Loading...
HomeMy WebLinkAboutBLD2006-00757 TEMP HEAT.TIF$ Catawba County Building Services Division PO Box 389, Newton, NC 28658 Permit Center 828- 465 -8399 Plan Review 828 - 466 -5130 Newton Fax 828 - 465 -8375 Hickory Fax 828- 322 -6814 SERVICE AGREEMENT TEMPORARY HEAT NOTE: Each separate meter to be connected is considered a separate request and subject to a separate fee. Permit # )�- 00 c? C: '7 S 7 Job Title PIN # In an effort to assist contractors in completing construction projects, this office will implement the following policy. The utilization of permanently installed heating equipment to maintain environmental conditions necessary to facilitate the installation of environmentally sensitive materials, or finishes in accordance with manufacturers instructions is permitted by the North Carolina State Administration and Enforcement Code with the following local requirements. The owner, general contractor, and mechanical contractor must sign this request form for temporary utility connections. The form must be filled out completely. The following requirements will also apply: 1. All heating units to be placed in operation shall have the following items inspected for compliance if applicable. a. Vent system (Products of combustion) b. Appropriate amount of combustion air is provided. c. Gas lines shall be pressure tested and inspected. d. Water lines shall be pressure tested and inspected if geothermal or coil supplied by a hot water heater. e. Condensate traps and lines in place and inspected. f. Electrical circuits installed with appropriate disconnect, over - current, equipment grounding, conductors and raceways. g. Refrigeration lines shall be inspected with appropriate pressure certification tests. h. All gas tubing shall be labeled per gas code prior to temporary heat inspection. i. Approved temporary electrical power is a prerequisite for temporary heat. (This can be scheduled simultaneously with temporary electrical.) 2. No occupancy of any kind (persons, furnishings, etc.) shall be allowed during this period, without prior approval of the Code Enforcement Official. 3. The use of the system before final inspection is anticipated to be days or less. If utility connection remains in use beyond 30 days general contractor will be billed monthly per County Fee Schedule. 4. If there is any violation of this agreement, this service shall be disconnected without prior notice to the participants. This shall be done without any obligation of responsibility on the part of the Code Official or Catawba County. 5. All processing fees are applicable as set forth in the Catawba County fee schedule. I have read and agree to this procedure and guidelines as set forth by Catawba County and will abide by the conditions and qualifications under which it is issued. I further agree that failure to comply with the procedure may result in disconnection of gas, revocation of permit, and/or the refusal to consider further requests for temporary gas. I b= rf d, rS (,—c /l 'J do hereby apply for temporary use of the permanent dNe- c; S heating (Printed Name of General Contractor) (size/type system) system located at 41 t( n e,- S -ef 2 ei - De- (Address of site) (Building number) (Unit number) I au orize billin f all renewals, if required to the following active Catawba County billing account number 6. Z Owner /General Contractor signature te � Permit Specialist or Notary Please Print Name R 6i L ot,; e i n; ` j r- // 52 Title � r ` s � � � of HV 7 HVAC G Please Print Name 1 July, 2004 hereby apply for temporary use of the permanent utility service identified above. 1QL1 1 -7(0'7 Date Permit Specialist or Notary Title