Project #
Task # : 44 e� . i-A'"
Project Name:
Date Needed:
Location:
., Requested by (date):
Order Taken By: Type of Work Requested:
Project Contact (#) :
On Site Time: to
Total Time: Regular: Overtime:
A Contractor: 1114* - r'
♦'
Travel: to
Mileage:
Limits of Work NEqE%4UM INFORMATION REQUIRED)
— Foundations (Brief Summary and attich A & P Sheet - original and sketch)
— Proofrolling (Attach proofrolling sheet - original)
Concrete
Field Density Testing (Brief summary below and sketch)
Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
ou- gf�` L 14
f'�LGJ t5�;V,- r
Vy,
t-1 A j; C. r::., vyrrtf
F tJ C-
Circle Appropriate Weather: Clear Cloudy Showers Lt. Rain Heavy Rain Other:
Air Temperature:
Project Manager._ Site Rep.:
Techniciam"" Date: Date:
UP Code Units
180040 — T ch arges
lgolw — Mileage
.174822 Supplies
Cost Center: Page �,-- of
Project Manager:
Time Needed:
O MACTEC
MACTEC Engineering and Consulting, Inc.
2801 Yorkmont Road, Suite 100
Charlotte, NC 28208
(704) 357 -8600
Project
Task #
Project Name:
Date Needed:
Location:
Order Taken By:
Project Contact ( #) :
On Site Time: to
Total Time: Regular: b C Overtime:
Travel: to
Mileage:
Limits of Work (MINIMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet - original and sketch)
Proofrolling (Attach proofrolling sheet - original)
Concrete
Field Density Testing (Brief summary below and sketch)
Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
4
Circle Appropriate Weather: Clear,, Cloudy Showers Lt. Rain Heavy Rain
Air Temperature:
Project Manager: Date. Site Rep.
Technician: Date:
UP Code Units
180040 Trip Charges
180100 Mileage
174822 Supplies
Cost Center: Page of
Project Manager:
Time Needed:
Requested by (date):
Type of Work Requested:
Contractor:
Other:
Date:
f MACTEC
MACTEC Engineering and Consulting, Inc.
2801 Yorkmont Road, Suite 100
Charlotte, NC 28208
(704) 357-8600
Project # -7'
Task # :
Project Name: i—JAI I--
Date Needed:
4k-
Location: q
Order Taken By:
UP Code
Units
180040 —
Trip Charges
180100_
Mileage
174822 _
Supplies
Cost Center:
Page_ of
Project Manager:
Time Needed:
Type of Work Requested:
Requested by (date):
�--Vl �' " " i - I
Project Contact (#) : Contractor: lG
On Site Time: to Travel: to
Total Time: Regular: 1, �o Overtime: Mileage:
Limits of Work (MINIMUM INFORMATION REQUIRED)
— Foundations (Brief Summary and attach A & P Sheet - original and sketch)
— Proofrolling (Attach proofrolling sheet - original)
— Concrete
— Field Density Testing (Brief summary below and sketch)
— Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
— Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
z
Circle Appropriate Weather: Clear Cloudy,/ Showers Lt. Rain Heavy Rain Other:
Air Temperature-
Project Manager Date: e-- Site Rep.
Technician: Date:
Project Name: s;;�� .� ,-r �.� Jul Project Manager:
Date Needed: Time Needed:
Location: Requested by (date):
Order Taken By: Type of Work Requested:
Project Contact ( #) :
On Site Time: to
Total Time: Regular: ,� Overtime:
Contractor:
Travel: to
Mileage:
Limits of Work (MINIMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet - original and sketch)
Proofrolling (Attach proofrolling sheet - original)
Concrete
Field Density Testing (Brief summary below and sketch)
Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAII,Y OBSERVATIONS AND TESTING
Circle Appropriate Weather: Clear Cloudy Showers Lt. Rain Heavy Rain Other:
Air Temperature: f ,
Project Manager: - Date: Site Re
Technician r /�;.. Date: K -27 / {.':> P.:
Date:
OM ACTEC
UP Code
r
Units
180040
-
Trip Charges
MACTEC Engineering and Consulting, Inc.
180100
Mileage
2801 Yorkmont Road, Suite 100
Charlotte, NC 28208
174822
Supplies
(704) 357 -8600
Project #
: 7 ,7 7
Cost Center:
Page of
Task # :
Project Name: s;;�� .� ,-r �.� Jul Project Manager:
Date Needed: Time Needed:
Location: Requested by (date):
Order Taken By: Type of Work Requested:
Project Contact ( #) :
On Site Time: to
Total Time: Regular: ,� Overtime:
Contractor:
Travel: to
Mileage:
Limits of Work (MINIMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet - original and sketch)
Proofrolling (Attach proofrolling sheet - original)
Concrete
Field Density Testing (Brief summary below and sketch)
Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAII,Y OBSERVATIONS AND TESTING
Circle Appropriate Weather: Clear Cloudy Showers Lt. Rain Heavy Rain Other:
Air Temperature: f ,
Project Manager: - Date: Site Re
Technician r /�;.. Date: K -27 / {.':> P.:
Date:
O MACTEC
MACTEC Engineering and Consulting, Inc.
2801 Yorkmont Road, Suite 100
Charlotte, NC 28208
(704) 357 -8600
Project #
Task #
Project Name:
Date Needed:
Locati
w w r... -..- , - . .. .... - . . .
UP Code Units
180040 Trip ages
180100 Mileage
174822 Supplies
Cost Center: Page of
Project Manager:
Time Needed:
on. , -$x. % ; . X-'_ .G�- ! .> I Requested by (date):
Order Taken By:
Project Contact ( #) :
On Site Time: to
Total Time: Regular: 4 t G C� Overtime:
Travel: to
Mileage:
Limits of Work (MINIMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet - original and sketch)
Proofrolling (Attach proofrolling sheet - original)
Concrete
Field Density Testing (Brief summary below and sketch)
Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
i
Circle Appropriate Weather: Clear Cloudy Showers Lt. Rain Heavy Rain
Air Temperature:
Project Manager-
er. Date: Site Re .
Technician: �f P
f Date:
Type of Work Requested: <' ; t L'7 L-- I �11 I
Contractor:
Other:
Date: