HomeMy WebLinkAbout1859 KALE RD 6-15-09.PDFSEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Dirt removal on bank behind house Project Number EVO2009-00060 Person Financially Responsible Jackie Louis Stutts Address 1859 Kale Rd, Catawba, NC 1. Project Location 1859 Kale Rd, Catawba, NC Pictures: Prints Slides Digital Video 2. Weather and Soil Conditions Overcast, muddy 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and fills too steep 31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain erosion control measures 31-13 e. Insufficient measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe): 6. Phase of Grading a. rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: Degree of damage: Slight Moderate Severe 9. Contact made with (name)Jackie Stutts Title Property owner Inspection report in case file due to no activity given or sent to Person Financially Responsible. Date given/sent: 6-15-09 10. Corrective actions needed: Please fill out all the attached documents and submit to Catawba County with the applicable fee. Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation and erosion control measures as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated diversions as shown on the approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract: Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations: Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the following areas: Provide adequate permanent ground cover on all areas where development has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters): Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including the following locations: 11. Comments: Propety owner installed a temp. silt fence along the roadway and toe of bank. They used the silt fence with the wooden stakes which is temp. until they can install the more perm. one with the wire backing & steel post. I stressed to the property owner to check the silt fence regularly since they didn't trench in the fence. The heavy rains might wash the dirt they put on the bottom of the fence allowing the sediment & mud to undermine the fence. No activity since last inspection: Report by: Kim Sue Others present: Date of inspection: 6-15-09 Time arriving at site: 2:30 Time leaving site: 3:00 cc: , ,