SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project 4 Lots Shuford Site Project Number
ECP2008-00006 Person Financially Responsible Delco I LLC Address PO Box 3224, Hickory, NC 28603 1. Project Location 2424 Century Pl, Hickory, NC 28601 Pictures: Prints Slides Digital
Video 2. Weather and Soil Conditions warm, windy 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance
Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and fills too steep 31-5 (b) c. Failure
to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain erosion control measures 31-13 e. Insufficient
measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe): 6. Phase of Grading a.
rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all
that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: Degree of damage: Slight Moderate Severe 9. Contact
made with (name) Title Inspection report in case file due to no activity given or sent to Person Financially Responsible. Date given/sent: 10. Corrective actions needed: Submit an adequate
sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following
areas: Install all sedimentation and erosion control measures as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins
and rock dams and associated diversions as shown on the approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to
retain sediment on the tract: Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations: Provide adequate temporary or
permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the following areas: Provide adequate permanent ground cover
on all areas where development has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters):
Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including the following locations: 11. Comments:
The area where Neill Grading was getting dirt needs to be stabalized. I called Jan Wilson and left a message for him to call me. Also the silt fence needs to be repaired. No activity
since last inspection: 1-24-11 Report by: Kim Sue Others present: Date of inspection: 2-25-11 Time arriving at site: Time leaving site: cc: , ,