HomeMy WebLinkAboutB4-1288 SOIL REPORTS 8-6-04.PDFMAk Alk MATTHEWS
C: CONSTRUCTION CO., INC.
CORPORATE OFFICE:
210 First Avenue South -Conover, North Carolina 28613 (828)464-7325 FAX:(828)465-6747
CHARLOTTE OFFICE:
Lakepoint Corporate Center Two 2359 Perimeter Pointe Parrkway, Suite 175 — Charlotte, North Carolina 28208
PHONE: (704) 357-6095 FAX. (704) 357-0590
TO: Catawba County Building Inspections
PO Box 389
Newton, NC 28658
(828) 465-83"
DATE: 8/6/04
REGARDING: Hickory Metro Convention Center
Soil Reports
We are (x) enclosing ( ) under separate cover to you the following:
For: Your comments
Your Approval
As requested
As approved
Approved as noted
For re -submittal
fXJ Your records
With our comments as follows:
LFA
BY: Charles E Canrobert eee_ DATE: 8/6/04
SINCE
FROEHLING & ROBERTSON, INC..
GEOTECHNICAL # ENVIRONMENTAL * MATERIALS
ENGINEERS * LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
1881 " 910 TATE BOULEVARD, SE/SUITE 101/HICKORY, NC 28601
TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWWFANDR.COM
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc,
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/02/04
Technician-, Robert George
The F&R technician arrived on -site at the request of the client to perform 'spot-check' in -place
density tests using the nuclear gauge on soils previously placed as fill in the building pad,
The F&R technician performed three density tests at random areas of the building pad. One soil
sample was collected and transported to the F&R laboratory for Standard Proctor testing. The
results of Proctor P-1 are attached. Two soil samples were also collected and transported to the
F&R laboratory for moisture verification testing.
The equipment operator with Long Grading was informed that the final test results would be
reported on July 6, 2004 after the laboratory testing is finalized.
Note: The three in -place density tests did not meet 95% compaction, but were retested on July 6,
2004 with acceptable results.
Please note that the above represent spot tests only at the locations noted. Fulltime visu
observation of materials placed or methods of placement should not be inferred. I
Respectfully Submitted,
FROEHLING & ROBERTSON, INC,
('4.) . Mich el W. Sloan, P.F.
Branch Manager
HEADQUARTERS: 3015 DUMBARTON ROAD - BOX 27524 - RICH ND, VA 23261-7524
rELEPHONE (804) 22701 - FAX (804) 264-1202 - WWW,FandRxom
Project:
Client: MATTHEWS CONSTRUCTION COMPANY, INC,
Record No.: F77-035T
Test
Test
Field
Elev. Moisture
Field Dry
Density
Percent of Maximum Field Test
Dry Density
Proctor
No.
Location
I
(FT.) Content (94o)
(pcf)
Type
No.
BUILDING PAD
ACT_SPEC.
1
NORTHWEST CORNER OF PAD
-2.5 .1 ,5
109.5
—
94.6 95
NO
P-1
2
WEST SIDE OF PAD
-1.5 --12,3
106.7
92.2 --65— NG
P-1
3
SOUTHWEST CORNER OF FILL AREA
_.5 *12,2
108,3
916 95
NG
P-1
Proctor No, Max. Dry —Optimum Soil Lab Test
Remarks:
Density (pcf) Moisture Class. Type
P-1
115.7 10-1 _SM STD
'OVEN -DRIED MOISTURES,
So - Sand Cone (ASTM D1556)
NG - Nuclear Gauge
(ASTM 02922 & 03017)
Froehling & Robertson, Inc.
DC - Drive Cylinder (ASTM D2937)
Technician, ROBERT GEORGE
STD. - (ASTM D698)
1400. - (ASTM D1557)
I
PLEASE NOTE
The above tests represent spot tests only
at the locations noted. Fulltime
visual observation of mat Its placed
or methods of placement should not be
inferred.
TEST RESULTS
Maximum dry density = 115.7 pcf
Optimum moisture= I O. I %
Project No. F77-035T Client: Matthews Construction
Project: Hickory Metro Center Expansion
Source: Off -Site Borrow Sample
UUMFAU I IU TEST REPORT
FROEH"LING & R"10BERTSU"N. INIC.
SINCE
FROEHLING & ROBERTSON, INC.
A GEOTECHNICAL * ENVIRONMENIAL * MATERIALS
lt ENGINEERS * LABORATORIES
"OVER ONE HUNDRED YE4RS OF SERVICE"
o0910 TATE BOULEVARD, SE/SUITE 101/HICKORY, NC 286
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW,FANDR.COM I
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc,
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/06/04
Technician: Eldridge Adkins
The F&R technician arrived on -site at the request of the client to perform 'spot-check' in-pla
density tests using the nuclear gauge on soils previously placed in the building pad. i
The F&R technician performed three density retests at the locations that failed to me
compaction on July 2, 2004 after the area was re -compacted. Based on the test results, 95
compaction had now been achieved. The F&R technician also performed two density tests
the lift placed at the north end of the building pad with results indicating that 95% compaction h
been achieved. I
Mr. Long, Long Grading, telephoned F&R later in the day to request that the F&R technician
return to the site for further testing later in the day,
Please note that the above represent spot tests only at the locations noted, Fulltime visual
observation of materials placed or methods of placement should not be inferred.
Respectfully Submitted,
FROEHLING & ROBERTSON, INC.
fi z 6J .
Michael W. Sloan, P.E.
Branch Manager
HEADOUARTERS: 3015 DUMBARTON ROAD - BOX 27524 - RICHMOND. VA 23261-7524
TELEPHONE (804) 264-2701 - FAX (804) 264-1202 - www,FandFLcom
BRANCHES: ASHEVILLE, NG - BALTIMORE, MD - CHARLOTTE, NO - CHESAPEArE, VA
('Pn7PT VA . CAVCTTCIIIl I C - . - - 1 , r
Project:
Client:
I
FIELD DENSITY SUMMARY SHEETS
HICKORY METRO CENTER Date: 07/06/04
MATTHEWS CONSTRUCTION COMPANY, INC. Record No.: F77-035T
Field Field Dry Percent of Maximum Field Test Proctor
Test
Test
Elev,
Moisture
Density
Density
enD,y
Dry Density
DensityType
Type
No.
No,
Location
(FT)
Content
(Pcf)
(p 'f C
BUILDING PAD
ACT.
SPEC,
k_1
RE_Tff§TNOff_HWffS_T —CORNER OFPAD2.5
-9-9
116�O
100�3
95
NO
L_NG
P-1
_R2_
RETEST -WEST SIDE OF PAD
100.9
1114�8
___992
95_
—P-1
1R_3
RETEST -SOUTHWEST CORNER OF FILL AREA
_75—
2
115.8
100,1
95
NO
P-1
NORTHWEST CORNER OF PAD
1
10-2 _7_15_.7_100.0
95
_NG
—P-1
7—
NORTHEAST CORNER OF PAD
1
10.0
115.9
100.2
9-5
_NG
—P-1
Proctor No. Max. Dry Optimum Soil Lao Test Remarks:
Density (co Moisture I%) Class, Type
7 1 115,7 10A _SM 'STOVE -DRIED MOISTURES
_
Freehling & Robertson, Inc,
Technician: ELDRIDGE ADKINS
PLEASE NOTE
The above tests represent spot tests only
at the locations noted. Fulltime
visual observation Of matwials placed
or methods of placement should not be
linferred.
So - Sand Cone (ASTM 0 1556)
NG - Nuclear Gauge
(ASTM 02922 & D3017)
DC - Onve Cylinder (ASTM D2937)
STD. - (ASTM D698)
MOD. - (ASTM D1557)
SINCE
FROEHLING & ROBERTSON, INC.
GEOTECHNICAL * ENVIRONMENTAL # MATERIALS
ENGINEERS * LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
910 TATE BOULEVARD, SE/SUITE 101 /HICKORY, NC 28601
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW,FANDR.COM
Client.- Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date'. 07/06/04 (PM Visits)
Technician: Eldridge Adkins
The F&R technician returned to the site as requested by Mr. Long, Long Grading, to perform
spot-check' in -place density tests using the nuclear gauge on soils previously placed in the
building pad.
The F&R technician performed four density tests at subgrade level with test results indicating th
100% compaction had been achieved, Mr. Long requested that the F&R technician return later
the day for further testing, I
The F&R technician returned to the site as requested and performed one density test using t
nuclear gauge on fill previously placed under the existing canopy. Based on the test results, 95 cl
compaction had been achieved. Mr. Long requested that the F&R technician return to the site
July 7, 2004 for further testing.
I
Respectfully Submitted,
FROEHLING & ROBERTSON, INC,
Michael W, Sloan, P.F.
Branch Manager
BRANCHES: ASHEVILLE,NG - BALTIMORE,MD m CHARLOTTE, NC - CHESAPEAKE,VA
Client:
N
I
FIELD DENSITY SUMMARY SHEETS
41rvnDv RACIron fIr-ki
I L;r% Date: 07/062/04 (PM Visits)
MA HEWS CONSTRUCTION COMPANY, INC. Record No : F77-03rT
6 6
NORTHWEST
NORTHWEST
7
NORTHEAST G
81145'
S SOUTH OFF
9
120'SOUTH OFF
10
C
CENTER UNDEI
U
Field
Field Dry
Percent of Maximum
Field Test
Proctor
Test
Elev,
Moisture
Density
Dry Density
Type
No,
Location
(FT)
Content
(pCf)
BUILDING PAD
ACT, SPEC.
