HomeMy WebLinkAboutCBPR-1-11-9088 Engineer Comments.tif Jeremy E. Norman, PE
508 2 " Avenue, NW
Conover, NC 28613 r
February 9, 2011
Catawba County Plan Review
76 North Center Street
Hickory, NC 28601
RE: Gaston Rentals
Equipment Wash Building
349 Lenoir Rhyne Blvd, SE
CBPR -1 -11 -9088
s
Dear Sirs;
i
i
Per your plan review comments dated 2/4/11, I have revised the plans for the above'
referenced project as follows: .
1. Sheet 2-Appendix B has been revised to show the occupancy classTication as
Business.
2. Plan Detail 1/3 on Sheet 3 shows the proposed drain line from the trench in the
wash bay to the Oil/Water Separator and on to the sanitary sewer system:''
plan also shows the existing water line and yard hydrant that will be utilized for
the pressure washing activities as well as note addressing the washing activity.
3. Plan Detail 1/3 on Sheet 3 shows the new underground conduit and electrical line
that will be connected to the control panel supplied with the Oil/Water Separator
unit. There is no other electrical work to be performed as part of this project.
Let me know if you have any other questions.
Regards,
t ttllilA 4 43d /j
Jeremy E. Norman, PE
o
SEAL
0
a��� `Ni i Q:•��,
s
Jeremy E. Norman, PE
508 2 " Avenue, NW
Conover, NC 28613 s
February 9, 2011
Catawba County Plan Review
76 North Center Street
Hickory, NC 28601
RE: Gaston Rentals
Equipment Wash Building
349 Lenoir Rhyne Blvd, SE
CBPR -1 -11 -9088
Dear Sirs;
Per your plan review comments dated 2/4/11, I have revised the plans 110 < 1% above
referenced project as follows:'
1. Sheet 2— Appendix B has been revised to show the occupancy classification as
Business.
2. Plan Detail 1/3 on Sheet 3 shows the proposed drain line from the trench in the
wash bay to the Oil /Water Separator and on to the sanitary sewer systerri: "Th>s
plan also shows the existing water line and yard hydrant that will be utilized for
the pressure washing activities as well as note addressing the washing activity.
3. Plan Detail 1/3 on Sheet 3 shows the new underground conduit and electrical line
that will be connected to the control panel supplied with the Oil /Water Separator
unit. There is no other electrical work to be performed as part of this project.
Let me know if you have any other questions.
Regards,
ed ge 9 e A s as�as
Jeremy E. Norman, PE °
b fpm
a
SEAL