Job Name.-
Date:
Areas to be treated: -tip S d
To the General Contractor, Construction Superintendent, or other
Responsible Party,
The Dursban TC termilicide label requires that you be notified of today's
treatment, including the intended sites) of application. The label further
requires that we Instruct you to notify construction workers and other individuals
to leave the area to be treated during application and until the termilicide is
absorbed into the soil.
If the concrete slab(s) cannot be poured over the soil the same day it has
been (reeled, the label recommends that a vapor barrier be placed over the
treated soil to prevent disturbance of the termiticide barrier. Dodson Bros. has
not been contra(;(ed to install the vapor barrier.
Sincerely,
Dodson Bros. Exterminating Co., Inc.