ECS CAROLINAS, LLP
-- -- - - - -i -- t -- - -- -
LLP Geote - h-- nica l •- Construc- - tion - Ma - at , ris — a] •Envir - al
cwieouNwa
October 22, 2008
Mr. Ben Loftis
GL Wilson Building Co.
190 Wilson Park Road
Statesville, North Carolina 28625
ECS, LLP Project 09:16153
Reference: Documentation of Retaining Wall Construction
Conover Police Department Addition
115 2 Ave NE
Conover, North Carolina
Dear Mr. Loftis:
ECS Carolinas, LLP. (ECS) has provided construction testing and monitoring services during
construction of the segmental retaining wall on the project site. The purpose of this letter is to
C summarize our activity and to document that the retaining walls were constructed according to
the applicable project specifications.
During construction of the retaining walls, ECS provided periodic monitoring of construction
and testing of foundation bearing capacity and compaction of reinforced backfill. We observed
installation of washed stone drainage material behind the segmental blocks. We observed and
documented geogrid types and lengths and general placement procedures for the geogrids.
Based on our monitoring and testing services during construction, the segmental wall for the
Conover Police Department addition project was constructed in general compliance with project
plans and specifications.
Please contact us if there are questions about our
Respectfully submitted,
ECS Carol7LP
l ti
7� )an Raulston
CMT Project Manager
\eJ
testing services.
Principal Engine&, O, N
NC License No. 01i��N3Jlf
�8
4811 Koger Boulevard • Greensboro, NC 27407 • (336) 856 -7150 • Fax (336) 856 -7160
ia L WILSON
- DING COMPANY
190 WILSON PARK ROAD! STATESVILLE, NC 28625 -8506
PHONE 704.872.2411 cnx 704.872.8281 Er iLbuild@glwilson.com
Commercial and Industrial Construction Since 1945
Conover Police Department
Retaining Wall Test Reports
RIA
ECS Carolinas, LLP
C o ECS Carolinas, LLP
4811 Koaer Bo
Greensboro, NC C I74 27407
LL P (336) 8 56-7150
0 (330)856 -7160
�Co�i7&Q�i!LlGa7l�f£
August 4, 2008
Global Project Solutions
16740 Birkdale Commons Parkway
Suite 210
Huntersville, NC 28078
LETTER OF TRANSMITTAL
RE: Conover Police Department Addition
ECS Job # 09:16153
Permits:
Location: 115 2nd Ave NE
Conover, NC
ATTN: Mr. Kent Couch
We are enclosing:
X Materials Engineering Division Reports
X For your use
X As requested
CC: G.L. Wilson Building Company - Ben Loftis
ENCL:
O Field Report # 12 07/31/2008 Soil Density
__J
ECS Carolinas, LLP
4811 Koger Boulevard
Greensboro, NC 27407
® ® (336)856.7150
Wf' (336)856.7160
r - - - 1
Project Conover Police Department Addition
Location Conover, NC
Client Global Project Solutions - Kent Couch
Contractor C.L. Wilson Building Company - Ben LoBis
Remarks Soil Density
Trip Charges` Tolls/Parking' Mileage'
Chargeable Items 1 - Nuclear Gauge Rental
Project No.
09:16153
Report No.
12
Day 8 Date
Thursday 07/3112008
Weather
SOe/ Sunny
On-Site Time
1.25
Lab Time
0150
Travel Time'
2.00
Total
3.75
Re Obs.Time
0.00
5 Time of Arrival Departure
09:30A 10:45A
• Travel time and mileage will be billed in accordance with the contract.
Summary of Services Performed (field test date, locatlons, elevations a depths am estimates) & Individuals Contacted.
The undersigned arrived on site, as requested, to observe the placement and compaction oi'soiIs
for retaining wall at station 0+00 to end of wall.
® Utilizing the Nuclear Method (ASTM D -2922) to check the compaction of soils; test results
indicated that the compacted material, at the areas and elevations tested, met the project
requirements of (95 %) of the maximum dry density as obtained in our laboratory using the
Standard proctor method (ASTM D -698).
