Loading...
HomeMy WebLinkAboutBLD2009-00011 COPY OF WRITE UP.TIF,)Ipp,C)( aoo TOWN OF CATAWBA CONCENTRATED NEEDS CDBG PROGRAM Case No. Date October 30, 2008 For: - I \ Soft Y,a� Vi q I--, n � 5 �, ,, � VIJW . Property O er Rehab Address From: 3 KI Contractor Contractor's Address I, the undersigned contractor, having inspected the property and familiarized myself with the requirements of the "Work Write Up ", Specifications and Plans and understand the extent and character of the work to be done, propose to furnish all labor, materials and equipment necessary to accomplish succesWILI completion as requi ed b the "Work Write Up" of the property located at SeAuA eQet /A� �,�d Sf�a�: ALI QL for the sum of ($ i -) -) e OT) Dollars. I will commence the work on or before Month ay Year and will complete the work on or before f Month Day Year vfw-rlyct-�b ccr�44e, Company Name Authorize Sigq ture 0 - y a Phone and/or Pager # WORK WRITE -UP TOWN OF CATAWBA NORTHEAST CONCRENTRATED NEEDS CDBG PROGRAM PROPERTY OWNER: Isaiah Springs PROPERTY ADDRESS: 1077 th Avenue SE, Catawba, NC OWNER'S PHONE #: 826- 241 -3783 Note to contractors: Please submit your bids on this set of pages. All work shall be completed in accordance with the Work Contract, the N. C. State Building Code and this Work Write -Up. No substitutions for specified materials will be allowed unless approved in advance by the Community Development Staff. You are expected to call for inspections of specified items where called for in the Work Write -Up, as well as those required by the Building Inspections Department. The contractor shall be responsible for securing all permits. Upon completion, the contractor will be responsible for removing all debris from the premises. WORK TO BE PERFORMED 1. FOUNDATION COST a. Replace all existing foundation vents with new screened and closable foundation vents. New vents to be of the type that open and close automatically according to changes in temperature; TEMPVENT or equal. Install metal foundation vent wells at the location of all vents that are at, or near, grade level. 2. 4 ( r EXTERIOR WALLS a. Install new vinyl siding with insulating backer board on all exterior walls of house, using continuous corner post and proper trim and channels. Color and pattern to be selected by the owner from samples furnished by the contractor. Vinyl siding shall be "Alcoa ", "Bird ", "Certaineed ", or equal, and shall comply with the provisions of the National Bureau of Standards Voluntary Product Standard PS 55 -72. Siding shall have at least a 20 year guarantee. Siding shall have a minimum thickness of .035 ". Existing walls shall be made as even as possible by firring, blocking and cutting prior to application of siding. Siding shall be applied according to manufacturer's instructions. Install all necessary corners, angles, stops at windows, doors, etc., and all matching accessories to make a first -class job. Nailing should be approximately 16" intervals with aluminum nails. Installation includes the boxing in and covering of any exposed waste vent stacks with siding. 1 t ow L� WORK WRITE -UP: ISAIAH SPRINGS COST b. Install prefinished aluminum trim on all fascias, soffits, rakes, window sills and trim; carport ceiling, and all other miscellaneous exterior trim. Aluminum trim shall be "Alcoa ", "Alcan ", or equal and shall comply with the Specifications for Aluminum Soffit and Fascias, Architectural Aluminum Manufacturers Association, AAMA 1404.01. Color shall be selected by the owner and shall have a minimum guarantee of 20 years. Soffit material is to be of the ventilated type, and may be of vinyl. N( OTE: Remove horizontal wood soffits at front and rear of house to allow for attic ventilation, and install wooden stripping as required for the installation of new ventilated soffit material.) Installation includes all accessories. Use color matched acrylic caulking where needed for a neat, weather -tight 15 3a installation. 3. STORM DOORS a. SIDE DOOR (EXIT OF UTILITY ROOM): Install a new, 1 -1/4" thick, aluminum framed, mill finish storm door, complete with all hardware, mechanical closure, storm check, one screen and two glass panels. 4. FRONT PORCH a. Install new indoor /outdoor carpet on floor of front porch. Color to be selected by the owner from samples furnished by the owner. 