Loading...
HomeMy WebLinkAboutAUTH-08-2023-201639.TIF FONCATAWBA COUNTY Cased At 1 H 08-2023-201639 Ot. ..01) Public Health Department Subdivision Environmental Ilcalth Division PINK 269918411689 PO Box 389.25(iovemment Drive_Newton.NC' 28658 I Mk 18.1 9. Site Address: 5340 S NC 127 HWY. HICKORY NC 28602 Name on Permit: BUMGARNER OIL CO INC Property Size: Acres 2.71 Directions: 5340 S NC 127 Hwy Authorization to Construct Permit Permit Category: Repair/Expansion Wastewater Flow: 1,741 g,p_d. Type of Facility: Business-Convenience store and restaurant Basement? No Basement Plumbing? No Bedrooms: Water Supply: Public Water Maximum Occupants: Soil LTAR: 0.25 g.p.d./ft2 WASTEWATER SYSTEM REQUIREMENTS Proposed Wastewater System: 25%REDUCTION PRODUCT, NO REDUCTION GIVEN System Classification: IIIB-SYSTEM W/SINGLE EFFLUENT PUMP Septic Tank: New Tank: 2500 gal Pump Tank 2,500 gal Grease Trap 1,500 gal Dosing Volume 682 gal Pump Specs: 87.23 GPM @ 21.39 TDH Pressure Head 3 ft Draw Down 17 in Drainfield: Total Area sq ft Total Trench Length: 390 ft Aggregate Depth: in Maximum Trench Depth on Downhill Sidewall 34 in Minimum Soil Cover 6 in Minimum Trench Separation 9 ft on center Number of Drain Lines_ 3 Trench Width: 3 ft Distribution: Pressure Manifold Pre Treatment NONE Pump Required Additional Specifications: *The current drain field has 10 lines of 120'each for a total of 1,200'. Three new 130'lines will be added for a total drain field system of 1,590'. `Three new taps can be added to the existing pressure manifold box by using the punch outs located on the back of the box. The three new taps will be 1/2"SCH 80. *The supply line running from the pump tank to the pressure manifold must be 3"pipe. If the current supply line is less than 3", it must be replaced. *The existing septic tank and pump tank are undersized for the proposed system expansion. Each tank will need to be upgraded to 2.500 gallons. 'The existing pump in the pump tank will need to be evaluated to determine whether a new pump will be needed to meet the new design specifications. *See the pressure manifold spec sheet for the pump design specifications. See also attached site plan. Landscaping or other site alterations that potentially divert groundwater or surface water toward the septic system. or prevent proper drainage away from the septic system, including the direction of gutter flows or foundation drains, is not approved, and may result in failure to approve the initial system installation, or the suspension/revocation of existing permits. >>>>> Do not install system under wet conditions ««< PROPOSED REPAIR Repair System Required? Not Required Soil LIAR: 0.25 g.p.d./ft2 08;16i2023 l 1:11