HomeMy WebLinkAboutBLD2005-00880 MACTEC RPT FOR DEC 05.TIFMACT
LlP Code Units
li mo Tri
MACTEC Engineering and Consulting, Inc.
:1
X80100 . Mileage !
2801 Yorkmont Road, S4116 b0
174$22
Charlotte, NC 28208
•._,
Supplies
(70� 357 -8600
Project #
Cost Center: Page of .
Task #
ProjectNattfe:, �"itff...
Project Manager: 1
Date Needed:+ x
Time Needed:
Location: •-
Requested by (date):
Order Taken By: Type of Work Requested:
II�
Project Contact ( #) : Contractor.
I
On Site Time: to _
Travel• to
Total Time: Regular: Overtime:
Miler age:
Limits of Work (MINIMIUM INFORMATION REQUIRED)
Foundations (Brief Summary. and attach A &.P Sheet - originaY:and; sketch)
Proofrolling (Attach proofr lfing sheet - original)
Concrete
Field Density Testing (Brief stimmary,,below and sketch)
Structural Steel (NDT, RT, it-Yi uil Rolt Insp) '
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESIJNG
?.I
Circle Appropriate Weather: Clear Cloudy Showers ; Lt. Rain
Heavy Rain Other:
Air Temperature
Project Manager Date:
Site Rep.:
Technician �t `Date: "' ,7.
�7
Date:
PX07FM' F7 F 3i0ow .77ALESIyETsT
Pink FIEF itl
UP Code Units
MACTE
ijJ
.180040 Trip Charges
I
MACTEC_.Engineering and Consulting, Inc. 78100 Mileage
1
2801 Yo* ont Road, suite 100 r� 114822
Charlotte;
= 28208 ; Su lie
PP =;
(704) 361 -8500 �.
Project # Cost Center: Page of
Task
�
Project Name:
Project Manager:
1
Date Needed
a
-- - , -- _ Time Needed:
i
Location: „ "'a4 r Requested by (date)
Order Taken By: _ Type bf Work Requested: M l
- r� M
Project Corittict ( #) Contractor• s . h
On Site Time: to ' k TrdveL' to
Total Time: Regular: Ovefime: Mileage:
Limits of Work (MINIMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet - origmat and sketch)
Proofrolling (Attach.proofiolling sheet - oriSjud)
Concrete
Field Density Testing (Brief summary below and sketch)
-
Structural Steel (NDT, RT, UT Visual Bolt Insp:)
3
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TC5 'ING .
C _' y l«�` / �' • " • � '�" � l..r:�...... �- i l . t' {..� ^^`� ��i' 13 S ws` f""`" � �..+} �''.� .
( � ln
I. •
1a�AR��� L4 f.i� 1 4
—_ N r - � 1 • `C1
f�
k
Circle Appropriate Weather ,Clear Cloudy Showers Lt. Rain 'Heavy Rain Other:
Air Temperature
Project Manager + ,.r Date: ite Rep.:
Technician Datey' Date:
r 3
- �t01gClFj?IlE Yin l '- l! M AEET : Pink - FIEGb
ki