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located off of the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
Steven A. Cates
PM/Construction Mkting
By Teddy W. Thomas, — Engineering Technician
:r+
177659
1
O
wFr.P�PSn..C�:r^s.�
ECS CAROLINAS, LLP
Field Compaction Summary,
Project No: 16153 Project Name: Conover Police Department Addition
Client:
Contractor:
Technician:
Global Project Solutions
Test Method
G.L. Wilson Building Company
Nuclear Gauge No.6
Make
Density Std
1990
Te ddy W. Thomas
Model
Moisture Std
616
Ser. No.
Moisture
Page 1
Date: 07/31/08
Sample:! Descnptlon: Rock Screenings Proctor Method: Standard Proctor Uncorrected Max. Density: 126.60 Uncorrected Opt. MC: 9.50
Co,mted
Cormt<d
Test Data
wet
Dry
Moisture
Percent
"Amuntrn
nPmm�n,
Test
Test
Probe
Station I
Lift /
%
D"
Moisture
Dens �,
Dens M
Content
Comp.
P
p / F
Comments
No.
Mode
Depth
Location
Elev
Oversize
Dcnvty
Consent
(t )
Orr)
iRn
i
1
DT
0
sta. 0 +30, 4 It behind face of wall
5
0.00
126.60
9.50
130.2
1211
7.5
95.7
P
2
DT
0
sla. 0 +80, 5 ft behind face of wall
5
0.00
126.60
9.50
129.6
124.1
4.4
98.0
P
3
DT
0
sta. 1 +30, 3 ft behind face of wall
5
1 0.00
126.60
9.50
123.9
120.3
3.0
95.0
P
Test Mode: DT = Direct Transmission BS = Back Scatter
W075373(
C -' ECS Carolinas, LLP
4811 Koger aou levard
Greensboro,NC 27407
MLLP {336)856 -7150
(336) 856.7(60
S`.s�agCtD6.fiCacil�
August 6, 2008
Global Project Solutions
16740 Birkdale Commons Parkway
Suite 210
Huntersville, NC 28078
ATTN: Mr. Kent Couch
LETTER OF TRANSMITTAL
RE: Conover Police Department Addition
ECS Job 4 09:16153
Permits:
Location: 115 2nd Ave NE
Conover, NC
We are enclosing:
X_ Materials Engineering Division Reports
X For your use
_ Cx As requested
CC: G.L Wilson Building Company - Ben "ltis
0
ENCL:
Field Report # 15 08/04/2008 Soil Density
Field Report 4 16 08/05/2008 Soil Density
col
' ECS Carolinas, LLP
in 4811 Koger Boulevard
(336)8 27467 FIELD REPORT
s {338 }868.7950
LLP {336}866.7160
Project No. 09:16153
Report No. 15
Project Conover Police Department Addition Day & Date Monday 08/64/2008
Location Conover, NC Weather 80e/ Sunny
Client Global Project Solutions - Kent Couch On -Site Time 1.50
Contractor G.L Wilson Building Company -Ben Loftis Lab Time 0.25 Travel Time' 1.25
Total 3.00
Remarks Soil Density
Re Obs.Time 0.00
Trip Charges' TBIWParking' Mileage' 5 Time of Arrival Departure
Chargeable Items 1 - Nuclear Gauge Rental OLOOP 02:30P
' Tmvcl timc and mileaee will be billed in acoordnnue with the contract.
Summary of Services Performed (field test data. locations, elevations S depths am eadmatn) S Individuals Contacted.
The undersigned arrived on site, as requested, to observe the placement and compaction of soils
for retaining wall.
Utilizing the Nuclear Method (ASTM D -2922) to check the compaction of soils; test results
indicated that the compacted material, at the areas and elevations tested, met the project
requirements of (95 %) of the maximum dry density as obtained in our laboratory using the
Standard Proctor Method (ASTM D -698).
