Loading...
HomeMy WebLinkAboutMODIFICATION OF BASIN 7 & 8 10-30-08.TIFCATAWBA COUNTY Utilities and Engineering PO Box 389: 100 -A South Wes[ Boulevard: Newton, NoM Caroline 28658 -0389 - Telephone (828)465-82M btip: / /www.caMwbmmntyne.gov Fax (828) 465 -8392 October 30, 2008 Rock Barn Properties, Inc. 3791 Clubhouse Drive NE Conover, NC 28613 -9456 RE: Modification of Walnut Ridge at Rock Barn Case Number: ECP2008 -00016 Dear Mr. Woodlief after discussion and site visit on October 30, 2008, 1 approved the following modifications to the Walnut Ridge at Rock Barn erosion control plans. Sheet 3 of 21 shows two small sediment basins on the east side of the creek crossing (TSB #7 and TSB #8). By grading the roadway bed and stabilizing the roadway shoulders, the two small sediment basins may be eliminated. The storm water that falls in the roadway bed will be redirected along what will eventually be the gutter line, into a slope drain and thus into TSB #10. The roadway shoulders and other disturbed areas adjacent and draining to the two small ponds will be seeded immediately upon completion of rough grading. Storm drain installed at a later date will be adequately protected until the site is stabilized. Additional measures may be required as field conditions dictate Thank you for your cooperation and good site work. Sincerely, Toni Norton, P.E. Water Resources Engineer Cc: File Neill Grading "Keeping the Spirit Alive Since 1842!" ' Pvt. O�xWE f' C 9� f �'Ito�� +'�1��" kk � k ►+ ' II . i T