HomeMy WebLinkAboutB3-2163 PEST RPT.PDFJob Name:�-,-
Date:
Areas to be treated:
To the General Contractor, Construction Superintendent, or other
Responsible Party, miticide label states that only the applicator(s) may
The Termidor 80 WG ter
be in the area during application, Therefore, you are being notified of today's
treatment, including the intended site(s) of application, We require that you
instruct the construction workers and other individuals to leave the area to be
treated during application and until the termitic ide is absorbed into the soil.
If the concrete slab(s) cannot be poured over the soil the same day it has
been treated, the label recommends that a vapor barrier be placed dson over has
Brosthe
treated soil to prevent disturbance of the termide barrier� Do�
not been contracted to install the vapor barrier,
t,
Sincerely, X-C
A
Dodson Bros. Exterminating Co., Inc.