Loading...
HomeMy WebLinkAboutBLD03-00317 TERMITE REPORT.PDFr , 1 1 1 PEST CONTROL )_G C� 3 — cc) 3 0 Job Name.- Date: Areas to be treated: -tip S d To the General Contractor, Construction Superintendent, or other Responsible Party, The Dursban TC termilicide label requires that you be notified of today's treatment, including the intended sites) of application. The label further requires that we Instruct you to notify construction workers and other individuals to leave the area to be treated during application and until the termilicide is absorbed into the soil. If the concrete slab(s) cannot be poured over the soil the same day it has been (reeled, the label recommends that a vapor barrier be placed over the treated soil to prevent disturbance of the termiticide barrier. Dodson Bros. has not been contra(;(ed to install the vapor barrier. Sincerely, Dodson Bros. Exterminating Co., Inc. 0 nrw V20216-91)