Loading...
HomeMy WebLinkAboutB3-2187 TEMP HEAT APPL.PDF'*atawba County• • Services Division `i Box 389, Newton,:. ReviewPlan 4. Newton: +. Hickory6: Wk�Ylitf�l�Yll�ii lJ i i1 �' � e 2 c. t:. NOTE: Each separate meter to be connected is considered a separate request and subject to a separate fee. !. Mla Administration and Enforcement Code with the following local requirements. The owner, general contractor, and mechanical contractor must sign this request form for temporary utility connections, The form must be filled out completely. The following requirements will also apply; l . All heating units to be placed in operation shall have the following items inspected for compliance if applicable. a. Vent system (:Products of combustion) b. Appropriate amount of combustion air is provided. c. Gas lines shall be pressure tested and inspected, d. Water lines shall be pressure tested and inspected if geothermal or coil supplied by a hot water heater. e. Condensate traps and lines in place and inspected, f. Electrical circuits installed with appropriate disconnect, over -current, equipment grounding, conductors an raceways. g. Refrigeration lines shall be inspected with appropriate pressure certification tests. h. All gas tubing shall be labeled per gas code prior to temporary heat inspection, i. Approved temporary electrical power is a prerequisite for temporary heat. (This can be scheduled simultaneously with temporary electrical.) 2. No occupancy of any kind (persons, furnishings, etc.) shall be allowed during this period, without prior approval of the Code Enforcement Official, 1 The use of the system before final inspection is anticipated to be ~ days or less. If utility connection remains in use beyond 30 days general contractor will be billed monthly per County Fee Schedule, 4. If there is any violation of this agreement, this service shall be disconnected without prior notice to the participants. This shall be done without any obligation of responsibility on the part of the Code Official or Catawba County. S. All processing fees are applicable as set forth in the Catawba County fee schedule. I have read and agree to this procedure and guidelines as set forth by Catawba County and will abide by the conditions and qualifications under which it is issued. I further agree that failure to comply with the procedure may result in disconnection of gas, revocation of permit, and/or the refusal to consider further requests for temporary gas. _-_ ®----- ---------------------..____--m_____---__--_®_®_____-__----_-_-__®__-.--_----_----__---®___..--___ --_____-_______---- I •� o hereby apply for temporary use of the permanent _heating (Printed Name o General Contractor} (size/type system} t system located at (tr t ess of site} (Building number) (Unit number) (Date) At a Signature Title (taw r/General ontractor) Witness or Notar Date -----------------®__----____--,__®®-___-___--------.._--_----_---®_._--_-_-___---____--_--_-----__.._____--_-_---_--_-..__--------_-----___----_-__-____---_-_. I C do hereby apply for temporary e of the permanent utility service identified above. (Printed Name of Mecha ical ontractor) Signature Title_% Witness or Notary Date 15 March, 2004