5RNER'
SG
10.3
116-1
100.3 100
NO
P-1
RNER
SG
10.1
116.3
100.5 100
NG
-P_ 1
4ORTHWEST CORNER
SG
10.5
115.7
100.0 100
NG
P-1
4ORTHEAST CORNER
SG
10.3
116,2
100.4 100
-NG
-P1
CANOPY
1
10.4
116.0
100.3 95
-NG
-P1
ctor No, Max, Dry Optimum Soil - -- Lab Te
Density (pco Moisture Class. Type
115.7 10.1 -SM STD
PLEASE NOTE
The above I
Remarks: ey:
C -Sand Cone (ASTM 01556)
NG -Nuclear Gauge
K S
N
e
C G
y
Sa
Nun c d ,a
C a
Cone
r G' {ASTM D2922 D3017)
C ,
Froehling & Robertson, Inc, DC - [Dnve Cylinder (ASTM D2937)
ST _ (
- (ASTM D698)
Technician: ELDRIDGE ADKINS STD. ASTM D,
MOD.( STM r
- (ASTM D1557)
M A
SINCE
FROEHLING & ROBERTSON, INC.
GEOTECHNICAL # ENVIRONMENTAL # MATERIALS
ENGINEERS * LABORATORIES
SWER ONE HUNDRO YURS OF SERVICE"
1881 " 910 TATE BOULEVARD, SEISUITE 101 /HICKORY, NC 28601
TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW.FANDR.COM
I#Lfflffiulflm. s
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/07/04
The F&R technician arrived on -site at the request of Mr, Long, Long Grading, to perform 'spot-
check' in -place density tests using the nuclear gauge on soils previously placed under the
existing canopy.
The F&R technician performed two density tests after the subcontractor had finished compaction
on the soils placed. used on the test results, 100% compaction had been achieved.
Please note that the above represent spot tests only at the locations noted. Fulltime visual
observation of materials placed or methods of placement should not be inferred.
Respectfully Submitted,
FROEHLING & Rid BERTSON, INC.
Michael P.E.
Branch Manager
TELEPHONE (804) 264-2701 - FAX (W4) 264-1202 - www,FandR,com
BRANCHES; ASHEVILLE, NC - BALTIMORE, MO - CHARLOTTE, NC - CHESAPEAKE, VA
(�Pn7l=T VA . r:AVPT-rC%1ft I M Alf'
FIELD DENSITY SUMMARY SHEETS
Project: HICKORY METRO CENTER
Client: MATTHEWS CONSTRUCTION COMPANY, INC.
----------
F Ued Dry Density
Dens
(pcf) 1 1 5 .9
10�6 1 1 �0
--7106 116�O
Field Field Dry
Test Test Elev. Moisture Density
Na.Location (FT.) Content (pCf)
BUILDING PAD
NORTH Test
EDGE OF CANOPY SG 10,5 115.9
So UT T
Test
2SOUTH CENTER EDGE OF CANOPY SG
Proctor No. Max. Dry Optimum scrl Lab Test Remarks:
Density (pco Moisture Class, Type
S M ---�TCI
15.7 F5- I 1().l
Froehfing & Robertson, Inc.
Technician: ELDRIDGE ADKINS
PLEASE NOTE
The above tests re�res
at the locations noted. Fulltime
visual observation of materrials placed
or methods of placement should not be
Date: 07/07/04
Record No.: F77-035T
Percent of Maximum Field Test Proctor
Dry Density Type
No.
ACT. SPEC.
-i—OE2 f-10— J
N G
—Pi
100�3 16
0-0-1 ING
P-1
P_J
Key:
SC - Sand Cone (ASTM D1 556)
No - Nuclear Gauge
(ASTM D2922 & D3017)
DC - Drive Cylinder (ASTM D2937)
STD. - (ASTM 0698)
MOD. - (ASTM D1557)
SINCE
Jk FROEHLING & ROBERTSON, INC.
%.JP GEOTECHNICAL # ENVIRONMENTAL * MATERIALS
ENGINEERS * LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
910 TATE BOULEVARD, SE/SUITE 101/HICKORY, NC 286
TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW,FANDR.COM I
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/13/04
Technician: Michael W. Sloan, P.E./Kenneth Atkinson
The F&R representatives arrived on -site at the request of the client to perform a subgradt,
evaluation of the previously excavated foundations located on the new building pad addition
adjacent to the west wall of the existing building,
The F&R representatives hand probed the footing and the residual bearing soils appeared to
very firm. Two Dynamic Cone Penetrometer (DCP) tests were performed, i
#JJNMLZ&JJ#
TELEPHONE (804) 264-2701 - FAX (804) 2644202 - www.FandR,com
BRANCHES: ASHEVILLE, NC - BAuriMORE, MD CHARLOTTE, NC - CHESAPEAKE, VA
srn+ce
/ /
a
9H8i
FOUNDATION BEARING GRADE REPORT
Project: Hickory Metro Center Page No: 1
Client: Matthews Construction Company Date (on -site): 7/13/2004
F&R Representative: ;Mike Sloan/Kenneth Atkinson Project No.: F77-035T
DYNAMIC CONE PENETRATION TESTS (ASTMS ccial Technical Publication No. 399)
��'r+S`�r y, v� s rt„ �. � �t+.,: ➢ � �+a�� ;i �. � � 7�„0"" ����'r7?s,`�.��� �� ��„o;.ea `*'"'- �\. �: ".�++:
RasidualmRed/Stown Silty Sand
20+ Nand Auger Refusal @ -1'
f 50-feet South of Northeast
Corner of New Addition
0' 10 10 10 Residual-Red/Brown Silty Sand
-(' 20+ e 20+ Nand Auger Refusal @ -1'
5-Feet fast of Northeast
Corner of New Addition
- * Depth Below Footing Bearing Orade
Note: NG is the average of the second and third !)CP readings
Any opinions or recommendations should be based on the field observations made and the tests performed, All bearing grades
should be free of soft, loose;, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement of concrete, Exterior foundations should he emhe-tidp(i at 1p—t 4". t:..,.,t .,............ .......a._.
