Loading...
HomeMy WebLinkAboutB3517_TERMITEREPORT.PDFPEST CONTROL lr- Job Name*.`/ Date: l -3° d'A — Areas to be treated: To the General Contractor, Construction Superintendent, or other Responsible Party, y r The Dursban TC lermiticide label requires that yube notified label furtheray s treatment, including the intended sile(s) of application. requires that we instruct you to notify construction workers the termand ther Indscide its duals to leave the area to be treated during applicationand Untabsorbed into the soil. If the concrete Slab(s) cannot be poured over the soil tho same ay it has been treated, the label recommends that ; vapor . plicide barrier. placed over tile Dodson Bros. has treated soil to prevent disturbance of tile e not been contracted to install the vapor barrier. Sincerely, Dodson Bros. Exterminating Co., Inc. 0