HomeMy WebLinkAbout1058 13TH AVE CIR NE 4-7-09.PDFSEDIMENTATION INSPECTION REPORT
CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
PO Box 389, Newton, NC 28658
(828) 465-8161 FAX (828) 465-8392
Project Single Family Dwelling
Person Financially Responsible Mitcheo Contractors Inc.
Address 3251 5ch St Ct NW, Hickory, NC 28601
1. Project Location 1058 131h Ave Cir NE, Hickory, NC
2. Weather and Soil Conditions Cold, damp
3. Is site currently under notice of violation?
Project Number EV02008-00074
Pictures: Prints ❑ Slides ❑ Digital ® Video ❑
Yes ❑ No ® If no, check violations below:
5. Violations (refer to Catawba County Local Ordinance Chapter 31):
❑ a. No approved plan 31-4 ( c ) ❑ g. Inadequate buffer zone 31-5 (a) (1)
❑ b. Failure to follow approved plan 31-5 (f) ❑ h. Graded slopes and fills too steep 31-5 (b)
❑ a. Failure to submit revised plan 31-6 (m) ® i. Unprotected exposed slopes 31-5 (b)
® d. Failure to provide adequate groundcover 31-5 (d) ❑ j. Failure to maintain erosion control measures 31-13
❑e. Insufficient measures to retain sediment on site 31-7 (e) ❑ k. Notice of activity initiation 31-6 0)
® f. Failure to take all reasonable measures 31-4 (d) ❑ 1. Other (describe):
6. Phase of Grading
❑a. rough grading complete ❑ b. final grading complete
Description:
7. Potential NPDES Permit violation? Yes ❑ No ❑ Describe
8. Has sedimentation damage occurred? Yes ❑ If yes, where? (check all that apply) No
Lake/natural watercourse on the tract ❑ Lake/natural watercourse off the tract ❑ Other property ❑ Road/walkway ❑
Description:
Degree of damage: Slight ❑ Moderate ❑ Severe ❑
9. Contact made with (name)n/a Title
Inspection report in case file due to no activity ❑ given ❑ or sent ® to Person Financially Responsible. Date given/sent: 4-7-09
10. Corrective actions needed: All disturbed areas need temp or perm groundcover.
❑ Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed.
❑ Submit a revised sedimentation and erosion control plan for approval for the following areas:
❑ Install all sedimentation and erosion control measures as shown on the approved plan, including but not limited to the following locations:
❑ Install temporary sediment traps, basins and rock dams and associated diversions as shown on the approved plan, including but not limited to the
following locations:
❑ Install erosion and sediment control devices sufficient to retain sediment on the tract:
❑ Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations:
® Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar
days, including the following areas: All disturbed area around the structure needs temp or perm groundcover.
❑ Provide adequate permanent ground cover on all areas where development has been completed for 15 working or 90 calendar days, whichever
is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters):
❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage
including the following locations:
11. Comments:
❑ No activity since last inspection:
Report by: Kim Sue Others present:
Date of inspection: 4-7-09 Time arriving at site: 9:40 Time leaving site: 9:40
cc: