Loading...
HomeMy WebLinkAboutB4-519 BARRIER ENG RPT.PDF..-. ,. -.HICKORY, • 1�! J�"11 REPORT MCI PROJECT NAME CLINE VILLAGE: FIRE DEPT. PROJECT NO 2-1047 PROJECT LOCATION CONOVER REPORT NO 4 CLIENT NAME R.L.CASEY DATE OF REPORT 06-14-04 CONTRACTOR R.L.CASEY DATE OF POUR [CPL] 05-14-04 CONCRETE SUPPLIER HICKORY RED! MIX LOCATION OF POUR FRONT WALL FROM LEFT SIDE TO RIGHT FRONT CORNER STRENGTH REQUIREMENT 3000 psi @ 23 Days QUANTITY REPRESENTED 9 Cu.Yds, ACTUAL SLUMP 15 Inches TRUCK NO 75 ENTRAINS AIR NIA % TICKET NO 97476 AIR TEMPERATURE 79 ° F TIME BATCHED 11:10 CONCRETE TE PE ATURE N/A ° F TIME PLACED 11:45 INFORMATION BY BILL PUTNAM WATER ADDED 5 Gallons CYLINDERS BY RILL PUTNAM CYLINDERS DELIVERED BY SAM POWELL CYLINDER SIZE 6 X 12 Inches CYLINDER AREA 2&27 Square Inches TEST T CYLINDER LAB DATE DATE DATE NO NO OLDER RECEIVEDTESTED AGE TOTAL UNIT 2-1047-16 15893 05-14-04 05-17-4 05-21-04 (Days) LOAD (PSI) LOAD (PSI) 2-1047-17 15894 05-14-04 05-17-04 05-21-04 7 7 8,500 2950 2-1047-18 15 5 05-14-04 05-17-04 06-11-04 28 2,000 2-1047-1 15896 05-14-04 05-17-04 06-11-04 10,000 28 3820 82 0 2-1047-20 15897 05-14-04 05-17-04 HOLD 5 109,000 3860 , - E) L - () () I- �- .;.,. PO, BOXi http://www.barrierengineering.co PROJECT NAME CLINE VILLAGE FIRE DEPT, PROJECT NO 2-1047 PROJECT LOCATION CONOVER REPORT NO 3 CLIENT NAME R.L.CASEY DATE OF REPORT 06-09-04 CONTRACTOR R.L.CASEY DATE OF POUR [CPL] 05-11-04 CONCRETE SUPPLIER HICKORY REDI MIX LOCATION OF POUR INTER, FOOTINGS LOBBY #1 VESTIBULE STRENGTH REQUIREMENT 3000 Psi c@ 28 Days QUANTITY REPRESENTED 10 Cu.Yds. ACTUAL SLU P 4.5 Inches TRUCK NO 75 ENTRAINED AIR N/A % TICKET NO 97315 AIR TEMPERATURE 65 ° F TIME BATCHED 10.35 CONCRETE TEMPERATURE 75 ° F TIME PLACED 11.25 INFORMATION BY DARRELL RICHARDSON WATER ADDED 0 Gallons CYLINDERS BY DARRELL RICHARDSON _ CYLINDERS DELIVERED RY D. RICHARDSON CYLINDER SIZE 6 X 12 Inches CYLINDER AREA 26.27 Square Inches CYLINDERDATE DATE DATE • • r r TESTED • . LOAD • "�� 89,000 w 69 ** �• i • * i♦ 72 * 05-12-04 �r 1 4, � � r ,r ♦ w r,: rr BARRIER 111v4U ENGINEERING LABORATORIES, M • f•.: PO, BOX 2067; HICKORY, NC 286C * ! / FAX 828 * - 4 http://wwwbarrierengineering.co REPORT CONCRETE PROJECT NAME CLINE VILLAGE FIRE DEPT, PROJECT NO 2-1047 PROJECT LOCATION CONOVER . �"'� REPl.lRT NO CLIENT NAME R.L.CASEY DATE OF REPORT 06®09-04 CONTRACTOR R.L.CASEY DATE OF POUR [CPLI 05-07-04 CONCRETE SUPPLIER HICKORY REDI MIX LOCATION OF POUR ELEVATOR SHAFT —SOUTH-WEST WALL FOOTING STRENGTH REQUIREMENT 3000 psi @ 28 ACTUAL SLUMP 4.25 Days QUANTITY REPRESENTED 10 Inches TRUCK NO 75 Cu .Yds. ENTRAINED AIR NIA % TICKET NO 97191 AIR TEMPERATURE 90 ° F TIME BATCHED 11:01 CONCRETE TEMPERATURE 75 o F TIME PLACED 11:40 INFORMATION BY DARRELL RICHARDSON CYLINDERS BY DARRELL RICHARDSON CYLINDER SIZE _ 6 X 12 Inches WATER ADDED 5 Gallons CYLINDERS DELIVERED RY D. RICHARDSON CYLINDER AREA 28,27 Square Inches TEST DATA CYLINDER LAB O NO 2-1047-6 15864 2-1047-7 15865 2-1047-8 15866 2-1047-9 15867 2-1047-10 15868 DATE DATE MOLDED RECEIVED 05-07-04 05-08-04 05-07-04 05-08-04 05-07-04 0 -08-04 05-07-04 05-08-04 05-07-04 05-08-04 DATE TESTED AGE TOTAL 05-14 (Days) LOAD(PSI) 7 05-14-04 7 81,000 06-04-04 28 102, 00 06-04-04 1,500 28 10 HOLD ,500 56 UNIT LOAD (PSI)-04 2870 36 0 86 0 35 0 VARRIER ENGINEERING TESTING LABORATORIES, PO, BHICKORY, NC 2861 • •28 • REPORT CONCRETE PROJECT NAME CLINE VILLAGE FIRE DEPT. PROJECT NO 2-1047 PROJECT LOCATION CONOVER REPORT NO 1 CLIENT NAME R.L.CASEY DATE OF REPORT 06®04-04 CONTRACTOR R.L.CASEY DATE OF POUR [CPL] 04-30-04 CONCRETE SUPPLIER HICKORY REDI MIX LOCATION OF POUR REAR WALL OF BLDG. STRENGTH REQUIREMENT 3000 psi pia 28 ACTUAL SLUMP NIA Days QUANTITY REPRESENTED 10 Inches TRUCK NO 71 Cu.Yds, ENTRAINED AIR N/A % TICKET NO 96977 AIR TEMPERATURE 63 ° F TIME BATCHED 11:77 CONCRETE TEMPERATURE N/A --- ° F TIME PLACED 12:05 INFORMATION BY DARRELL RICHARDSON CYLINDERS BY DARRELL RICHARDSON CYLINDER SIZE 6 X 12 Inches WATER ADDED 6 Gallons CYLINDERS DELIVERED By D, RICHARDSON CYLINDER AREA 23.27 Square Inches TEST DT CYLINDER LAB NO NO 2-1047-1 15829 2-1047-2 15830 2-1047- 15831 2-1047-4 15832 2-1047-5 15833 DATE DATE OLDER RECEIVEDTESTED 04-30-04 05-03-04 04-30-04 05-03-04 04- 0-04 0 -03-04 04-30-04 05-03-04 04-0-04 0-03-04 DATE AGE TOTAL 05-07-04 (Days) LOAD (PSI) 05-07-04 80,000 05-28-04 2 101,0000 05-28-04 28 99,50 06-25-04 56 ,00 UNIT LOAD (PSI) 2830 2812 3570 3570 350