INCE FROEHLING & ROBERTSON, INC.
GEOTECHNICAL # ENVIRONMENTAL * MATERIALS
ENGINEERS * LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
910 TATE BOULEVARD, SE/SUITE 101 /HICKORY, NC 28601
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW.FANDR.COM
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/15/04
The F&R technician arrived on -site at the request of the client to perform a subgrade evaluation
of the previously excavated foundations located on the new building pad addition along the east
and north walls.
The F&R technician performed two Dynamic Cone Penetrometer (DCP) tests and hand probed all
footings. The bearing materials consisted of residual soils. The test results were discussed with
Mr. Mike Sloan, P.E. for F&R.
Based on the DCP test results, the near surface foundation soils evaluated are suitable for
lowl 11111119 WN11111 I
g1l" In ma [M a m W_ LW to In] I ME Amlawlawd affi-dPA I WLW r-AW-00 I
nor -All, a
F&R conducted a geotechnical study of the site years earlier and recommended that 3,000
pounds per square foot bearing capacity be used for foundation design of the existing structure.
i7lrVIWT
TELEPHONE (804) 264-2701 - FAX (804) 264-1202 - WWWFandRxom
BRANCHES: ASHEVILLE, NC ® BALTIMORE, MID CHARLOTTE, NC - CHESAPEAKE, VA
SI PAC E
1A81�
FOUNDATION BEARING GRADE REPORT
Project: Hickory Metre Center 'age No: 1
Client: Matthews Construction Company Date (on -site): 7/15/2004
F&R Representative: Kenneth Atkinson Project No.: F77-035T
DYNAMIC CONE PENT TION ,TESTS (ASTM Special "Cechnical ub[ cation N0. a99)
'� l y_' 4+x 7 A. '*' s 1i", a, r 1;�
a 7� , T �' trsu ate �rr{ttrUn
pStt y a *� Xrq d
y ,r wY .r y �'+�'"'3 P 6'�`x `;?,„,.,s.., 3 z'Y` a 4 t"'a'
' �t�t#tgx`a'' ..h Y� s a x; rLr`.7 a:
m , z..tiit'.,. &AS:.',.,.r.�,,
0' 10 30 20 Residual-Red/Brown Silty Sand
-8" 35+ 35+ Hand Auger Refusal
Approximately 25-North of
I Southeast Corner of East
Wall Footings
0' 7 9 8 Residual-Red/Brown Silty Sand
-11 14 17 15 Residual-Red/Brown Silty Sand
North Wall Footings _2' 15 20 17 Residual-Red/Brown Silty Sand
2 Approximately 52-Feet
West of Existing Building
1
* Depth Below Footing Bearing Grade
Nate: N, is the average of the second and third DC;P readings
Any opinions or recommendations should be based on the field observations made and the, tests performed. All bearing grades
should be free of soft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the. nlacemern ofcnnercfe I Aterinr fhiindatinns should he emhedde,ci nt le na t Minches helnim the final oytwrinr arndeq
SINCE
FROEHLING & ROBERTSON, INC.
GEOTECHNICAL * ENVIRONMENTAL * MATERIALS
ENGINEERS * LABORATORIES
"OVER ONE HUNDRW YEARS OF SERVICE"
910 TATE BOULEVARD, SE/SUITE 101/HICKORY, NC 2860
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW.FANDR.COM
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/20/04
M"Am
The F&R technician arrived on -site at the request of the client to perform a subgrade evaluation
of the previously excavated foundations located on the new building pad addition along the east
and south walls.
The F&R technician performed four Dynamic Cone Penetrometer (DCP) tests and hand probed
all footings. The bearing materials consisted of both residual and old fill soils. The test results
were discussed with Mr, Michael W. Sloan, P.
One 12-foot long section, approximately 20-feet south of the existing building along the east w
footings, required further excavation, At the time of this report, the area mentioned had be
I
I
'I
excavated to a depth of approximately 10-feet with further excavation pending. Mr, Chris Doyn
F&R Staff Engineer, agreed that the foundation in this area should be excavated, but provided
formal recommendations. The representative with Matthews Construction stated that the grad
would re -excavate the above mentioned area and re -compact the soil to the requir
specifications, An isolated area in the south wall footing contained loose soils that should
removed prior to concrete placement.
Aside from the areas mentioned above, and based on the DCP test results, the near surfa
foundation soils evaluated are suitable for support of the foundations designed based on
allowable net bearing pressure of 2,500 pounds per square foot at the locations tested.. T
findings and DCP test results are based on shallow surface hand augering; therefore, a de
investigative study should not be inferred. I
F&R conducted a geotechnical study of the site years earlier and recommended that 3,000
pounds per square foot bearing capacity be used for foundation design of the existing structure.
Respectfully Su
FROEHLINGJ Q
Michel I
Branc an
.IEADOUARTERS: 3015 D MARTON
TELEPHONE (804)
MANCHES: ASHEVILLE, NC - BALTIM(540(4
5 1 NCE
FOUNDATION BEARING"GRADE REPORT
Project: Hickory Metro Center Page No:
Client: Matthews Construction Company Date (on -site): 7/20/2004
F&R Representative: Kenneth Atkinson Project No.: F77-035T
DYNAMIC CONE PENETRATION TESTS (A TM Special Technical Publication No, 399
72'gN
;B rIN M!UMgnp W, 0
"Aan
6FraWI "M
gi
---f
01 6 3 77 Old Fill -Brown Silty Sand
-11 6 5 5 Old Fill -Brown Silty Sand
Approximately 20-feet -
South ot'Existing Building -2' 4 2 3 Old Fill -Brown Silty Sand
Along the East Wall -3' 4 4 4 Old Fill -Brown Silty Sand
Footings -
_4' 4 4 4 Old Fill -Brown Silty Sand
-5' 5 4 4 Old Fill -Brown Silty Sand
01 4 4 4 Old Fill -Brown Silty Sand
-11 7 13 10 Residual -Brown Silty Sand
Approximately 4-feet South -2' 8 15 12 Residual -Brown Silty Sand
2
of No. I
01 4 15 4 Old Fill -Brown Silty Sand
4 18 35 27 1 Residual -Brown Silty Sand
Approximately 3 1/2-tees
3
North of Test No, I
01 4 4 4 Residual -Loose Red/Brown Silty Sand
-11 4 9 7 Residual-Red/Brown Silty Sand
Approximately 75-feet West - - - -
of the Southeast Comer -2' 18 35 27 Residual-Red/Brown Silty Sand
4
Along the South Wall
Footings
Depth Below
Footing Bearing Grade
Note: IN,
is the average of the second and third DC P readings
Any opinions
or recommendations should be based on the field observations made and the tests performed. All bearing grades
should be Free
of soft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement
of concrete. Fxterior foundations should be embedded at least 12-inches below the final exterior Prades
SINCE
FROEHLING & ROBERTSON, INC.
%I GEOTECHNICAL * ENVIRONMENTAL * MATERIALS
IQ( ENGINEERS * LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
0. 910 TATE BOULEVARD, SE/SUITE 101/HICKORY, NC 28601
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADRESS: WWW.FANDR.COM
Client: Mr, Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/21/04
Technician: Chris Doyne, Staff Engineer
F&R was requested on -site by Mr. George Moses to attend a meeting concerning the soft bearing
soils located in the east wall strip foundation line.
Upon arrival, it was noted that the foundation had been undercut 10-feet in depth and 10-feet
length, and the entire width of the foundation, Soft soils were also encountered in a 9' x 9' x
deep area adjacent to the foundation under the slab. F&R had recommended backfilling the'
areas with flowable fill in the foundation and washed stone in the slab area, however, in order
expedite the process, Matthews Construction decided to backfill both undercut areas wii
flowable fill. The structural engineer increased the amount of rebar from three No, 3 bars to s
No, 6 bars to be extended 4-feet into the foundation adjacent to the undercut area. 31
Once the area has been backfilled, the near surface bearing materials are suitable for t
required bearing capacity of 2,500 pounds per square foot. The findings are based on shallol-_
surface hand augering tests which did not extend past the 10-foot depth of the undercut are
therefore, a deep investigative study should not be inferred.
HEADQUARTERS: 3015 DUMBARTON ROAD - BOX 27524 - RICHMOND, VA 23261-7524
TELEPHONE (804) 264-2701 ® FAX (804) 264-1202 - www,FandR,c0m
BRANCHES: ASHEVILLE, NC ^ BALTIMORE, MD - CHARLOTTE, NC - CHESAPEAKE, VA
SINCE
FROEHLING & ROBERTSON, INC.
