Loading...
HomeMy WebLinkAboutB2002-940 ENG LTR RADIANT FLR.PDFMechanical Component Details "Munchkin" boiler, 199,000 BTU/Hr. input, 92% efficiency, condensing boiler. Follow manufacturer's installation and venting instructions Provide a minimum of 10' of 3/4" gas line between the gas regulator and the boiler. PEX 1/2" nom. radiant floor distribution tubing with footage markers. 300' +/- 10% loop lengths. Distribution layout by Mechanical Contractor. Adequately support the radiant distribution tubing to prevent "floating" in wet concrete. Sleeve radiant distribution tubing as it enters and exits the concrete slab to protect it from damage. Pressure test the radiant floor distribution to 100 psi. prior to inspection. Keep pressure on during pour. 1" copper radiant floor manifolds. Individual adjustment valves on supply side. No valves required on return side. Tekmar 353 Injection pump controller with outside reset. Outside sensor to be located in shaded area and away from external heat sources. Inside sensor to be securely straped to the supply pipe 12" downstream of the supply pump. Taco "0011" cast iron circulator pumps for "Injection" and floor circulation O'ESS1041 RY 69 c `.,ter 4�Vo G. Fy W * 1/014 7 3 SunQest, Inc 1555 Rankin Ave Newton, NC 28658 828-465-6805 Blue Ridge Harley Davidson Building Drawn By: Radiant Floor Mechanical Details Date: lya �f1