Loading...
HomeMy WebLinkAboutBLD03-706-ENG.PDFSTRUCTURAL INTEGRITY ENGINEERING, P'. A. 315 East Main Strect, Suite A Phone 704-989-7712 Pineville, NC 28134 Fax 704-889-7713 6TOMHUMMI NexHomes Attn: Bradford W. Lee P.O. Box 4390 Mooresville, NC 28117 MEIMM U4 to pertbrin a structural inspection. The purpose of this mspection was to review several itans A rought to your attention by a County Code Official. The items reviewed were as follows: # Ewa IMPON In order to get this situation rectified, an additional 2-ply 13/4"x 14" LVL ridge beam must be installed underneath the exiting installed ridge beam and it will span from load bearing wall to load bearing wall. There are to be three (3) stu below each end of this newly installed 2-ply 13/4"x 14" LVL ridge beam and the point loads should be solidly blocked down to the 2x6 wall with the 3-ply 1 '/4"x 16" LVL beam installed in the Basement. I This report represents our best judgments, and opinions based on calculations, site observations, and our experience. The scope of our evaluation was limited to the content of this report. If we can be of any further assistance to you with regards to this structure, please do not hesitate to call. Our office phone number is 704-889i-7712. Z