HomeMy WebLinkAboutCBPR-9-10-7421 Architect comments.tif s Y a G MACKIE JOHNSON, ARCHITECT OFFICE: 828 -464 -1028 FAx: 828 - 465 -4562 MAILING ADDRESS SHIPPING ADDRESS P. O. Box 428 11 C AVENUES W CONOVER, N. C. 28613 ONOVER, N. C. 28613 r, MJA @MACKI EJOHNSON.COM JANUARY 3, 2011 ` M PROJECT CONSTRUCTION MEMO (PLAN REVIEW COMMENTS) NUMBER (RESPONSE TO CODE COMMENTS DATED 10- 01 -10) DELIVERY: HAND DELIVERY - ONLY I PROJECT: A NEW BUILDING FOR: I PAW TALES CONTRACTOR: DAVID E. LOOPER, INC. FROM: BARRY (CARD, AIA - MACKIE JOHNSON, ARCHITECT 6 TO: CATAWBA COUNTY — CLARA COULBOURNE HICKORY DEVELOPMENT ASSISTANT CENTER COPY TO: BRIAN WALKER -DAVID E. LOOPER, INC REFERENCE: REPLY TO REVIEW COMMENTS DATED 10 -01 -10 BUILDING STATUS: (COMPLETE- DISAPPROVED) Comment # 1: A written response to the comments in the order they appear in this correspondence as well as appropriate clouded revisions to the plans shall be provided. (We shall comply) Comment # 2: Sheet 2 of 5: Provide a handicap accessible path from the 3 doors to the exterior dog run to the public way per 2009 NCBC 1007.2 (See attached revised drawing A1.0) Comment # 3: Drawing A1.0: Provide a handicap accessible path from the 3 doors to the exterior dog run to the public way per 2009 NCBC 1007.2 (See attached revised drawing A1.0 and Chapter 1007.1 NCBC.) Comment # 4: Drawing A1.0: Provide information for Luxury Spa swimming pool (location of pumps and filters, size and depth of pool, etc.) Pool must meet requirements of 2009 NCBC 3109.3, 3109.5, and 2008 NEC, Article 680. (See attached drawing PH1.0) PAGE 1 OF 4 t M L) G MACKIE JOHNSON, ARCHITECT OFFICE: 828- 464 -1028 FAx: 828 - 465 -4562 MAILING ADDRESS SHIPPING ADDRESS P. O. Box 428 11 4 TH AVENUE S W CONOVER, N. C. 28613 ONOVER, N. C. 28613 MJA@MACKIEJOHNSON.COM JANUARY 3, 2011 • w PROJECT CONSTRUCTION MEMO (PLAN REVIEW COMMENTS) NUMBER (RESPONSE TO CODE COMMENTS DATED 10- 01 -10) DELIVERY: HAND DELIVERY - ONLY PROJECT: A NEW BUILDING FOR: PAW TALES CONTRACTOR: DAVID E. LOOPER, INC. FROM: BARRY ICARD, AIA - MACKIE JOHNSON, ARCHITECT TO: CATAWBA COUNTY — CLARA COULBOURNE HICKORY DEVELOPMENT ASSISTANT CENTER COPY TO: BRIAN WALKER -DAVID E. LOOPER, INC REFERENCE: REPLY TO REVIEW COMMENTS DATED 10 -01 -10 BUILDING STATUS: (COMPLETE - DISAPPROVED) Comment # 1: A written response to the comments in the order they appear in this correspondence as well as appropriate clouded revisions to the plans shall be provided. (We shall comply) Comment # 2: Sheet 2 of 5: Provide a handicap accessible path from the 3 doors to the exterior dog run to the public way per 2009 NCBC 1007.2 (See attached revised drawing A1.0) Comment # 3: Drawing A1.0: Provide a handicap accessible path from the 3 doors to the exterior dog run to the public way per 2009 NCBC 1007.2 (See attached revised drawing A1.0 and Chapter 1007.1 NCBC.) Comment # 4: Drawing A1.0: Provide information for Luxury Spa swimming pool (location of pumps and filters, size and depth of pool, etc.) Pool must meet requirements of 2009 NCBC 3109.3, 3109.5, and 2008 NEC, Article 680. (See attached drawing PH1.0) PAGE 1 OF 4 1 Comment # 5: Drawing A1.0: Doors # 120A and 1208 shall meet the requirements of 2009 NCBC 3109.3 for closing and latching. (See attached revised drawing A4.0) Comment # 6: r Drawing A2.2: Clearances to mantel above gas logs to be per gas log manufacturers installation instructions. (We shall comply) Comment # 7: Drawing A4.0: Doors # 120A and 120B shall meet the requirements of 2009 NCBC 3109.3 for closing and latching. (See attached revised drawing A4.0) Comment # 8: Drawing A4.0: Remove the Note: "tempered where required by local building code" and indicate all required tempered glass. (See attached revised drawing