HomeMy WebLinkAboutTPI2008-00009 FINAL REPORTS AND DISCREPANCY NOTICES.TIFAppendix A Blank Forms
Monthly Engineers Summary Report
Catawba County, North Carolina
Date 5 -6 -08 TPI Permit# 2008 -00009 Report # I
® Monthly Summary Report Covering Daily Reports dated: From 4 -15 - - 0 8 T 4 - 2 9 - 0 8
® Summary Report Covering Laboratory Test Results dated 5-6-08
Describe inspections made: observations of R Wall Construction
Describe tests made (attach copy of test results) : Field Compaction Testing of
Retaining Wall Backfill.
Discrepancy, list items requiring correction, corrections of previous listed items and previously listed
uncorrected items:
All Discrepancies Noted in the Fie Daily Reports Have Been
Corrected.
List changes to approved plans authorized by architect or engineer: N/A
Comments: None
To the best of my knowledge, work inspected and tests reviewed are in accordance with the building
services division approved design drawing, specifications and applicable workmanship provisions of the
NC State Building Code except as noted above.
Prepared By:
Printed Name: geaAEL, U) . 6l.n4.J
Date: S - Co - O$
O� Ess R0�
'ttiL �.
025776
C�FNGIN E�P'�1�
( This report to be furnished to the code enforcement official at time of TPI scheduled site inspections.)
Page 68