HomeMy WebLinkAboutB3-1759 MACTEC RPT-4 PAGES.PDFw
°'44% nos„ ,. � ,� �r , .�«� a,m"
r
UP Code Un
MACTEC Engineering z • Consulting Services, Inc. 180040
2801 Yorkmont Road, Suite 100 Trip Charges
Charlene, # +; 180100 ej
#'
Project
Task
Project Name:
Supplies
Cost Center Page o
Project Manager
Date Needed; �.„r � �' �< {, Time Needed
Location: � .fay'- � ; ..: €,..Requested b (date):
Order Taken ley:_ Type of Work Requested
Project Contact (): Contractor:
On Site Time: '.< ' toTravel: to
On Site Time: to Travel: to
Office Time: to Mileage:
Total Time (includes site and Office Only): Regular: Overtime:
Total Time (travel only): Regular: Overtime:
Limits of Work ( )
Foundations Grief Summary and attach A & P Sheet - original and sketch)
Proofrolling (Attach proofrolling sheet - original)
Concrete (Attach copies of cylinder card(s) 4 front and back)
Field Density Testing Grief summary blowy and sketch)
Structural Steel (NDT, RT, UT, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
Circle AppropriateWeather: Clear Cloudy Showers Lt. Rain Heavy RainOther:
Air Temperature f
Project anage
r date: Site pep o p
����
Technician: Date: a e.
� .ate:
.: � ? '^;a t�gr , a"x.; ..n,�^g ��, >�g ��.`6 �u°*.�°'. "mac.• t�" _..e'�.e?4, ,ia, .�'�^, ". `i� �'�'. �4"" ,�p.�'.�u ,., °� rs,;��, ,,,,�,
EngineeringMAC'VEU
MACTEC . Consulting Services, Inc.
2801 Yorkmont Road,1i'
Charlotte, NC 28208
14 :stM
UP Code Units
180040 °p Charges
180100 Mileage
Project �
r174 2 Supplies
J °" {, Cost Center Page of
Task #
Project Na e: .. N ` Project M ager 1F -
Date laded:_ <-� C r a Time Needed
Locatmn: (I '' Requested by (date):
Order Taken y:_ Type of Work Requested__A
Project Contact (#}: Contractor: y .
On Site Time: to Travel: to
On Site Time to Trav& to
Office Time: toMileage:
Total Time includes site and Office Only): Regular: °�
(� Y)� Overtime:
Total Time (travel only): Regular: Overtime:
Limits of Work (MINIMUM INFORMATION )
Foundations (Brief Summary and attach A & P Sheet - original and sketch)
Proofrolling (Attach prooffolling sheet m original)
Concrete (Attach copies of cylinder card(s) - front and back)
Field Density Testing (Brief summary below and sketch)
Structural Steel T, RT, Ul, Visual Bolt Insp.)
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
.v }}
•m
Circle Appropriate Weather: Clear Cloudy Showers Lt. Rain Heavy Rain Other:
Air Temperature.
Project ana a� " i>ate: p.:
Technician: = "Y r s. Site e
Date: `�
,,. Lute:
?"," . „f �z*:�: ,� .> ,_"'�"°"�*: t,.8ke hgato-.,� ';. i; a�, �"a..
A0, MACTEC----- 8 - 0
0
UP Code Units
MACTEC Engineeringand lting Services, Inc.
t Y of , Suite1 180040
Charges
Charlotte, NC 28208 180100 Mileage
174822 Supplies
Project #
J - .,. :.. Cost Center Page of
Task
Project N arse: ' "_ Project Manager
Date deeded: Time Needed
Location: r.. Requested by { t}:
Order Taken By:__Type of Work Requested
Project Contact { Contractor,
On Site Time: toTravel: to
On Site Time: to Travel: to
Office Time: toMileage:
Total Time (includes site and Office Only): Regular: Overtime:
Total Time (travel only): RegulanOvertime:
Lintits of Work (MIMMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet - original and sketch)
Prooffolling (attach proofrolling sheet - original)
Concrete (Attach copies of cylinder card(s) - front and back)
Field Density Testing (brief summary below and sketch)
Structural Steel T, PT, UT, Visual Bolt Insp,)
Other (specify)
SUMMARY OF DAILY OBSERVATIONS AND TESTING
,.:.mot t ,.,.1�`1t:'"d �" .,.� .. y ,„ •
Circle ,appropriate Weather: dear Cloudy Showers Lt. Rain Heavy Rain Other:
Air Temperature: ,
ProjectManager: Dew Site Rep,:
Technician: Date: ` Date:
�, �
OMACT'EC UP Code
Units
MACTEC Engineering and Culti i 18
1 Yorkmont Road, Suitees
Charlotte, Mileage
174822 Supplies
Project # " " ' °; Cost Center Page of
Task'
Project Marne: ject alter /-
Date Needed; c Tune l�teede
Location: r ': eue ed y ( te):
Order Taken By:
Project Contact (#): Contractor:`
On Site Time: to el: to
On Site Time: toTravel: to
Office Time: to Mileage:
Total Time (includes site and Office Only): Regular, Overtime.,
Total Time (travel only): Regular: 10- Overt'
Limits of Work(MINIMUM INFORMATION REQUIRED)
Foundations (Brief Summary and attach A & P Sheet A original and sketch)
Proofrolling (Attach prootrolling sheet - original)
Concrete (Attach copies of cylinder card(s) - front and back)
Field. Density Testing Grief summary below and sketch)
Structural Steel T, RT, UT, Visual bolt Insp.)
Other (specify)
SUMMARY OF DAILY OBSERVA17ONS AND TESTING
Circle Appropriate Weather: Clear Cloudy ;Shovers Lt. main Heavy Rain Other;
Aar Temperature
Project Manager, Date: Site ep,..n r .t
Technician:" "�" �` ° `� ate: ate: