WINSTEAD 0 ARCHITECTURE, PLLC
22 North Main Avenue P.O. Box 321 E -mail: winarch @bellsouth.net
Newton, North Carolina 28658 Telephone: (828) 464 -2829
Fax: (828) 4643229
October 25, 2010
City Of Hickory
Building Inspection Department
Attn: James Lamb
PO Box 368
Hickory, NC 28603
Re: Loe's Micro Brewery
Pin # 370307794702
Reference # BLDC -10 -10 -11979
Dear James,
Thank you for reviewing our project. We have addressed each of your concerns or
questions and have revised drawings when required to do so.
Building Review
1. This is the written response to your comments and clouded drawings are part of
the re- submittal.
2. James, this is an interior tenant upfit of a building that has already been submitted
and approved by your office. It is an existing site with existing accessibility
features. We are providing an entrance to this space right next to an entrance that
was approved with the building renovation submittal. I have provided a bulletin
drawing BD2 showing where the nearest accessible handicapped spaces and
accessible route are.
3. I can provide a complete life safety plan, I assume however you should already
have a complete life safety plan from the buildings owner as part of the buildings
renovation. This is simply a small upfit of an already established space. See sheet
A3 for Life Safety Plan.
4. See revised sheet T1 showing the proper designation for the micro brewery.
5. See revised sheet A2 showing portion of counter to comply with Section 904.3 on
ANCI A117.1.
6. The opening we are creating is going into an opening that was previously an
opening so no additional support is required. However, if we find it is necessary
see sheet A2 showing steel lintel spec for renovation note # 1.
j 7. See sheet A2 showing details for the new partition walls shown.
! 8. This wall is existing and the UL #WS6 -2.1 has been sited and detailed on the
original building submittal. However, see revised sheet A3 showing the UL #
and detail.
! I
F
f
Member of the American Institute of Architects • National Council of Architectural Registration Boards Certified
PRE Z OF
9. See revised sheet A2 showing the door assembly changing to a 2 hr. rated door
kand frame complying with Table 715.4 NCBC. The existing door in the 2 hr:
rated assembly is not part of this project and is existing. The original plans for the
building show the 2 -hr wall continuing to the exterior and does not jog as
suggested. Our exit plan will show another exit that will fulfill the exiting
requirements for this project. That door is the main entrance to the restaurant.
10. The new door assembly has been revised to show no glass.
11. See c hee s fnr ernrinm .nt be'n »r ed. No mechanical hoods are required for
this project.
12. See bulletin drawing BD 1 showing location of mechanical unit. There is no other
added equipment or appliances on the roof. An outlet complying with the
requirements of Article 210.63 of the 2008 NEC will be provided if it is required.
13. See sheet PM & 2 showing DWV and water piping material specs. No
wastewater will be discharged into the building drainage system at a temperature
higher than 140° degrees Fahrenheit.
14. The sink is only being used for the sanitation of fittings, nozzles, etc. therefore,
the sink will tie directly into the plumbing system.
15. See sheet PM1 & 2 showing piping plan including all pipe sizes distances
gg pp gp g Pp ,
material, supply pressure and all connected loads in BTU/ hour.
s
16. See sheet PM1 & 2 showing the water supply for the trap primer is provided by
the one compartment sink that will be directly tied to the plumbing system at the
trench drain.
17. Hickory Utilities review comments and notes have been duly noted. See
comments to their comments below.
18. See combustion air data on sheet PM1 & 2.
19. Outdoor ventilation air to comply with Mechanical code is already provided in the
existing HVAC system. We are doing nothing to the existing HVAC system. The
ductless split unit is for cooling the storage room only.
20. All lighting and power is existing and will come from existing circuits on existing
panels.
21. There will be no combustible dust associated with the brewing process on this
project. The grain mill is not one that produces a fine powder or dust, rather the
grain is simply cracked open just enough to serve its purpose. No Class II
locations are being created.
Hickory Fire Department Review — Approved with Notes:
Kelly, we will address each of your concerns as they apply based on your notes.
Utilities — Approved with Notes
Jhank you for your time in reviewing our project and helping us through the process.
Please call if you have any further questions or concerns.
Sincerely,.��;
► C W c
. Stan instead, AIA `"'
s '
instead Architecture, PLLC. 5