HomeMy WebLinkAboutTPI2008-00025 STATEMENT OF RESPONSIBILITY FROM MATTHEWS.TIF1"
I '
Contractor's Statement of Responsibility
Each contractor responsible for the construction or fabrication of a system or component
designated in the Quality Assurance Plan must submit a Statement of Responsibility.
Project: Pin Station Addition - Newton, NC
Contractor's Name: Matthews Construction Co., Inc.
Address: 210 First Ave. South Conover, NC 28613
License No.: 4280
Description of designated building systems and components included in the Statement of
Responsibility:
Concrete Footings /Foundation System
Structural Steel Erection
Contractor's Acknowledgment of Special Requirements
I hereby acknowledge that I have received, read, and understand the Quality Assurance Plan and
Special Inspection program.
I hereby acknowledge that control will be exercised to obtain conformance with the construction
documents approved by the Building Official.
�-..� to -3•- °s
Signat a Date
Contractor's Provisions for Quality Control
Procedures for exercising control within the contractor's organization, the method and frequency
of reporting and the distribution of reports is attached to this Statement.
Identification and qualifications of the person(s) exercising such control and their position(s) in the
organization are attached to this Statement.
SEE ATTACHED LETTER
• Contractor's Statement of Responsibility •