August 27, 2008 LETTER OF APPROVAL Mr. Herb Jeans, Director, Engineering, Construction, System Design Piedmont Natural Gas 4720 Piedmont Row Drive Charlotte, North Carolina 28233 RE: Project Name: Target Project Acres Approved: 4.2 Project ID: CATAW- 2008 -008 County: Catawba, NC Highway 10 River Basin: Catawba Submitted By: Piedmont Natural Gas Date Received by LQS: August 20, 2008 Plan Type: Revised Dear Mr. Jeans: Michael F. Easley, Governor William G. Ross Jr., Secretary SEP 2 3 2008 0 BUILDING SERVICES This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A- 61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance- oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 North Carolina General Statute 113A -51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 • Phone: 704 - 663 -1699 / FAX: 704 - 663 -6040 Letter of Approval Piedmont Natural Gas August 27, 2008 Page 2 of 2 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please be aware that your project will be covered by the enclosed NPDES General Stormwater Permit NCGO1000 (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed general permit. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, �') t J, It--, J Zahid S. Khan Regional Engineer Land Quality Section ZSK/ae Enclosures: Certificate of Approval NPDES Permit cc: S & ME, Inc. Inspection Department Surface Water Protection