A4.0) Comment # 9: i Drawing A5.0: Draft - stopping not to exceed 3000 sq. ft. per 2009 NCBC 717.4.3. (See attached revised drawing A5.0) Comment # 10: Drawing A5.1 and A5.2: Some of the notes can't be read due to small size. Revise as required. (See attached revised drawing A5.1 and A5.2) Comment # 11: Drawing A6.0: Coordinate thickness of roofing underlayment with structural drawings and revise as required. (See attached revised drawing A6.0) Comment # 12: Drawing A6.0: Provide detail of attic draft - stopping being extended down to dropped ceilings. (See attached revised drawing A6.0 detail 1) Comment # 13: Drawing A6.1: Coordinate thickness of roofing underlayment with structural drawings and revise as required. (See attached revised drawing A6.1) Comment # 14: Drawing A6.1: General Note: -- All buildings signage to be permitted and approved separately from building drawings. (See attached revised drawing A6.1) Comment # 15: Drawing S -5: Verify that the depth of the bathing /drying tub(swimming pool) in detail #4 will not interfere with the bearing plane of the footing adjacent to the pool. (pool size has been revised and does not interfere with the bearing plane.) Comment # 16: t Drawing P2.0: Floor drain (P13) and wash bay (P23) in room #113 do not appear on the isometric. (We shall comply) " PAGE 2OF4 Comment # 5: Drawing A1.0: Doors # 120A and 120B shall meet the requirements of 2009 NCBC 3109.3 for closing and latching. (See attached revised drawing A4.0) Comment # 6: Drawing A2.2: Clearances to mantel above gas logs to be per gas log manufacturers installation instructions. (We shall comply) Comment # 7: Drawing A4.0: Doors # 120A and 120B shall meet the requirements of 2009 NCBC 3109.3 for closing and latching. (See attached revised drawing A4.0) Comment # 8: Drawing A4.0: Remove the Note: "tempered where required by local building code" and indicate all required tempered glass. (See attached revised drawing A4.0) Comment # 9: Drawing A5.0: Draft - stopping not to exceed 3000 sq. ft. per 2009 NCBC 717.4.3. (See attached revised drawing A5.0) Comment # 10: Drawing A5.1 and A5.2: Some of the notes can't be read due to small size. Revise as required. (See attached revised drawing A5.1 and A5.2) Comment # 11: Drawing A6.0: Coordinate thickness of roofing underlayment with structural drawings and revise as required. (See attached revised drawing A6.0) Comment # 12: Drawing A6.0: Provide detail of attic draft - stopping being extended down to dropped ceilings. (See attached revised drawing A6.0 detail 1) Comment # 13: Drawing A6.1: Coordinate thickness of roofing underlayment with structural drawings and revise as required. (See attached revised drawing A6.1) Comment # 14: Drawing A6.1: General Note: -- All buildings signage to be permitted and approved separately from building drawings. (See attached revised drawing A6.1) Comment # 15: Drawing S -5: Verify that the depth of the bathing /drying tub(swimming pool) in detail #4 will not interfere with the bearing plane of the footing adjacent to the pool. (pool size has been revised and does not interfere with the bearing plane.) Comment # 16: Drawing P2.0: Floor drain (P13) and wash bay (P23) in room #113 do not appear on the isometric. (We shall comply) PAGE 2OF4 i �r Comment # 17: Drawing P2.0: Show bathing /drying tub (swimming pool) drainage, water supply, filtration lines, etc. on the isometric. (NOTE -the bathing /drying tube(swimming pool) will be treated as a swimming pool and shall meet the requirements of 2009 NCBC 3109.5 AND NEC Article 680) (See attached revised drawing P2.0) t Comment # 18: Drawing P2.0: Several traps shown with no fixture designations, Correct. I (See attached revised drawing P2.0) Comment # 