GEOTECHNICAL * ENVIRONMENTAL * MATERIALS
ENGINEERS # LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
910 TATE BOULEVARD, SE/SUITE 101 /HICKORY, NC 28601
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDRESS: WWW.FANDR.COM
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project, Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/21/04
Technician: Eldridge Adkins
The F&R technician arrived on -site at the request of the client to perform a subgrade evaluation
of the previously excavated foundations located on the new building pad addition along the west
wall footings from the southeast building corner north 43-feet.
footings, The bearing materials consisted of residual soils, The F&R technician observed that
soft area located at the east wall footing line had been undercut, The undercut area appeared
I
be 9-feet by 9-feet by 10-feet in depth in the foundation and 3-feet deep under the slab, T]h
area was backfilled with flowable fill,
Based on the DCP test results, the near surface foundation soils evaluated are suitabi f
i W NUNN ANN L, "' G* I i
F&R conducted a geotechnical study of the site years earlier and recommended that 3,000
pounds per square foot bearing capacity be used for foundation design of the existing structure.
. #• M I - . I'll i z
BRANCHES: ASHEVILLE, NO - BALTIMORE, MD - CHARLOTTE, NC - CHESAPEAKE, VA
S I N C E
's FOUNDATION BEARING GRADE REPORT
/�jcct: Hickory N�ctro Center Page No: 1
.Client: Matthews Construction Company Date (on -site): 7/21/2004
F&R Representative: F`ldridge Adkins Project No.: F77-035T
DYNAMIC CONE PENETRATION TESTS (ASTM Special Technical Publication No. 399)
Igogox
g, N%', 1
f* "1"'0144
T 11,101 �R%NNQN 0
0
1 24
01 12 15 13 Residual -Gray Silty Sand wMeathered Rock
-11 17 23 20 Residual -Gray Silty Sand w/Weathered Rock
Southeast Corner of the -2' Hand Auger Refusal @ 1' 5"
1 West Wall Footing
36" wide X 20" deep
01 11 14 12 Residual -Gray Silty Sand w/Weathered Rock
-11 16 22 19 Residual -Gray Silty Sand w/Weathered Rock
43-feet North in the Footing
Line From the Southeast -T A Hand Auger Refusal @ V7"
2 Building Comer
36" wide X 20" deep
Depth Below Footing Bearing Grade
Note: N, is the average of the second and third DC P readings
Any opinions or recommendations should be based on the field observations made and the tests pertbri-ned, All bearing grades
should be free ofsoft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement of concrete. Exterior fmindations Should be embedded at least 12-inches below the final exterior grades.
SINCE
,*
TSON, INC.
GEOTECHNICAL
$0, R, ENGINEERS o LABORATORIES
,,OVER ONE HUNDRED
BOULEVARD, SEISUITE 101/HICKORY,
1881 TELEPHONE:. I►
ADDRESS:EMAIL •'►
Client: Mr, Charles Canrobert
Matthews Construction Company, Inc,
210 First Avenue South
Conover, NC 26613
Project: Hickory Metro Center
Morganton, NC
F R Project Number F77-035T
Date: 07/22/04
Technician: Eldridge Adkins
performThe F&R technician arrived on -site at the request of the client to • •
of the previously excavated foundations located on the new building pad addition along
intermediatewall footings starting 45-feet north of the southwest corner north approximately 225-feet to t
step down area at the
The F&R technician performed three Dynamic ConeoPand hand probed
bearingall footings. The materials consisted of residualsoils.
near surface foundation soils'• are suitablefor
poundsbased on an allowable net bearing pressure of 2,500
tested . The findings and DCP test results are based on
therefore,deep investigative study should not
,.
capacity conducted a geotechnical study of the site years earlier and recommended that 3,000
pounds per square foot bearing be used for foundation design of
Respectfully Sub ' iIM*#$,
F2C1 HL I & ` C.
EAL
Michael W to P
Branch Ma 6
7
�. V
�r A�t19t1111t6ON
��
HEADQUARTERS: 3015 DUMBARTON ROAD ® X 27524 * RI ND, VA 1.7524
TELEPHONE (804) 2 2701 8 FAX ( ) 1202 * www.FandR.com
BRANCHES: ASHEVILLE, NO • BALTIMORE, MD • CHARLOTTE. NC • CHESAPEAKE, VA
S N C E
p.
FOUNDATION BEARING GRADE REPORT
Project: Hickory Metro Center Page No:
Client: Matthews Construction Company Date (on -site): 7/22/2004
F&R Representative: Eldridge Adkins Project No.: F77-035T
DYNAMIC CONE PENETRATIONTESTS (ASTM Special Technical Publication No. 399)
E_i MA
MON. AN
V
19 24 22
Residual -Tan Silty Sand w/Weathered Rock
-11
Hand Auger Refusal @ -10"
West Wall f'ooting, 93' ---
North of the Southwest -2'
Building Corner
32" wide x 18" deep
01
20 27 24
Residual -Tan Silty Sand wNVeathered Rock
Hand Auger Refusal @ -6"
West Wall Footing 176'
North of the Southwest -2'
Building Corner
32" wide x 18" deep
01
20 28 24
Residual -Tan Silty Sand wNVeathered Rock
Hand Auger Refusal @ -7"
West Wall Footing 2 10'
3
North of the Southwest -2'
Building Corner
32" wide x 18" deep
Depth Below Footing Bearing Grade
Note: N, is the average o(the second and third DCP readings
Any opinions or recommendations should be based on the field observations made and the tests pertbrined, All bearing grades
should be free of soft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement of concrete. Exterior foundations should be embedded at least 12-inches below the final exterior grades.