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located offof the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
D. Haskins, P.E.
Engineer
Steven A. Cates
PM /Construction Mkting
By Teddy W. Thomas, — Engineering Technician 1800
117991
P'. "'Vo
6505 Iname�ianal Dmc, Suite 107 Project Name: (v , 70UC1 IBO &-z I/e
G1CSnsbcm, Norm C3mboa 27409 Project Location: Lo 14.,; b a L O -
�� Phone: (376) 956 -7150 Work Order No.: / `•I O
Faa: p36) 3564160 Date' �- 6
SEGMENTAL BLOCK WALL CHECK LIST
Segmental Block Wall Type JIyf5A- Gock p
Plans Sealed Date 2)o b4 Wall Designer. Y3ob�w l7 r7/n CS
Observed from ST C, t.QQ to STA I I- ?O Number of Density T sts:
Observed at Elevation 4 L G to Elevati f0 -1'7, N
C
Geogrid Type: S „rT rn 5 F 3 „S -
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
STA: O t 00
to STA: 1 4'70
Width: (0 (ft)
at Elevation: 16 47. N (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
STA:
to STA:
Width: (ft)
at Elevation: (ft)
Washed Stone Thickness Placed Immediately Behind the Wall: 1
Foundations Including the Footprint of the Retained Soils Have
Been Evaluated Every 50' Wlth HA/DCP Tests:
Placement of Wall Drainage Has Been Observed: Ye 5
Through Wall Drainage Has Been Observed:
Geogrid Has Been Placed According to Project Drawings: - �Ye°5
30
"Z
LL'
ECS CAROLINAS, LLP
Field Compaction Summary,
Project No: 16153 Project Name: Conover Police Department Addition
Client:
Contractor:
Technician:
Global Project Solutions
Test Method
G.L. Wilson Building Company
Nuclear Gauge No.6
Make
Density Std
2011
Teddy W. Thomas
Model
Moisture Std
683
Ser. No.
Page 1
Date. 08 104/08
Sample .1 Description. Rock Screening Proctor Method: Standard Proctor Uncorrected Max. Density: 126.60 Uncorrected Opt. MC: 9.60
Conn a z
Com cd
Test Data
Maximum
optimum
wet
D7
Moisture
Percent
Test
Test
Probe
Station /
Lift /
%
Dry
Mnistwe
Density
Density
Content
Comp.
P) F
Comments
No.
Mods
Depth
Location
Elev
Oversize
Density
Content
(pcQ
(pc0
(9'e)
( %)
(�
(%)
1
DT
6
sta. 0+10, 3 ft behind face of wall
-0
0.00
1126.60
9.60
130.4
1124.0
5.2
97.9
P
2
OT
6
sta. 0 +70, 5 ft behind face of wall.
-0
0.00
126.60
9.60
1282
121.6
5.4
96.1
P
3
DT
6
sta. 1 +30, 4 It behind face of wall
-0
0.00
1126,60
9.60
130.1
1123.8
5.1
97.8
P
Test Mode: DT = Direct Transmission BS = Back Scatter
WO 15400;
ECS Carolinas, LLP
4811 Koller Boulevard
(33613 C 27!07
64160 FIELD REPORT
(3761 H56.7160
aarrr (336) 856 -7160
04 Project No 09:16153
Report No. 16
Project Conover Police Department Addition Day & Date Tuesday 08/05/2008
Location Conover, NC Weather 85 Sunny
Client Global Project Solutions - Kent Couch On -Site Time 1.75
Contractor G.L. Wilson Building Company- Ben Loftis Lab Time 0.50
Travel Time' 3.25
Total 5,50
Remarks Soil Density
Re Obs.Time 0.00
Trip Charges' Tolls'Parking' Mileage' 5 Time of Arrival Departure
Chargeable Items 1 - Nuclear Gauge Rental 11:45A 01:30P
Tra,cl time and mileage will be billed in accordance with the contract.