19: Drawing P3.0: Provide drainage, equipment location, depth of water, etc. for the bathing /drying tub (swimming pool) in the luxury spa area. (See attached revised drawing P2.0 and PH1.0) Comment # 20: Drawing P4.0: Provide water supply, equipment location, etc. for the bathing /drying tub I (swimming pool) in the luxury spa area. (See attached revised drawing P4.0 and PH1.0) Comment # 21: Drawing P4.0: What is the purpose of terminating cold water main in end of trench drain? How do you purpose to prevent contamination from entering end of water main if trench drain becomes clogged? (See attached revised drawing P4.0 and PH1.0) Comment # 22: Sheet E2.0: All electrical in the vicinity of the swimming pool in the Luxury Day Spa area shall meet requirements of 2008 NEC Article 680. (See revised E2.0) Comment # 23: Sheet E2.0: What is the purpose of the exit sign near the last kennel in the economy day spa are ?. (See revised E2.0) FIRE STATUS: (PLAN RECEIVED - APPROVED WITH NOTES) Comment # 1: A Knox Box is noted to be installed, A Knox Box shall be installed and mounted in a location approved by a fire official. Knox Box ordering may be done by phone (1 -800- 552 -5669) or web site (knoxbox.com). (We shall comply) Comment # 2: The exit sign at the intersection of corridor 122 and 116 is directing egress into the kennel, correct. (We shall comply) Comment # 3: Street numbers shall be posted on the building and visible from the roadway. Numbers shall contrast with their background. Numbers shall be a minimum of 4 inches high with a minimum stroke width of 0.5 inches. (We shall comply) PAGE 3 OF 4 Comment # 17: Drawing P2.0: Show bathing /drying tub (swimming pool) drainage, water supply, filtration lines, etc. on the isometric. (NOTE -the bathing /drying tube(swimming pool) will be treated as a swimming pool and shall meet the requirements of 2009 NCBC 3109.5 AND NEC Article 680) * (See attached revised drawing P2.0) Comment # 18: Drawing P2.0: Several traps shown with no fixture designations, Correct. (See attached revised drawing P2.0) Comment # 19: Drawing P3.0: Provide drainage, equipment location, depth of water, etc. for the bathing /drying tub (swimming pool) in the luxury spa area. (See attached revised drawing P2.0 and PH1.0) Comment # 20: Drawing P4.0: Provide water supply, equipment location, etc. for the bathing /drying tub (swimming pool) in the luxury spa area. (See attached revised drawing P4.0 and PH1.0) Comment # 21: Drawing P4.0: What is the purpose of terminating cold water main in end of trench drain? How do you purpose to prevent contamination from entering end of water main if trench drain becomes clogged? (See attached revised drawing P4.0 and PH1.0) Comment # 22: Sheet E2.0: All electrical in the vicinity of the swimming pool in the Luxury Day Spa area shall meet requirements of 2008 NEC Article 680. (See revised E2.0) Comment # 23: Sheet E2.0: What is the purpose of the exit sign near the last kennel in the economy day spa are ?. (See revised E2.0) FIRE STATUS: (PLAN RECEIVED - APPROVED WITH NOTES) Comment # 1: A Knox Box is noted to be installed, A Knox Box shall be installed and mounted in a location approved by a fire official. Knox Box ordering may be done by phone (1 -800- 552 -5669) or web site (knoxbox.com). (We shall comply) Comment # 2: The exit sign at the intersection of corridor 122 and 116 is directing egress into the kennel, correct. (We shall comply) Comment # 3: Street numbers shall be posted on the building and visible from the roadway. Numbers shall contrast with their background. Numbers shall be a minimum of 4 inches high with a minimum stroke width of 0.5 inches. (We shall comply) PAGE 3OF4 3 N 3 M Comment # 4: Portable fire extinguishers