Loading...
HomeMy WebLinkAboutCBPR-1-11-9088 Engineer Comments.tif Jeremy E. Norman, PE 508 2 " Avenue, NW Conover, NC 28613 r February 9, 2011 Catawba County Plan Review 76 North Center Street Hickory, NC 28601 RE: Gaston Rentals Equipment Wash Building 349 Lenoir Rhyne Blvd, SE CBPR -1 -11 -9088 s Dear Sirs; i i Per your plan review comments dated 2/4/11, I have revised the plans for the above' referenced project as follows: . 1. Sheet 2-Appendix B has been revised to show the occupancy classTication as Business. 2. Plan Detail 1/3 on Sheet 3 shows the proposed drain line from the trench in the wash bay to the Oil/Water Separator and on to the sanitary sewer system:'' plan also shows the existing water line and yard hydrant that will be utilized for the pressure washing activities as well as note addressing the washing activity. 3. Plan Detail 1/3 on Sheet 3 shows the new underground conduit and electrical line that will be connected to the control panel supplied with the Oil/Water Separator unit. There is no other electrical work to be performed as part of this project. Let me know if you have any other questions. Regards, t ttllilA 4 43d /j Jeremy E. Norman, PE o SEAL 0 a��� `Ni i Q:•��, s Jeremy E. Norman, PE 508 2 " Avenue, NW Conover, NC 28613 s February 9, 2011 Catawba County Plan Review 76 North Center Street Hickory, NC 28601 RE: Gaston Rentals Equipment Wash Building 349 Lenoir Rhyne Blvd, SE CBPR -1 -11 -9088 Dear Sirs; Per your plan review comments dated 2/4/11, I have revised the plans 110 < 1% above referenced project as follows:' 1. Sheet 2— Appendix B has been revised to show the occupancy classification as Business. 2. Plan Detail 1/3 on Sheet 3 shows the proposed drain line from the trench in the wash bay to the Oil /Water Separator and on to the sanitary sewer systerri: "Th>s plan also shows the existing water line and yard hydrant that will be utilized for the pressure washing activities as well as note addressing the washing activity. 3. Plan Detail 1/3 on Sheet 3 shows the new underground conduit and electrical line that will be connected to the control panel supplied with the Oil /Water Separator unit. There is no other electrical work to be performed as part of this project. Let me know if you have any other questions. Regards, ed ge 9 e A s as�as Jeremy E. Norman, PE ° b fpm a SEAL