Summary of services Performed (field Bast data, locations, elevations & depths are estimates) & IndlVlAaels Contacted.
The undersigned arrived on site, as requested, to observe the placement and compaction of soils
for retaining wall.
C Utilizing the Nuclear Method (ASTM D -2922) to check the compaction of soils; test results
indicated that the compacted material, at the areas and elevations tested, met the project
requirements of (95 %) of the maximum dry density as obtained in our laboratory using the
Standard Proctor Method (ASTM D -698),
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located off of the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
S
1�r
7 - 4.
!d
Steven A. Cates
PM/Construction Mkting
By Teddp °W. "Ttmmas, — Engineering Technician
1800
rlbcz3
Pr6i t 1 S 3
6909 Snmmsdonsl Erin, Sure 103
Project Name �aro� {� nc5(r a t pf ,
M } - 0,"sooro, Morro C mlins 7709 Project Location: _ Lo n , o 6 a
a ?bns: (316) ISO 00 Work Order No.: H pgf
F= (336) 656 -7560 Date* %
SEGMENTAL BLOCK WALL CHECK LIST
C
Segmental Block Wall Type Drre Loc (t
Plans Sealed Date .yo (3 Wall Designer: f�
Observed from ST a i.00 to STA 1 r ?O Number of Density ests:
Observed at Elevation R _ ` to Elevati ip q;3 g
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
Geogrid Type:
STA: O f OZS
Width: 7 fR)
STA:
Width: (ft)
STA:
Width: (ft);
STA:
Width: (ft)
STA:
Width: (ft)
STA:
Width: (ft)
STA:
Width: (ft)
STA:
Width: (ft)
STA:
Width: (({)
STA:
Width: (ft)
STA:
Width: (ft)
STA:
Width: (ft)
STA:
Width: (ft)
to STA: h
at Elevation: IO i18 (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
to STA:
at Elevation: _ (ft)
to STA:
at Elevation:
to STA:
at Elevation: (ft)
to STA:
at Elevation: (ft)
Geogrid Type:
Washed Stone Thickness Placed Immediately Behind the Wall: _ 1'
Foundations Including the Footprint of the Retained Soils Have
Been Evaluated Every 50' With HA/DCP Tests:
Placement of Wall Drainage Has Been Observed: _
Through Wall Drainage Has Been Observed:
Geogrid Has Been Placed According to Project Drawings: 4oS
C
Geogrid Type: 4infYefl 5 f= 3 5-
ECS CAROLINAS, LLP
Field Compaction Summary,
Project No: 16153 Project Name: Conover Police Department Addition
Client:
Contractor:
Technician:
Global Project Solutions
Test Method
G.L. Wilson Building Company
Nuclear Gauge No.6
Make
I Density std
2037
Teddy W. Thomas
Model
IMoistureStd
680
Ser. No.
Moisture
Page 1
Date: 08/05/08
Sample:NA Description: Rock Screenings Proctor Method: Standard Proctor Uncorrected Max. Density: 126.60 Uncorrected Opt. MC: 9.60
C c"I=
Correcad
Test Data
Wet
Dry
Moisture
Percent
Maximum
Optimum
Test
Test
Probe
Station /
Lift /
%
Dn•
Moisture
Density
Density
content
Comp.
P / F
Comments
No.
Mode
Depm
Location
Elev
Oversize
Dci, v
C1n1ent
00
00
C /•)
(%)
an
lxt
1
DT
6
sta. 0 +15, 6 ft behind face of wall
-2
0.00
126.60
9.60
126.7
122.2
3.7
96.5
P
2
OT
6
Ste. 0 +80, 4 ft behind face of wall
-2
0.00
1126.60
9.60
132.2
126.5
4.5
99.9
P
3
DT
6
sta. 1 +50, 5 ft behind face of wall
-2
0.00
126.60
9.60
129.9
123.4
5.2
97.5
P
Test Mode: DT = Direct Transmission BS = Back Scatter
WO: 15406'