3 C0 b. Install new welded wrought iron handrails on both sides of the existing steps. Step railings to match porch railings in style and detail. Comply with State Building Code requirements regarding opening sizes. C�c> 5. GUTTERING AND DOWNSPOUTS a. Install prefinished, seamless aluminum guttering on all fascias, with adequate downspouts for proper drainage. Guttering to be secured with spikes and sleeves set no more than 32" on centers. Color selection to be made by the owner from samples furnished by the contractor. "Pipe - off" the water flow from downspouts by installing a minimum of 10' of 4" flexible plastic drain line at each downspout. Drain line to be attached to downspouts with adapters designed for this purpose. Plastic drain lines are to be buried a minimum of 6" under grade for the length of piping and brought to surface again at end of run in a non - eroding release. 6. HVAC a. Have the existing oil fired furnace checked and serviced by a licensed heating contractor. Make all repairs and adjustments as required to insure that it is in a safe and operating condition. -2- WORK WRITE -UP: ISAIAH SPRINGS 7. MOISTURE AND THERMAL CONTROL (NOTE TO CONTRACTORS: An insulation certification card shall be furnished by the contractor and posted at a conspicuous location within the structure. This certification shall indicate the R- Value, minimum thickness, maximum coverage and minimum weight per square foot of the insulation installed for any of the following areas: walls, ceilings, and floor. Preferred locations for the certification card are the inside surface of a crawlspace access door, or stapled to a roof truss, rafter, or stiff knee within 5 feet of an attic access door.) COST a Remove the existing vapor barrier and any debris from crawl space. �'-- Install a new 6 mil. polyethylene vapor barrier on ground in crawl space area. Lap seams at least 6" and weight with brick or other non -wood material. (NOTE: Do not install vapor barrier until after termite treatment.) ../ 7r, b. Insulate all exterior walls with fire resistant, blown in place insulation. Neatly plug all holes made for the installation of insulation. (NOTE: If exterior walls are found to have existing insulation, this item will be deleted.) ; c. Install outside venting for clothes dryer, using code approved dryer vent hose with a dampered weather cap on the outside. — d. All water supply pipes in crawl space area shall be insulated with 1 /2" (minimum) preformed foam insulation or equivalent insulation material labeled for use on pipes and meeting minimum requirements, as in Federal Standards ASTM E84. Insulation shall be installed such that no I ' j - gaps exist and shall be securely fastened. 8. PLUMBING a. Replace all supply lines, starting at the point where main water line enters structure, with code approved materials. Fixture supply lines to be equipped with individual cut -off valves. b. Remove the existing kitchen sink and re- install same after new counter tops have been installed. Installation includes a new drain and trap assembly and new fixture supply lines with individual cut -off valves. - Existing faucet is to remain. NOTE: The design and installation of all new plumbing and fixtures shall comply with the provisions of the N. C. State Building Code. All plumbing work shall be performed by a licensed plumber. -3- WORK WRITE -UP: ISAIAH SPRINGS 9. ELECTRICAL a. Completely rewire the existing structure, including all receptacles, appliance outlets, lighting circuits and other existing circuits. Discontinue all existing wiring. Remove all existing wiring where practical. New wiring is to include the following items: b. Remove the existing meter, meter base, riser and weather head. Install a new meter, meter base, riser and weather head. Installation includes repair of all damage to wall surfaces after removing the existing meter. c. Install a new 200 amp. minimum circuit panel box with circuit breakers and a main disconnect. Discontinue and remove all existing circuit panel boxes and consolidate all new and existing circuits into the new panel box. Installation includes the repair of all damage to wall surfaces after removing existing panel boxes. d. Install GFCI (ground fault) receptacles at the location of all existing receptacles that would be required to have this type of breaker by current code. e. Install new three wire grounded duplex receptacles as required to provide at least one receptacle on each wall of all habitable rooms. Install AFCI (Arc - Fault) protection receptacles as required by current code. f. Install in each room a new lighting circuit, complete with light fixture and wall mounted switches. Light fixtures to be complete with glass diffusers and bulbs of maximum wattage allowed by fixture. Install three -way switches where deemed appropriate by the Community Development Staff. (NOTE: Existing fixtures may be left in place if equipped with glass diffusers, and in a safe condition.) g. Install UL listed smoke detectors, with battery back -up at all locations required by building code h. Install new lighting circuits, complete with exterior fixtures and bulbs, and wall mounted switches at all exits of house. i. Install an exhaust fan with wall mounted switch in Bath. Exhaust fan shall be ducted to the outside with necessary (lashings. Fan shall be Nutone or equal. j. Install a ceiling mounted exhaust fan with wall mounted switch in kitchen in area above range. Exhaust fan shall be ducted to the outside with necessary flashings. Fan shall be Nutone or equal. k. Install a circuit for electric range, complete with electric range receptacle, and new range cord if required. I. Install a new water heater circuit. m. Install a circuit for clothes washer. COST -4- WORK WRITE -UP: ISAIAH SPRINGS COST n. Install a circuit for electric clothes dryer, complete with dryer receptacle and new dryer cord if required. NOTE: The design, construction, installation, adjusting and labeling of all electrical equipment and accessories shall comply with the provisions of the N. C. State Building Code. All electrical work shall be performed by a licensed electrical contractor. '. 2LSC20 J PEST CONTROL a. Have dwelling treated for termites, using approved chemicals applied to the manufacturer's specifications. Exterminator shall provide the owner, through the Community Development Office, with a certificate of treatment and a one year warranty. Ane 11. EXTERIOR PAINTING NOTE: Remove all loose and scaling paint from exterior surfaces to be painted. Caulk around door and window frames to stop air infiltration. Renail any loose exterior trim. Prime any bare spots and new construction with oil based exterior primer. Do not apply exterior paint in damp or rainy weather. Do not apply exterior paint when temperature is below 50 degrees F. Do not use any lead based paints. Color selection to be made by the owner from samples furnished by the contractor. a. Paint the outside of exterior doors, and all other miscellaneous exterior woodwork not specifically mentioned with two coats of exterior latex enamel. Paint all wrought iron with two coats of exterior oil based paint formulated for use on metal, such as DeRusto. 12. LIVING ROOM a. PAINTING: Paint ceiling with two coats of flat interior latex paint. Paint all previously painted doors, jambs, and wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) -— 13. BEDROOM # 1 (FRONT CENTER ROOM) a. DOORS: Refit or re -hang the existing door in the opening between bedroom and hall as required to insure proper fit and operation. Install a— — new privacy type lockset on same door. -5- WORK WRITE -UP: ISAIAH SPRINGS b. PAINTING: Paint walls and ceiling with two coats off lat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) 14. BEDROOM # 2 (RIGHT FRONT ROOM) COST !� a. DOORS: Refit or re -hang the existing door in the opening between bedroom and hall as required to insure proper fit and operation. Install a_ new privacy type lockset on same door. b. PAINTING: Paint ceiling with two coats of flat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an�� acceptable finished paint job.) 15. BEDROOM # 3 (RIGHT REAR ROOM) a. DOORS: Refit or re -hang the existing door in the opening between bedroom and hall as required to insure proper fit and operation. Install a r757 new privacy type lockset on same door. _i`-' b. PAINTING: Paint walls and ceiling with two coats of flat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) 16. KITCHEN a. FLOOR: Repair damage to existing wood flooring, using new materials to match original. Install new 3 /8" plywood underlayment and new sheet vinyl floor covering. Vinyl floor covering shall be equivalent to, or better than the no -wax "Cambray" series manufactured by Armstrong, with a minimum thickness of .065" of printed construction. All vinyl floor covering shall have a mildew resistant rearguard protection and shall be scuff resistant. Pattern to be selected by the owner from samples furnished by the contractor. Install new shoe moulding around the perimeter of room at floor. Floor covering shall include the inside of any closets that can be accessed from the room. !u WORK WRITE -U P: ISAIAH SPRINGS COST b. KITCHEN CABINETS: Remove the existing counter topping and wooden tops from the existing kitchen base cabinets. Install a new wooden top of 3/4" AC exterior grade fir plywood. Install a new plastic laminate counter j� top and a full backsplash on the existing base unit. New plastic laminate to be "Formica" brand or equal. Refit all doors and drawers on the existing kitchen base and wall units as required to insure proper operation. Replace all damaged, missing or defective hardware with new to match original. c. PAINTING: Paint ceiling with two coats of flat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) 17. DEN a. FLOOR: Repair damage to existing wood flooring, using new materials to match original. Install new 318" plywood underlayment and new sheet vinyl floor covering. Vinyl floor covering shall be equivalent to, or better than the no -wax "Cambray° series manufactured by Armstrong, with a minimum thickness of .065" of printed construction. All vinyl floor covering shall have a mildew resistant rearguard protection and shall be scuff resistant. Pattern to be selected by the owner from samples furnished by the contractor. Install new shoe moulding around the perimeter of room at floor. Floor covering shall include the inside of any closets that can be accessed from the room. 1 ` _ b. PAINTING: Paint ceiling with two coats of flat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) 18. HALL a. FLOOR: Repair damage to existing wood flooring, using new materials to match original. Install new 3/8" plywood underlayment and new sheet vinyl floor covering. Vinyl floor covering shall be equivalent to, or better than the no -wax "Cambray" series manufactured by Armstrong, with a minimum thickness of .065" of printed construction. All vinyl floor covering shall have a mildew resistant rearguard protection and shall be scuff resistant. Pattern to be selected by the owner from samples furnished by the contractor. Install new shoe moulding around the perimeter of room at floor. Floor covering shall include the inside of any closets that _ can be accessed from the room. J -7- WORK WRITE -UP: ISAIAH SPRINGS COST b. PAINTING: Paint ceiling with two coats of flat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an �} , acceptable finished paint job.) s� vir k�� 19. BATH a. DOORS: Refit or re -hang the existing door in the opening between bath and hall as required to insure proper fit and operation. Install a new rl privacy type lockset on same door. b. PAINTING: Paint ceiling with two coats of flat interior latex paint. Paint all previously painted wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) 20. UTILITY a. WALLS: Patch, putty and sand smooth all areas of surface defects on the existing gypsum board as required to provide a smooth, paintable / surface. _-106 b. CEILING: Patch, putty and sand smooth all areas of surface defects on the existing gypsum board as required to provide a smooth, paintable surface. c. PAINTING: Paint walls and ceiling with two coats of flat interior latex paint. Paint doors, jambs, and all wood trim with two coats of interior latex enamel. Color selection to be made by the owner from samples furnished by the contractor. Do not use any lead based paints. (NOTE: It is the contractor's responsibility to determine if washing of surfaces or the use of a stain kill product is required prior to painting in order to arrive at an acceptable finished paint job.) $II JJ7 WORK WRITE -UP Isaiah Springs - (Daughter) 109 7th Avenue SE Catawba, NC NOTE: This drawing is intended to show general layout only. Contractor to verify all information at the job site. t� REAR DECK _ FRONT PORCH FLOOR PLAN (DO NOT SCALE) 1 Sq. Ft. KITCHEN SIDE UT1[/Yy PORCH DINING ROOM BATH o UTILITYO� 01 ® BEDROOM #3 BATH X4720 HALL CL. m BEDROOM # 1 LIVING ROOM BEDROOM #2 CL. CL. FRONT PORCH FLOOR PLAN (DO NOT SCALE) 1 Sq. Ft.