HomeMy WebLinkAboutB3-1627 ENG LTR GARAGE.PDFAZ:46 PM DAVID R BICKL-EY 7045856313 P.01
David R. BI*cWeyt P. L
158 WC9 Valley Lane, Stony PoW, NC 29678
Phone (704) 595-6305
Fax (704) 585-6313
devebic@trindsptil*.com
L------
S,2004 L L)
A 11 :,i I i :1 1 11 11
V`1111M��i M TOM i". I I
L On the ~door wall betwanthe bay window awithe edge of the garage door, Thisdistanceis
Approximately
2. On the lo&~ wall from the front left comer for a distance of eight fed, .7-
3On the back wall of the garage tom the 14 back comer for a distance of eight fba ;i—
of the OSB mm be nailed at T' c/c irdo the top and bottom plate and at 4" cJc everywhere else. At
ofthese locatior* screw the two bottom sill plates toggher wfth 44 10 x 3" long screws.
future Construction, I would not use the diagonal metal straps. The wenk Unk in that straps is
7 few usib typically used at each cad. Full height OSS pasels that or* sailed into the top *ad
-1M A plate pirovidt a much better transfer of uplift and shear fbrces. The OSD go must exten
we to the bottom of the sitt plates in order to transfer lateral load* and uplift loads Into the
I aftel" sachem I am prefer anchor bolts over madail sachem Anchor bolts have higher upi
r values than the soudsill sachem