SINCE
FROEHLING & ROBERTSON,
ENGINEERS * 0. LABORATORIES
"OVER ONE +► . r YEARS OF
*10 TATE BOULEVARD, w*, 8*0:
EMAIL ADDRESS: WWW.FANDR.COM
Client. Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
FR Project Number F77-035T
Crate: 07/23/04
Technician: Kenneth Atkinson
The F R technician arrived on -site at the request of the client to perform a subgrade evaluation
of the previously excavated foundations located along the northwest corner of the new addition
building pad.
#M• " .footings. The excavated •
footings- sdeep. The bearing matenal
consisted of residual soils. The test results were discussed with Mr. Chris Doyne, Staff Engine
for .„
Based on the DCP test results, the near surface foundation soils evaluated are suitable
• gh te-4•.• 2 r""4W4_4" , 'if E;
per square foot at the locations tested. The findings and DCP test results are based on shall
surface hand angering; therefore, .. investigative•not be inferred. I
F&R conducted a geotechnical study of the site years earlier and recommended that 3,000
pounds per square foot bearing capacity be used for foundation
rw
Branch Manager
l
BRANCHES: ASHEVILLE, NC • BALTIMORE, MD - CHARLOTTE, NC . CHESAPEAKE, VA
S I N C E
FOUNDATION BEARING GRADE REPOR'r
Hickory Metro Center Page No: 1
/ieet:
/fient:
Matthews Construction Company Date (on -site): 7/23/2004
/F&R Representative:
Eldridge Adkins Project No.: F77-035T
DYNAMIC CONE PENT'ITESTS (ASTM S eclat Technical Publication No. 399)
7 F 55 77 � 777F '5W
1,20 "'T AW
lur My
R MIN, g
D F" R""'AR"
- --- - ------
01 7 17 12 Residual-Red/Gray Silty Sand
-11 17 27 22 Residual -Light Brown Silty Sand
25-Feet eauth of the- -
-2' 25 37 31 Hand Auger Refusal @ -2'
Northwest Corner on the
Building Pad Footing
2' wide x 1 1/2' deep
01 9 18 14 Residual-Red/Gray Silty Sand
-11 16 22 19 Residual-Red/Gray Silty Sand
20-Feet East of the
Northwest Comer on the -2' 16 13 14 Residual-Red/Brown Silty Sand
2
Building Pad Footing -3' 13 15 14 Residual-Red/Brown Silty Sand
Twide x I 1/2'deep
4 12 13 12 Residual-Red/Brown Silty Sand
Depth Below
Footing Bearing Grade
Note:
N, is the average of the second and third DCP readings
Any opinions
or recommendations should be based on the field observations made and the tests performed, All bearing grades
should be
free of soft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement
of concrete, Exterior foundations should be embedded at least 12-inches below the final exterior grades,
SINCE
FROEHLING & ROBERTSON, INC.
GEOTECHNICAL * ENVIRONMENTAL # MATERIALS
16( ENGINEERS # LABORATORIES
"OVER ONE HUNDRED YEARS OF SERVICE"
0" 910 TATE BOULEVARD, SE/SUITE 101 /HICKORY, NC 28601
1881 TELEPHONE: 828-324-4081/FAX: 828-324-6770
EMAIL ADDROM
Client: Mr. Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 28613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/26/04
Technician: Kenneth Atkinson
The F&R technician arrived on -site at the request of the client to perform a subgrade evaluation
of the previously excavated interior pier foundations located in the center of the new addition
building pad.
The F&R technician performed five Dynamic Cone Penetrometer (DCP) tests and hand probed ,
footings. Four of the excavated footings measured 8-feet wide by 8-feet length by 2-feet in dep
and one measured 5-feet wide by 5-feet length by 1-foot in depth, The bearing mated
consisted of residual soils, The test results were discussed with Mr. Chris Doyne, Staff Engine
for F&R.
f QW,
Based on the DCP test results, the near surface foundation soils evaluated are suitable
per square foot at the locations tested. The findings and DCP test results are based on shallo
surface hand augering; therefore, a deep investigative study should not be inferred. I
F&R conducted a geotechnical study of the site years earlier and recommended that 3,000
pounds per square foot bearing capacity be used for foundation design of the existing structure.
—J,
BRANCHES: ASHEVILLE, NC ® BALTIMORE, MID , CHARLOTTE, NG - CHESAPEAKE, VA_
S G N C E
FOUNDATION BEARING GRADE REPORT
Project:
Hickory Metro Center Page No: 1
Client:
Matthews Construction Company Date (on -site): 7/26/2004
F&R Representative:
Kenneth Atkinson Project No.: F77-035T
DYNAMIC CONE PENETRATION TESTS (ASTNI Special Technical Publication No. 399)
0
Jga �Ic' kj000" b"',
OF
'M IN 2
Y,� tlayAs I gg
01 8 18 13 Fill-Red/Brown Silty Sand
-11 16 204- 18 Residual-Red/Brown Silty Sand
Approximately 40' West of
-2' - 20+ 20+ Residual-Red/Brown Silty Sand
East Wall Near the Middle
of the Building Pad Hand Auger Refusal @ -2'
8' x 8'x 2' deep
01 9 20+ 14 Fill-Red/Brown Silty Sand
Approximately 30' South of Hand Auger Refusal @ - 10"
'rest No, I and
2
Approximatley 40'West of
East Wall
8' x 8' x 2' deep
01 12 20 16 Fill-Red/Brown Silty Sand
Approximately 20' West of 20+ 20+ Residual-Red/Brown Silty Sand
Test No, I and -218 20+ 19 Residual-Red/Brown Silty Sand
3
Approximately 60' West of
East Wall Hand Auger Refusal
8'x 8' x 2' deep
01 12 17 14 Fill-Red/Brown Silty Sand
-11 14 20+ 17 Residual-Red/Brown Silty Sand
Approximately 30' South of -2' 17 20+ 18 Residual-Red/Brown Silty Sand
4
Test No. 3 and 20' West of
'rest -Y 12 20+ 16 Residual-Red/Brown Silty Sand
No, 2
01 6 13 9 Fill-Red/Brown Silty Sand
20+ 20+ Hand Auger Refusal @ -10"
5
Approximately 75' North of (ABC Stone Encountered)
'rest No. 3
Depth Below
Footing Bearing Grade
Now
N, is the average of the second and third DCP readings
Any opinions
or recommendations should be based on the field observations made and the tests performed. All bearing grades
should be
free of soft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement
of concrete. Exterior foundations should be embedded at least 12-inches below the final exterior grades,
SINCE
ROBERTSON,
ENGINEERS # ;•0- •.IES
�r - • +► r ;
+,
EMAIL ADDRESS: ,
Client: Mr, Charles Canrobert
Matthews Construction Company, Inc.
210 First Avenue South
Conover, NC 23613
Project: Hickory Metro Center
Morganton, NC
F&R Project Number F77-035T
Date: 07/27/04
Technician: Kenneth Atkinson
The FR technician arrived on -site at the request of the client to perform a subrade evaluation
of the previously excavated pier and intermediate wall foundations located under the north side of
the existing canopy and approximately 20-feet west of and in front of the canopy running north to
south.
The F&H technician t m .IMM
•
footingsall footings. The depth
results were discussed with Mr. Chris Doyne, Staff Engineer for F&R.
foundation
Based on the DCP test results, the near surface •
designedsupport of the foundations based on
shouldper square foot at the locations tested, The findings and DCP test results are based on shallo
surface hand augering; therefore, a deep investigative study not be
recommendedF&R conducted a geotechnical study of the site years earlier and that 3,000
pounds per square foot bearing capacity be used for foundation design of the existing structure,
BRANCHES. ASHEVILLE, NC ° BALTIMORE, MD ® CHARLOTTE, NC • CHESAPEAKE, VA
S I NCE
nl
FOUNDATION BEARING GRADE REPORT
Project: Hickory Metro Center
Client: Matthews Construction Company
F&R Representative: Kenneth Atkinson
Page No: 1
Date (on -site): 7/27/2004
Project No.: F77-035T
DYNAMIC CONE PENETRATION TESTS (ASTM Special Technical Publication No. 399)
A APYb"IM,
fiA
'2 Ilk"AwUt
'"k1 t5M , AMi ar
MOI&
V"-
01 5 12 8 Fill-Red/Brown Silty Sand
Intermediate Wall Footing 20+ 20+ Hand Auger Refusal @ -8" (ABC Stone)
West of Canopy on Existing
I
Building Approximately 20-
feet frorn Southwest Canopy____
Corner
01 8 10 9 Fill-Red/Brown Silty Sand
-11 7 7 7 Fill-Red/Brown Silty Sand
Wall Footing Under North
Side of Canopy on Existing -2' 17 16 16 Fill-Red/Brown Silty Sand
Building Between Two -Y 9 10 9 Residual-Red/Brown Silty Sand w/Clay
Existing Piers ----
4' 13 20+ 16 Residual-Red/Brown Silty Sand
01 14 20+ 17 Fill-Red/Brown Silty Sand
Intennediate Wall Footing -11 12 20+ 16 Fill-Red/Brown Silty Sand (Just Under ABC Stone)
West of Canopy on Existing -2' 7 17 12 Residual-Red/Brown Silty Sand
3
Building Approximately 20-
feet from Northwest Canopy -T 11 12 11 Hand Auger Refusal
Comer
Depth Below
Footing Bearing Grade
Note: N,
is the average of the second and third DCP readings
Any opinions
or recommendations should be based on the field observations made and the tests performed. All hearing grades
should be free
of soil, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement
of concrete, Exterior foundations Should be embedded at least 12-inches below the final exterior grades.