DAILY REPORT
Client: Mr. Jeremy Norman
Building Systems, General Contractors
P.O. Box 3409
Hickory, NC 28603-3409
Project: Hart Entertainment
Hickory, NC
F&R Project Number E77-141 T
Date: 02/25/04
Technician: Wilson H.-Goff-Chris Wright
- oo Y
'The F&R representatives traveled to the site at the request of Mr, Michael Yount, project
superintendent, to continue the subgrade evaluation of the 4 excavated interior pier footings, The
F&R representatives performed four Dynamic Cone Penetrometer (DCP) tests and the results
were supplied to M. Sloan, F&R P.E., for his evaluation and recommendations.
While on -site, Mr. Goff was requested to verify the pier footing sizes, depth, and all steel
reinforcement size and placement as shown on foundation plan on street No. 4 dated August 28,
2003, Three wire ties and proper clearance of the reinforcement was corrected at one pier
location, All other reinforcement was found to be satisfactorily placed and sized as per the
drawing. All pier foundations were excavated to the required size and depth.
After review of the DCP test results, it was recommended to Mr. Yount to over -excavate 3 pier
foundations in order to achieve the specified bearing capacity. On site, Mr. Goff verified that the
client had over -excavated the pier footing located at the left front corner by 1-foot in depth, the
pier footing located at the left rear corner by 2--feet in depth, and the pier footing located on the
right side wall marked as the 'F-SL' by 3-feet in depth.
Based on the results of the DCP testing and implementation of our over -excavation
recommendations, the near surface foundation bearing materials evaluated are Suitable for
support of the foundations designed based on an allowable net bearing pressure of 2,000 pound--,
per square foot at the locations tested.
Please note that F&R ties not performed a geotechnical subsurface exploration on this site. The
findings and DCP test results are based on shallow subsurface hand angering, therefore, a deep
investigative Study should not be inferred.
Respectfully Subm'
FROEHLING &
Sl
SEAL
Michael W, S14111, 02 6
Branch Managjt-4. f/
HFADOUARTERS: 3015 DU VRARTON R(�)� A 23261-7524
TELEPHONE (804) 264-2,;Ve,
f Fandil,com
SRANCHES� ASHEVILLE, NC - BALTIMORE, MD - (>iARLOTTE, NC - CHESAPEAKE, VA
SfNCE
FOUNDATION BEARING GRADE REPORT
Project: I [art 11'ritertainnient Permit No: N/A
Clieut: BUilding Systems, Gen. Contr. Date (on -site): 2/25/2004
MR Representative: W. Goff/C. Wright Project No.: E77-141 T
DYNAMIC CONE PENETRATION TESTS (ASTNI rectal Technical Publication No. .399)
"PIN"
7,771
01 10 10 10 Fill -Red Brown Sandy Silt w/Mica
-11 12 13 12 Fill -Red Brown Sandy Silt w/Mica
Interior flier C-2 _2' 16 17 16 Fill -Red Brown Sandy Silt w/Mica
_Y 10 17 14 Fill -Red Brown Sandy Silt W/Mica
4' 10 20-1 20+ Fill -Red Brown Sandy Silt w/Mica
01 6 8 7 Fill -Red Brown Sandy Silt w/Mica
-11 12 14 13 Fill -Red Brown Sandy Silt w/Mica
2 Interior flier G.3 -2' 9 13 11 Fill -Red Brown Sandy Silt w/Mica
-3f 9 12 10 Fill -Red Brown Sandy Silt w/Mica
- -4 17 20 t 20t Fill -Red Brown Sandy Silt w/Mica
01 7 1 C1 Fill -Red Brown Sandy Silt w/Mica
-11 8 11 9 Fill -Red Brown Sandy Silt w/Mica
3 Interior flier C-4
2' 10 10 10 Fill -Red Brown Sandy Silt w/Mica
_3' 11 12 11 Fill -Red Brown Sandy Silt w/Mica
-415 17 16 Fill -Red Brown Sandy Silt w/Mica
01 8 12 10 Fill -Red Brown Sandy Silt w/Mica
-11 9 10 9 Fill -Red Brown Sandy Silt w/Mica
4 Interior flier C-5 -2' 12 14 13 Fill -Red Brown Sandy Silt w/Mica
_3' 13 15 14 Fill -Red Brown SandySiltSilt w/Mica
-4 14 16 15 Fill -Red Brown Sandy Silt w/Mica
Depth Below Footing Bearing Grade
Note: N, is the average of the second and third D(T readings
Any opinions or recommendations should be based on the field observations made, and the tests performed, All hearing grades
should be free of'soft, loose, wet, organic, caved -in soils or otherwise deleterious materials and conditions immediately prior to
the placement ofconcrete. Exterior foundations should be embedded at least 12-inches below the final exterior grides.
Exterior grades should be sloped to direct surface runoffaway from structure,