HomeMy WebLinkAboutBLD03-706-ENG.PDFSTRUCTURAL INTEGRITY ENGINEERING, P'. A.
315 East Main Strect, Suite A Phone 704-989-7712
Pineville, NC 28134 Fax 704-889-7713
6TOMHUMMI
NexHomes
Attn: Bradford W. Lee
P.O. Box 4390
Mooresville, NC 28117
MEIMM
U4 to pertbrin
a structural inspection. The purpose of this mspection was to review several itans
A rought to your attention by a County Code Official. The items reviewed were as
follows:
#
Ewa IMPON
In order to get this situation rectified, an additional 2-ply 13/4"x 14" LVL ridge
beam must be installed underneath the exiting installed ridge beam and it will
span from load bearing wall to load bearing wall. There are to be three (3) stu
below each end of this newly installed 2-ply 13/4"x 14" LVL ridge beam and the
point loads should be solidly blocked down to the 2x6 wall with the 3-ply
1 '/4"x 16" LVL beam installed in the Basement. I
This report represents our best judgments, and opinions based on calculations, site
observations, and our experience. The scope of our evaluation was limited to the content
of this report. If we can be of any further assistance to you with regards to this structure,
please do not hesitate to call. Our office phone number is 704-889i-7712.