Loading...
HomeMy WebLinkAboutBLD2007-02241 RE MECH EQUIP.TIF4-�S-e Q Armin Wallner From: T. W. Temple [ twtemple @carolinaconstructiongc .com] Sent: Thursday, February 28, 2008 1:58 PM To: Armin Wallner Cc: Phil Bunton Subject: Cougar Custom Cycles (Permit No. BLD 2007 - 02241) Attachments: 145104.pdf Importance: High RE: COUGAR CUSTOM CYCLES - BUILDING PERMIT NO. BLD 2007 - 02 241 See attached letter certifying approval of relocation of mechanical equipment froin the floor to t he space over toilet. Thank you. T. W. Temple Vice President Carolina Construction Company PO Box To58 Hickory, NC 28603 Phone: 828.256.4343 extension 3 Facsimile: 8 2 8 .25 6 .434 6 Email: twtemtileOcarolinaconstructionQc .com Website: www.carolinaconstructiongc.com Feb 28 08 01:38p CAROLINA CONSTRUCTION (828)256 -4346 p.2 Feb 28 08 01:09p Owner 828 -327 -3188 GLEN WALKER P. E. 323 25 AVENUE NW HICKORY N C 28601 CIVIL ENGINEERING STRUCCURALENGINEERING PHONE 6283814480 SITE PLANNING FAX 828 324 8662 CONSTRUCTION CONSULTANT 2/28/0 8 CAROLINA CONSTRUCTION COMPANY P.O. BOX 1056 HICKORY, N C 28603 PE: COUGAR CUSTOM CYCLES 1043 LENOIR RI•iYNE BLVD. S E HICKORY, N C 28602 MR. PHIL BUNTOK THANK YOU, I HAVE MADE AN INSPFCTION OF THE REFERENCED PROJECT AND THE RELOCATION OF THE MECHANICAL EQUIPMENT FROM THE FLOOR TO THE SPACE OVER THE TOILET AREA IS APPROVED. IF YOU SHOULD HAVE ANY QUESTIONS PLEASE GIVE ME A CALL. 15i 1111!!} � E�! E. 1 !l111111 {LI1 P.1 GLEI\ WALKER, P.E. F 28 08 01:38p CAROLINA CONSTRUCTION (828)256 -4346 p.1 f a c s i m i l e t r a n s m i s s i o n CAROLINA CONSTRUCTION COMPANY P. O. Box ro58 Hickory, N.C. 286o3 3882 Springs Road (z86o.) phone 8z8.z56.4343 facsimile 8z8.z56.4346 To: Catawba County Building Inspections Dept. Attention: Armin Allner Phone: 828-465-8454/ 828.217.1091 Facsimile: 8 2 8 .4 6 5.8375 We are transmitting usheets including this cover sheet. Date: z8 -Fe"S Project No. Project: Distribution: RE: COUGAR CUSTOM CYCLES - BUILDING PERMIT NO. BL132o07 -02z41 Per our phone discussion today @ 1:30 pm: See attached letter from Engineer certifying approval of relocation of mechanical equipment from the floor I to the space over the toilet. I will forward copy of this document to you via email also. you. If paow�eJ ilG r101 JJ IlOrC.y � notify YJ JL MK• Signed Todd W. Temple, Vice President (97)