shall be selected, installed and maintained in accordance with Section 906 of the 2006 North Carolina Fire Prevention Code and NFPA 10. (WE SHALL COMPLY) Comment # 5: Storage of hazardous materials and flammable /combustible liquids is not allowed over i the exempt amounts. (WE SHALL COMPLY) Comment # 6: In public areas of Business and Mercantile occupancies the minimum clear aisle width shall be determined by Section 1005.1 of the 2009 Building and Fire Code for the occupant load served, but shall not be less than 36 inches. (WE SHALL COMPLY) Comment # 7: The required width of any portion of a means of egress shall not be obstructed by decorative vegetation. Artificial decorative vegetation shall meet the flame propagation performance criteria of NFPA 701. Meeting the flame propagation performance criteria of j NFPA 701 shall be documented and certified by the manufacturer in an approved manner. (WE SHALL COMPLY) Comment # 8: See 09 North Carolina Building Code Chapter 33 Safeguards During Construction and sections of 09 North Carolina Fire Prevention Code Chapter 14 Fire Safety During Construction and Demolition that would be applicable to this project. (WE SHALL COMPLY) Comment # 9: The building or structure shall not be occupied prior to the code official issuing a permit that indicates that applicable provisions of the NC Fire Code has been met. (WE SHALL COMPLY) Comment # 10: Occupant shall obtain a Fire Department Use Permit. (WE SHALL COMPLY) Please contact if assistance or questions regarding plan review comments: Kelly Davis Plans Examiner Hickory Fire Prevention Bureau 76 N. Center Street NE Hickory, NC 28601 (828) 323 -7522 - phone (828) 323 -7476 - fax kdavis @ci.hickory. nc. us ZONING STATUS: (APPROVED) ATTACHMENTS:FOUR SETS OF REVISED DRAWINGS ONLY PAGE 4OF4 END OF PROJECT CONSTRUCTION MEMO NUMBER ONE t r Comment # 4: Portable fire extinguishers shall be selected, installed and maintained in accordance with Section 906 of the 2006 North Carolina Fire Prevention Code and NFPA 10. (WE SHALL COMPLY) Comment # 5: Storage of hazardous materials and flammable /combustible liquids is not allowed over the exempt amounts. (WE SHALL COMPLY) Comment # 6: In public areas of Business and Mercantile occupancies the minimum clear aisle width shall be determined by Section 1005.1 of the 2009 Building and Fire Code for the occupant load served, but shall not be less than 36 inches. (WE SHALL COMPLY) Comment # 7: The required width of any portion of a means of egress shall not be obstructed by decorative vegetation. Artificial decorative vegetation shall meet the flame propagation performance criteria of NFPA 701. Meeting the flame propagation performance criteria of NFPA 701 shall be documented and certified by the manufacturer in an approved manner. (WE SHALL COMPLY) Comment # 8: See 09 North Carolina Building Code Chapter 33 Safeguards During Construction and sections of 09 North Carolina Fire Prevention Code Chapter 14 Fire Safety During Construction and Demolition that would be applicable to this project. (WE SHALL COMPLY) Comment # 9: The building or structure shall not be occupied prior to the code official issuing a permit that indicates that applicable provisions of the NC Fire Code has been met. (WE SHALL COMPLY) Comment # 10: Occupant shall obtain a Fire Department Use Permit. (WE SHALL COMPLY) Please contact if assistance or questions regarding plan review comments: Kelly Davis Plans Examiner Hickory Fire Prevention Bureau 76 N. Center Street NE Hickory, NC 28601 (828) 323 -7522 - phone (828) 323 -7476 - fax kdavis @ci. hickory. nc. us { ZONING STATUS: (APPROVED) ATTACHMENTS: FOUR SETS OF REVISED DRAWINGS ONLY PAGE 4 OF 4 END OF PROJECT CONSTRUCTION MEMO NUMBER ONE